How to Apply for Planning Permission in Westmeath
Planning applications in Westmeath are decided by Westmeath County Council. This guide covers what it costs, how long it takes, and how to apply — we track 6,273 planning applications in Westmeath so you can see what gets approved.
Looking for Westmeath ePlanning? Search and track Westmeath County Council applications on eplanning.ie, or use our Westmeath planning search, which needs no council search form.
Westmeath planning statistics 2026: Westmeath County Council has received 612 planning applications so far in 2026, and 84% of the 292 decided to date were granted. Source: Irish planning statistics, compiled daily from the public register.
First: you may not need planning permission
Rear extensions under 45 sq m, most sheds and garages, and rooftop solar panels are usually exempted development — Westmeath's local authority logged 28 exempted development notifications in 2018-2022. Two minutes with our free checker could save you months and thousands of euro.
Check if your project is exemptHow to apply for planning permission in Westmeath
- 1
Check if you need permission at all
Many small projects - rear extensions under 45 sq m, sheds, rooftop solar - are exempted development and need no application. Check before you spend anything.
- 2
Request a pre-planning consultation
Westmeath County Council offers free pre-planning meetings. They flag issues with your site or design before you commit to drawings.
- 3
Prepare drawings and documents
You will need site location maps, layout plans, elevations, and sections - almost always prepared by an architect, engineer, or architectural technician.
- 4
Publish notices
Place a notice in an approved local newspaper and erect a site notice. The application must be lodged within 2 weeks of the newspaper notice.
- 5
Submit and wait for a decision
Lodge the application with the fee. The council checks validity, the public has 5 weeks to comment, and a decision is due within 8 weeks.
Full details in our step-by-step application guide and pre-submission checklist.
Where to apply in Westmeath
Westmeath County Council
Recent planning applications in Westmeath
latest lodged 2 Nov 2026The most recent applications received by Westmeath County Council, from the public planning register. Seeing what your neighbours are applying for, and what gets granted, is the quickest way to judge your own chances.
- 2 Nov 20262660590
Construction of three canopy structures over existing parking spaces to support 525 PV panels, and all ancillary site development works
Longford and Westmeath Education and Training Board Garrycastle Campus , Garrycastle , Athlone Co. Westmeath
- 30 Oct 20262660587
Demolition of an existing single storey extension and sheds to the south and east of the existing derelict house, construction of a two-storey extension to the south of the existing derelict house, renovation works to the existing derelict house, construction of a detached garage and plant room and all associated ancillary site works. The proposed development adjoins the curtilage of a protected structure RPS 038-002 NIAH No 15321002
Bridge Street , Kilbeggan , Co. Westmeath
- 30 Oct 20262660588
Planning retention permission to retain and complete the construction of a 21.16m2 Pergola, for a separate 31.23m2 Games room/open lounge, for soft/hard landscaping works including the provision of a 1800mm high cedar screen 900mm inside the north east blockwork boundary wall and all necessary ancillary siteworks
Kilgarvin Lodge , New Two-Mile Round , Clonbrusk Athlone Co.Westmeath.
- 30 Oct 20262660589
development which will consist of construction of a new two storey dormer dwelling with garage, septic tank/treatment system, percolation area and all associated site works
Cullionmore , Mullingar , Co. Westmeath
- 29 Oct 20262660586
For retention permission of the following. Permission is sought to retain the domestic open storage area consisting of 46 Sqm located at the rear of previously granted planning permission domestic shed. Permission is also sought to retain the revised roof design with associated columns over the open outdoor space located at the front façade together with permission to retain the first floor attic storage area consisting of 40 Sqm and associated four side roof lights together with all associated site works.
Mooretown , Delvin , Co. Westmeath.
- 29 Oct 20262624
The erection of a detached log cabin style small dwelling (circa 75sqm) for family usage within our overall family plot. The proposed log cabin will include a connection to its own dedicated foul/wastewater treatment system and will include all oher associated site works. Vehicular entrance will be via the existing site entrance from the public road.
Ballydoogan , Moate , Westmeath
- 28 Oct 20262660582
Outline planning permission to construct a dwelling house with a max ridge height of 8m, a domestic garage and single dwelling treatment system with percolation area and associated site works
Carn Park , Mount Temple , Moate
- 28 Oct 20262660583
to construct a dwelling house & garage with proprietary treatment system and soil polishing filter and all associated site works
Hillquarter , Coosan , Athlone
Browse all 6,273 planning applications in Westmeath, including this week's lodgements, decisions and appeals.
Planning permission fees in Westmeath
Application fees are set nationally, so Westmeath charges the same as every other county:
| Application type | Fee |
|---|---|
| New house | €65 |
| Domestic extension or garage | €34 |
| Outline permission | 75% of the full fee |
| Retention permission | 3× the standard fee (€195 for a house) |
| Appeal to An Coimisiún Pleanála | €220 |
Professional fees for drawings and managing the application are the real cost — see the fees guide or estimate yours with the fee calculator.
Frequently asked questions
How much does planning permission cost in Westmeath?
The statutory application fee is the same across Ireland: 65 euro for a new house and 34 euro for a domestic extension or garage. Retention permission costs three times the standard fee. On top of that, most applicants pay a professional (architect, engineer, or planning consultant) for drawings and the application itself - typically 1,500 to 5,000 euro depending on the project.
How long does planning permission take in Westmeath?
Westmeath County Council must decide within 8 weeks of receiving a valid application. There is a 5-week period for public observations, and a 4-week appeal window after the decision. A request for further information restarts the clock, so 3 to 6 months end to end is common.
Do I need planning permission for an extension in Westmeath?
Not always. Rear extensions up to 45 square metres are generally exempt from planning permission, subject to conditions on height, remaining garden space, and previous extensions. The same national exemption rules apply in Westmeath as everywhere in Ireland.
How long does planning permission last in Westmeath?
A grant of planning permission normally lasts 5 years from the date of the decision. If you have not substantially completed the work in that time you must apply again or seek an extension of duration.
Where do I submit a planning application in Westmeath?
Applications go to Westmeath County Council, online through eplanning.ie or on paper at the council offices. You must also publish a newspaper notice and erect a site notice before applying.
Related guides
Planning permission in neighbouring counties
The fees, timelines and exemptions are set nationally, so the process in Westmeath is the same as next door. What changes is the council, its development plan, and how often it grants.
Get help with your Westmeath application
A local architect or planning consultant who knows Westmeath County Council can prepare drawings, handle notices, and manage the application for you.