How to Apply for Planning Permission in Clare
Planning applications in Clare are decided by Clare County Council. This guide covers what it costs, how long it takes, and how to apply — we track 11,198 planning applications in Clare so you can see what gets approved.
Looking for Clare ePlanning? Search and track Clare County Council applications on eplanning.ie, or use our Clare planning search, which needs no council search form.
Clare planning statistics 2026: Clare County Council has received 1,002 planning applications so far in 2026, and 94% of the 601 decided to date were granted. Source: Irish planning statistics, compiled daily from the public register.
First: you may not need planning permission
Rear extensions under 45 sq m, most sheds and garages, and rooftop solar panels are usually exempted development — Clare's local authority logged 21 exempted development notifications in 2018-2022. Two minutes with our free checker could save you months and thousands of euro.
Check if your project is exemptHow to apply for planning permission in Clare
- 1
Check if you need permission at all
Many small projects - rear extensions under 45 sq m, sheds, rooftop solar - are exempted development and need no application. Check before you spend anything.
- 2
Request a pre-planning consultation
Clare County Council offers free pre-planning meetings. They flag issues with your site or design before you commit to drawings.
- 3
Prepare drawings and documents
You will need site location maps, layout plans, elevations, and sections - almost always prepared by an architect, engineer, or architectural technician.
- 4
Publish notices
Place a notice in an approved local newspaper and erect a site notice. The application must be lodged within 2 weeks of the newspaper notice.
- 5
Submit and wait for a decision
Lodge the application with the fee. The council checks validity, the public has 5 weeks to comment, and a decision is due within 8 weeks.
Full details in our step-by-step application guide and pre-submission checklist.
Where to apply in Clare
Recent planning applications in Clare
latest lodged 30 Oct 2026The most recent applications received by Clare County Council, from the public planning register. Seeing what your neighbours are applying for, and what gets granted, is the quickest way to judge your own chances.
- 30 Oct 202626294
permission for a new first-floor external balcony with stairs to ground level and for the change of use from residential to short term let for the 72m2 first floor of the outbuilding and retention for change of use from residential to short term let for the 72m2 ground floor of the outbuilding to the rear of The Glen School
The Glen School , Lackareagh Beg , Killaloe
- 30 Oct 202626295
to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
Ahasla , Maurices Mills , Ennistymon
- 30 Oct 202626296
to RETAIN as constructed domestic garage in revised location and revised rear boundary all as a variation to previously granted permission P24-245, plus all ancillary site works at the above address
Kilrush Road , Kildysart , Co. Clare
- 30 Oct 20262660706
for change of house style previously granted under Planning Ref. 2460399
Site 5 Holland Street , Liscannor Townland , Liscannor
- 30 Oct 20262660707
for (a) RETENTION permission for the demolition and reconstruction of the existing cottage and extension as constructed to date, including elevational changes permitted under Planning Reg. Ref. 23/60274; and (b) PERMISSION to continue and complete the development together with all associated ancillary site works
Derrynalicka , Kilmurry McMahon , Co. Clare
- 30 Oct 20262660708
for a 10-year permission for development of a windfarm at this site of ca. 138ha located entirely within the townlands of Liscasey and Dehomad, County Clare. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details from Clare County Council pursuant to Section 32I of the Planning and Development Act 2000 (as amended) accompanies this planning application. The details unconfirmed in this application are the blade tip height, rotor diameter and hub height of the wind turbines. The range of parameters within which the windfarm will be developed are specified in this site notice and in the Design Flexibility Opinion accompanying the planning application. The Proposed Development for which permission is sought will consist of renewable energy development comprising: • Construction of 6 no. wind turbines, each with an overall blade tip height of between 179.2m and 180m, a rotor diameter of between 149.1m and 150m, and a hub height of between 104.7m and 105m. • Construction of associated turbine hardstands, laydown areas and turbine foundations. • Construction of approximately 6.14km of new internal site access tracks with associated drainage infrastructure (including the upgrade of approximately 0.49km of existing forestry tracks) and on-site passing bays. • Construction of 1 no. new permanent site entrance from the N68, providing access to the proposed development site, inclusive of temporary works to facilitate the delivery of abnormal loads and turbine components. • The demolition of a single storey agricultural shed measuring ca. 41.3sqm, to facilitate the construction of a new on-site 38kV electrical substation; • Construction of a permanent on-site 38kV electrical substation within a compound measuring ca. 1,327 sqm, a substation building of ca. 161.7 sqm containing an MV Switchgear room, IPP control room, ESB control room, storeroom, office; a wind LiDAR system, 2 no. lightning masts, security fencing and gates, internal access, parking, underground cabling, and all ancillary structures and works. • Construction of a Battery Energy Storage System (BESS) compound measuring ca. 1,828 sqm, comprising 20 no. BESS units, each containing one smart skid and four battery pods (each unit approximately 7.4m long, 2.7m wide and 4.1m high), 5 no. Medium Voltage Station (MVS) units (each approximately 8.3m long, 2.1 m wide and 3.0m high), associated plant and equipment, security fencing and gate
Townlands of Liscasey and Dehomad , Co. Clare
- 30 Oct 2026268012
to carry out the following development, the construction of an accessible home consisting of: (i) Demolition of existing side and rear extensions. (ii) Construction of new side and rear extensions, and refurbishment of existing bungalow. (iii) Provision of new boundary wall, driveway, amenity space and new garden shed. (iv) Required site services with utilities connections to existing public sewer, watermain and all associated ancillary site development and enabling works. In accordance with the Habitats Directive and the provisions of Article 250 of the Planning and Development Regulations 2001 (as amended), Appropriate Assessment Screening of the proposed development has been carried out to assess, in view of best scientific knowledge, if the development, individually or in combination with other plans or projects, would be likely to have a significant effect on a European site. It has been determined that an Appropriate Assessment is not required in respect of this proposed development. An Environmental Impact Assessment (EIA) screening determination has been made. It has been determined that there is no real likelihood of significant effects on the environment arising from the proposed development and concluded that an Environmental impact Assessment is not required.
Gaurus , Cappagh Lawn , Ennis
- 30 Oct 2026268013
to carry out the following development, the construction of a group home and single unit consisting of: (i) Demolition of existing bungalow and garage unit. (ii) Construction of a new Group Home Bungalow and separate apartment unit. (iii) Provision of new driveway, parking areas, amenity space and new garden shed. (iv) Replacement treatment unit and polishing filter, connection to existing watermain and all associated ancillary site development and enabling works. In accordance with the Habitats Directive and the provisions of Article 250 of the Planning and Development Regulations 2001 (as amended), Appropriate Assessment Screening of the proposed development has been carried out to assess, in view of best scientific knowledge, if the development, individually or in combination with other plans or projects, would be likely to have a significant effect on a European site. It has been determined that an Appropriate Assessment is not required in respect of this proposed development. An Environmental Impact Assessment (EIA) screening determination has been made. It has been determined that there is no real likelihood of significant effects on the environment arising from the proposed development and concluded that an Environmental impact Assessment is not required
Ballykinnacorra North , Ennis Road , Corofin
Browse all 11,198 planning applications in Clare, including this week's lodgements, decisions and appeals.
Planning permission fees in Clare
Application fees are set nationally, so Clare charges the same as every other county:
| Application type | Fee |
|---|---|
| New house | €65 |
| Domestic extension or garage | €34 |
| Outline permission | 75% of the full fee |
| Retention permission | 3× the standard fee (€195 for a house) |
| Appeal to An Coimisiún Pleanála | €220 |
Professional fees for drawings and managing the application are the real cost — see the fees guide or estimate yours with the fee calculator.
Frequently asked questions
How much does planning permission cost in Clare?
The statutory application fee is the same across Ireland: 65 euro for a new house and 34 euro for a domestic extension or garage. Retention permission costs three times the standard fee. On top of that, most applicants pay a professional (architect, engineer, or planning consultant) for drawings and the application itself - typically 1,500 to 5,000 euro depending on the project.
How long does planning permission take in Clare?
Clare County Council must decide within 8 weeks of receiving a valid application. There is a 5-week period for public observations, and a 4-week appeal window after the decision. A request for further information restarts the clock, so 3 to 6 months end to end is common.
Do I need planning permission for an extension in Clare?
Not always. Rear extensions up to 45 square metres are generally exempt from planning permission, subject to conditions on height, remaining garden space, and previous extensions. The same national exemption rules apply in Clare as everywhere in Ireland.
How long does planning permission last in Clare?
A grant of planning permission normally lasts 5 years from the date of the decision. If you have not substantially completed the work in that time you must apply again or seek an extension of duration.
Where do I submit a planning application in Clare?
Applications go to Clare County Council, online through eplanning.ie or on paper at the council offices. You must also publish a newspaper notice and erect a site notice before applying.
Related guides
Planning permission in neighbouring counties
The fees, timelines and exemptions are set nationally, so the process in Clare is the same as next door. What changes is the council, its development plan, and how often it grants.
Get help with your Clare application
A local architect or planning consultant who knows Clare County Council can prepare drawings, handle notices, and manage the application for you.
Need help with your application?
Tell us about your project and we'll connect you with an architect or planning consultant in your county. Free, no obligation.