How to Apply for Planning Permission in Roscommon
Planning applications in Roscommon are decided by Roscommon County Council. This guide covers what it costs, how long it takes, and how to apply — we track 6,511 planning applications in Roscommon so you can see what gets approved.
Looking for Roscommon ePlanning? Search and track Roscommon County Council applications on eplanning.ie, or use our Roscommon planning search, which needs no council search form.
Roscommon planning statistics 2026: Roscommon County Council has received 597 planning applications so far in 2026, and 88% of the 234 decided to date were granted. Source: Irish planning statistics, compiled daily from the public register.
First: you may not need planning permission
Rear extensions under 45 sq m, most sheds and garages, and rooftop solar panels are usually exempted development — Roscommon's local authority logged 13 exempted development notifications in 2018-2022. Two minutes with our free checker could save you months and thousands of euro.
Check if your project is exemptHow to apply for planning permission in Roscommon
- 1
Check if you need permission at all
Many small projects - rear extensions under 45 sq m, sheds, rooftop solar - are exempted development and need no application. Check before you spend anything.
- 2
Request a pre-planning consultation
Roscommon County Council offers free pre-planning meetings. They flag issues with your site or design before you commit to drawings.
- 3
Prepare drawings and documents
You will need site location maps, layout plans, elevations, and sections - almost always prepared by an architect, engineer, or architectural technician.
- 4
Publish notices
Place a notice in an approved local newspaper and erect a site notice. The application must be lodged within 2 weeks of the newspaper notice.
- 5
Submit and wait for a decision
Lodge the application with the fee. The council checks validity, the public has 5 weeks to comment, and a decision is due within 8 weeks.
Full details in our step-by-step application guide and pre-submission checklist.
Where to apply in Roscommon
Roscommon County Council
Recent planning applications in Roscommon
latest lodged 30 Oct 2026The most recent applications received by Roscommon County Council, from the public planning register. Seeing what your neighbours are applying for, and what gets granted, is the quickest way to judge your own chances.
- 30 Oct 20262678
Permission to construct Horse stables on his lands at
Cuilleen , Creagh , Ballinasloe
- 30 Oct 20262660570
Permission for the following1.To demolish portion of the existing house and shed,2.To refurbish derelict house to include alterations to elevations and construct new extension to same, 3.To remove the existing unauthorised septic tank and percolation area and install new wastewater treatment system and percolation area,4.To form a new site entrance with winged walls,5.To retain the existing mobile home,and carry out all ancillary site development works at
Lisagallan , Cloverhill , Co. Roscommon
- 29 Oct 20262660567
The Planning Application is subject to Section 34D of the Planning and Development Act 2000 (as amended) and in accordance with Article 16(2) of the Renewable Energy Directive III (Directive 2023/2413) i.e. Completeness Check. Permission for development, which consists of an amendment to the previously consented development (Ref. 2360142 & ACP. PL20.319800): • The construction of one Enercon E138 Wind Energy Converter on a 99.79m tower with an electrical rating of 4.5MW and an overall tip height of 168.9m; • An amendment to substation design, changing from a block-built to a modular design comprising of 2 single-storey prefabricated modules surrounded by stock proof fencing; an ESB module measuring 14.33 m² and height of 3.41m and an IPP module measuring 33.31 m² and 3.89m in height; • An amendment to the statutory redline boundary to incorporate the following; • 20kV overhead line (OHL) and underground cable (UGC) between the permitted IPP substation and the point of connection to the national grid, comprising c.507m of OHL across private lands and c.985m of UGC within the L7135 and • All associated ancillary infrastructure and preparatory works such as the provision of the turbine delivery / haulage route, site access track and the provision of the new site entrance from the L7086. The operational lifespan of the development will be 35 years from the date of commercial operation. This planning application is subject to a Natura Impact Statement (NIS). This development is covered by the provision of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application is subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. This applicaiton is for a 10-year planning permission for a development with a total site area of 12.33 hectares, located in the townlands of
Lissanisky Kilcash Moydow Moneymore Knockmeane and Skrine , County Roscommon.
- 29 Oct 20262660568
Permission for the construction of a single storey extension to the side of an existing single storey private dwelling to include all internal and external alterations to the dwelling; for the demolition of an existing ancillary shed and construction of a new ancillary shed within the property; and for all associated site development works at
Woodview , Barrymore Kiltoom , Co. Roscommon
- 29 Oct 20262660569
Retention permission for a hard surfaced area/car park, vehicular access/egress, mini ESB building and general storage building at
Bellaugh , Athlone , Co.Roscommon.
- 27 Oct 20262660564
Permission for the construction of a dwelling house, on site wastewater treatment system, access onto the public road and associated site development works at
Greagh Td , Arigna , Co. Roscommon.
- 23 Oct 20262676
Permission to construct a five bay double slatted cattle shed at
Newtowncarrigans , Donamon , Co. Roscommon.
- 23 Oct 20262677
Retention Permission to retain existing dwelling & domestic garage as constructed on site which differs to that granted planning permission under PD/17/400 associated site development works & services at
Farbreagues , Knockcroghery , Co. Roscommon.
Browse all 6,511 planning applications in Roscommon, including this week's lodgements, decisions and appeals.
Planning permission fees in Roscommon
Application fees are set nationally, so Roscommon charges the same as every other county:
| Application type | Fee |
|---|---|
| New house | €65 |
| Domestic extension or garage | €34 |
| Outline permission | 75% of the full fee |
| Retention permission | 3× the standard fee (€195 for a house) |
| Appeal to An Coimisiún Pleanála | €220 |
Professional fees for drawings and managing the application are the real cost — see the fees guide or estimate yours with the fee calculator.
Frequently asked questions
How much does planning permission cost in Roscommon?
The statutory application fee is the same across Ireland: 65 euro for a new house and 34 euro for a domestic extension or garage. Retention permission costs three times the standard fee. On top of that, most applicants pay a professional (architect, engineer, or planning consultant) for drawings and the application itself - typically 1,500 to 5,000 euro depending on the project.
How long does planning permission take in Roscommon?
Roscommon County Council must decide within 8 weeks of receiving a valid application. There is a 5-week period for public observations, and a 4-week appeal window after the decision. A request for further information restarts the clock, so 3 to 6 months end to end is common.
Do I need planning permission for an extension in Roscommon?
Not always. Rear extensions up to 45 square metres are generally exempt from planning permission, subject to conditions on height, remaining garden space, and previous extensions. The same national exemption rules apply in Roscommon as everywhere in Ireland.
How long does planning permission last in Roscommon?
A grant of planning permission normally lasts 5 years from the date of the decision. If you have not substantially completed the work in that time you must apply again or seek an extension of duration.
Where do I submit a planning application in Roscommon?
Applications go to Roscommon County Council, online through eplanning.ie or on paper at the council offices. You must also publish a newspaper notice and erect a site notice before applying.
Related guides
Planning permission in neighbouring counties
The fees, timelines and exemptions are set nationally, so the process in Roscommon is the same as next door. What changes is the council, its development plan, and how often it grants.
Get help with your Roscommon application
A local architect or planning consultant who knows Roscommon County Council can prepare drawings, handle notices, and manage the application for you.
Need help with your application?
Tell us about your project and we'll connect you with an architect or planning consultant in your county. Free, no obligation.