The Irish Planning Register, Indexed

Search planning permission across all of Ireland.

Every planning application from all 31 local authorities, in one searchable register. Track decisions, watch your area, and get alerts the moment something is lodged near you.

applications on record
500,000+
applications on record
local authorities
31
local authorities
register updates
Weekly
register updates

01 — What you get

Everything you need to track planning applications in Ireland

01

Search all 31 authorities

Unified search across every local authority in Ireland. Find applications by address, eircode, or reference number.

02

Instant Telegram alerts

Get notified the moment new planning applications are filed near you. Set up alerts by area or eircode.

03

Interactive map

See planning applications plotted on a map. Zoom into your area to see what's being built around you.

04

Track applications

Follow specific applications and get status updates when decisions are made or appeals are lodged.

05

Exemption checker

Find out if your project needs planning permission. Check current exemption thresholds and development classes.

06

Expert guides

Step-by-step guides for the full planning process, from checking if you need permission to making an appeal.

02 — How it works

Stay informed in three steps

Search

Enter an address, eircode, or planning reference number to find applications in any of Ireland's 31 local authorities.

Subscribe

Set up alerts for the areas you care about. Choose an area by eircode, county, or draw a custom zone on the map.

Get Alerts

Receive instant Telegram notifications when new planning applications are filed or decisions are made in your areas.

04 — Pricing

Simple, transparent pricing

Start free. Upgrade when you need alerts and advanced features.

Free

Browse and search planning applications

Free
  • Search all 26 counties
  • View application details
  • 5 searches per day

Starter

Perfect for homeowners and individuals

19€9/mo
  • Unlimited searches
  • Telegram alerts for 1 area
  • Track up to 10 applications
  • Weekly email digest
Most Popular

Pro

For architects, planners, and property professionals

49€29/mo
  • Unlimited searches
  • Telegram alerts for 5 areas
  • Track unlimited applications
  • Daily email digest
  • Map view & exports
  • API access

Business

For agencies and enterprise teams

149€99/mo
  • Everything in Pro
  • Telegram alerts for unlimited areas
  • Priority data updates
  • Team access (5 seats)
  • Custom integrations
  • Dedicated support

05 — FAQ

Frequently asked questions

  • We aggregate planning application data from all 31 local authorities in Ireland via public data sources including the national planning application database. Our data is sourced from publicly available records and updated regularly.
  • We sync data from the national planning database multiple times per day. New applications typically appear on our site within 24 hours of being registered with the local authority.
  • Once you subscribe to a paid plan, you can connect your Telegram account and set up alerts for specific areas. When a new planning application is filed in your chosen area, you'll receive an instant Telegram message with the key details and a link to the full application.
  • No. Permission.ie is an independent service that aggregates publicly available planning data. We are not affiliated with any local authority, the Department of Housing, or An Coimisiun Pleanala. For official records, always refer to your local authority's planning portal.
  • No. Submissions and observations on planning applications must be made directly to the relevant local authority, usually within 5 weeks of the application being validated. We provide links to the council's planning portal on each application page so you can make your submission there.
  • You can set up alerts by eircode prefix (e.g., D08 for Dublin 8), by county, or by drawing a custom area on the map. The number of alert areas depends on your subscription plan.
  • No, a rear extension up to 40 square metres is generally exempt from planning permission in Ireland. The extension must be at ground floor level, behind the rear building line, and must not reduce private open space below 25 square metres. Above-ground extensions are limited to 20 square metres for detached houses and 12 square metres for semi-detached or terraced houses. Extensions to the front or side, extensions on protected structures, and any extension exceeding these limits require planning permission. Apply for a Section 5 Declaration (80 euro) from your local authority for a definitive answer.
  • Planning permission in Ireland costs 65 euro for a new house and 34 euro for a house extension. Commercial developments cost 3.60 euro per square metre of gross floor space. Retention permission (for work done without permission) costs three times the standard fee. Other costs include 20 euro for a submission on someone else's application, 80 euro for a Section 5 Declaration, and 220 euro to appeal to An Coimisiun Pleanala. Fees are set nationally and are the same across all 31 local authorities.
  • Planning permission in Ireland takes 8 weeks from the date the local authority validates your application. The process includes a 5-week public consultation period for submissions and observations. If the council requests further information, the 8-week clock stops until you respond (you have up to 6 months). After the decision, there is a 4-week appeal period before the grant becomes final. If appealed, An Coimisiun Pleanala aims to decide within 18 weeks. A straightforward application with no issues typically takes 12 weeks from submission to final grant.