Planning Permission Fees in Ireland
Complete fee schedule for planning applications in Ireland, including application fees, retention costs, submission fees, appeal fees, and exemptions.
Planning fees in Ireland are set by the Planning and Development Regulations 2001 (as amended) and are the same across all 31 local authorities. This guide covers application fees, submission fees, appeal costs, and exemptions.
Application Fees (to the Local Authority)
Fees depend on the type of development:
| Development Type | Fee |
|---|---|
| New house | €65 per house |
| Extension to house | €34 |
| Retention of house | €65 x 3 = €195 |
| Retention of extension | €34 x 3 = €102 |
| Apartments (per unit) | €65 |
| Commercial/retail (per sq m of gross floor space) | €3.60 |
| Industrial (per sq m) | €3.60 |
| Change of use | €500 |
| Outline permission (house) | €65 |
| Outline permission (other) | Half the full fee |
| Advertising structures | €50 per structure |
Retention fees are generally 3 times the standard fee — reflecting the fact that the development was carried out without planning permission.
Other Fees
| Item | Fee |
|---|---|
| Making a submission/observation on an application | €20 |
| Section 5 Declaration (is it exempted development?) | €80 |
| Section 57 Declaration (protected structures) | **Free** |
| Extension of duration of permission | Varies by authority |
| Compliance with conditions certificate | Varies by authority |
An Coimisiun Pleanala (Appeal Fees)
Appeals to An Coimisiun Pleanala are governed by Section 37 of the Planning and Development Act 2000.
| Appeal Type | Fee |
|---|---|
| First party appeal (applicant) | €220 |
| Third party appeal (objector) | €220 |
| Observation on an appeal | €50 |
| Strategic Infrastructure Development | €400+ |
Calculating Commercial Fees
For commercial and industrial developments, the fee is €3.60 per square metre of gross floor space. For example:
- A 200 sq m retail unit: 200 x €3.60 = €720
- A 1,000 sq m office building: 1,000 x €3.60 = €3,600
- Retention of the same: multiply by 3
For large developments, fees can be substantial. Calculate carefully before applying.
Important Notes
- Fees must be paid at the time of application — the application will not be accepted without the correct fee
- If your fee is incorrect, the application will be declared invalid and returned
- The government reviews fee levels periodically — verify the current schedule with your local authority
- For developments requiring both planning permission and a fire safety certificate, these are separate fees to separate bodies
Fee Exemptions
Some developments are exempt from planning application fees:
- Applications by or on behalf of a local authority
- Certain disability-related modifications to a dwelling
- Applications required by condition of a previous permission (in some cases)
- Community and voluntary organisations may qualify for reduced fees in some circumstances
Related Guides
- How to Apply for Planning Permission — full application process
- How to Object to a Planning Application — making submissions (€20)
- Planning Appeals — appealing to An Coimisiun Pleanala (€220)
Disclaimer
This guide provides general information about planning fees in Ireland. Fees are subject to change by regulation. Always confirm the current fee with your local authority before submitting an application.
Frequently asked questions
How much is planning permission for a house in Ireland?
The statutory application fee for a new house is €65, set nationally by Schedule 9 of the Planning and Development Regulations 2001. Professional fees for drawings and managing the application add €1,500 to €5,000 for most self-builds.
How much is the planning fee for an extension?
The application fee for a domestic extension, garage, or other works to a house is €34. Outline permission costs 75% of the full fee.
How much does retention planning permission cost?
Retention permission costs three times the standard fee, so €195 for a house and €102 for a domestic extension. The higher fee reflects that the development was carried out without permission.