The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

04/6435

WITHDRAWN

Cork - Cork County Council

Application Details

Location
Moanroe Minane Bridge
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
24 August 2004
Status
WITHDRAWN
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
07/7024CONDITIONAL13 Apr 2007

Conversion of attic to living accommodation and installation of 3 no. dormer windows to dwellinghouse

Moanroe Minane Bridge

3m
04/8028INCOMPLETED APPLICATION29 Oct 2004

Dwellinghouse

Moanroe Minane Bridge

3m
04/8456CONDITIONAL16 Nov 2004

Dwelling

Moanroe Minane Bridge

53m
05/7915CONDITIONAL27 Oct 2005

Dormer dwelling

Moanroe Minane Bridge

77m
09/5078CONDITIONAL6 Apr 2009

Demolition of agricultural shed and construction of a storey-and-a-half dwelling, domestic garage, wastewater treatment system, new entrance and associated site works

Moanroe Minane Bridge

82m
14/6098REFUSED30 Sept 2014

Retention of lean-to cattle shed with an underground slurry storage tank at the side of the original farmyard shed & all associated site works

Moanroe Minane Bridge Co.Cork

82m
17/4052REFUSED16 Jan 2017

Retention of (i) lean-to cattle shed with an underground slurry storage tank and (ii) a straw-bedded creep area, all attached to existing fodder and machinery shed and (iii) all associated site works

Moanroe Minane Bridge Co.Cork

82m
16/6054REFUSED17 Aug 2016

Retention of (i) lean-to cattle shed with an underground slurry storage tank and (ii) a straw-bedded creep area, all attached to existing fodder and machinery shed and (ii) all associated site works

Moanroe Minane Bridge Co. Cork

111m
03/6222WITHDRAWN5 Dec 2003

Deposition of excavated material on farmland

Moanroe & Fountainstown

126m
06/7402REFUSED23 May 2006

Reclamation of land by depositing 90,000 tonnes of recovered subsoil and topsoil

Moanroe Fountainstown

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?