How to Apply for Planning Permission in Carlow
Planning applications in Carlow are decided by Carlow County Council. This guide covers what it costs, how long it takes, and how to apply — we track 4,677 planning applications in Carlow so you can see what gets approved.
Looking for Carlow ePlanning? Search and track Carlow County Council applications on eplanning.ie, or use our Carlow planning search, which needs no council search form.
Carlow planning statistics 2026: Carlow County Council has received 364 planning applications so far in 2026, and 91% of the 167 decided to date were granted. Source: Irish planning statistics, compiled daily from the public register.
First: you may not need planning permission
Rear extensions under 45 sq m, most sheds and garages, and rooftop solar panels are usually exempted development — Carlow's local authority logged 18 exempted development notifications in 2018-2022. Two minutes with our free checker could save you months and thousands of euro.
Check if your project is exemptHow to apply for planning permission in Carlow
- 1
Check if you need permission at all
Many small projects - rear extensions under 45 sq m, sheds, rooftop solar - are exempted development and need no application. Check before you spend anything.
- 2
Request a pre-planning consultation
Carlow County Council offers free pre-planning meetings. They flag issues with your site or design before you commit to drawings.
- 3
Prepare drawings and documents
You will need site location maps, layout plans, elevations, and sections - almost always prepared by an architect, engineer, or architectural technician.
- 4
Publish notices
Place a notice in an approved local newspaper and erect a site notice. The application must be lodged within 2 weeks of the newspaper notice.
- 5
Submit and wait for a decision
Lodge the application with the fee. The council checks validity, the public has 5 weeks to comment, and a decision is due within 8 weeks.
Full details in our step-by-step application guide and pre-submission checklist.
Where to apply in Carlow
Carlow County Council
Recent planning applications in Carlow
latest lodged 30 Oct 2026The most recent applications received by Carlow County Council, from the public planning register. Seeing what your neighbours are applying for, and what gets granted, is the quickest way to judge your own chances.
- 30 Oct 20262660341
demolish existing glass porch to front of existing dwelling and erection of a new front porch and all associated site works
Bahana , St Mullins , Carlow
- 30 Oct 20262660342
a two storey dwelling house, domestic garage, proprietary wastewater treatment system and sand polishing filter, new entrance and all necessary and associated site works
Craanlusky , Ballinabrannagh , Carlow
- 30 Oct 20262660343
The proposed development forms part of works to facilitate the permitted Bilboa Wind Farm (Planning Ref: CCC Ref: 22/340 / ABP PL01.318295). Permission was previously granted by Carlow County Council (Planning Ref: 20/180) and subsequently expired. The proposed development will consist of the following elements within the administrative boundary of Carlow County Council: • Installation of approximately 5.7km of underground electrical cabling (33kV) together with all associated infrastructure and ancillary works. • Upgrading of approximately 3.1km of an existing forestry track. • New and revised onsite access track between T1 and T3. • Minor reorientation of the approved turbine hardstands to improve site functionality and layout. • Omission of the on-site substation. • Site drainage and tree felling. • All associated ancillary works. A concurrent planning application is being made to Laois County Council for the following elements within the administrative boundary of Laois County Council: • Installation of approximately 1.7km of underground electrical cabling (33kV), together with all associated infrastructure and ancillary works. • 38kV Substation and associated compound including a single storey control building (5.2m height and 195sqm) and all associated electrical infrastructure and apparatus, including new and upgraded site entrance and access road and associated ancillary site development works. • Installation of approximately 390m of underground electrical cabling (38kV) from the proposed substation, creating a loop-in connection to the existing 38kV underground electricity network, together with all associated infrastructure and ancillary works. • Junction accommodation works along the turbine delivery route, including temporary overrun areas, and associated works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
within the townlands of CLOGRENAN BALLINABRANNAGH CRAANLUSKY , TOMARD LOWER TOMARD UPPER BOOLYRATHORNAN or TOMARD , BOOLYVANNANAN COOLNAKISHA CO. CARLOW
- 29 Oct 20262660337
the construction of a Two-Storey Dwelling, detached garage, septic tank & percolation area, a bored well, new entrance and all associated site development works
Rathcrogue , Carlow , Co. Carlow
- 29 Oct 20262660338
erect floodlights in existing sports grounds with all associated site works
Woodside , Hacketstown , Co. Carlow
- 29 Oct 20262660339
alterations to a previously granted development (Planning Ref. 2660081) for a light industrial building with office and training annexes. The alterations comprise: A. Moving the overall building approx. 5m to the southeast; B. Moving the front office annex approx. 12.5m to the southeast along the façade; C. The addition of internal office and associated spaces and vertical circulation to the rear annex mezzanine; D. The addition of windows to the new first-floor office and adjoining spaces at C; E. The construction of a new standalone electricity substation building, approx. 23.5m2 with all associated underground ducting, cable routes and connection to the public grid; F. Revisions to the hard and soft landscaping, and parking and circulation layouts associated with the changes; G. Further detail on and revisions to the proposed signage; H. All associated works to facilitate the development
Bagenalstown Industrial Park , Royal Oak Road , Muine Bheag
- 29 Oct 20262660340
for private dwelling, wastewater treatment system, private well, site entrance and all associated site works
Raheendaw , Rathvilly , Co. Carlow
- 27 Oct 20262660336
the construction of a new building to be used as a kitchen manufacturing facility and will include, a new entrance, associated parking, new signage, connection to services, a secondary treatment system and soil polishing filter, And all associated site works
Tinryland , Co. Carlow
Browse all 4,677 planning applications in Carlow, including this week's lodgements, decisions and appeals.
Planning permission fees in Carlow
Application fees are set nationally, so Carlow charges the same as every other county:
| Application type | Fee |
|---|---|
| New house | €65 |
| Domestic extension or garage | €34 |
| Outline permission | 75% of the full fee |
| Retention permission | 3× the standard fee (€195 for a house) |
| Appeal to An Coimisiún Pleanála | €220 |
Professional fees for drawings and managing the application are the real cost — see the fees guide or estimate yours with the fee calculator.
Frequently asked questions
How much does planning permission cost in Carlow?
The statutory application fee is the same across Ireland: 65 euro for a new house and 34 euro for a domestic extension or garage. Retention permission costs three times the standard fee. On top of that, most applicants pay a professional (architect, engineer, or planning consultant) for drawings and the application itself - typically 1,500 to 5,000 euro depending on the project.
How long does planning permission take in Carlow?
Carlow County Council must decide within 8 weeks of receiving a valid application. There is a 5-week period for public observations, and a 4-week appeal window after the decision. A request for further information restarts the clock, so 3 to 6 months end to end is common.
Do I need planning permission for an extension in Carlow?
Not always. Rear extensions up to 45 square metres are generally exempt from planning permission, subject to conditions on height, remaining garden space, and previous extensions. The same national exemption rules apply in Carlow as everywhere in Ireland.
How long does planning permission last in Carlow?
A grant of planning permission normally lasts 5 years from the date of the decision. If you have not substantially completed the work in that time you must apply again or seek an extension of duration.
Where do I submit a planning application in Carlow?
Applications go to Carlow County Council, online through eplanning.ie or on paper at the council offices. You must also publish a newspaper notice and erect a site notice before applying.
Related guides
Planning permission in neighbouring counties
The fees, timelines and exemptions are set nationally, so the process in Carlow is the same as next door. What changes is the council, its development plan, and how often it grants.
Get help with your Carlow application
A local architect or planning consultant who knows Carlow County Council can prepare drawings, handle notices, and manage the application for you.