05/5629
INCOMPLETED APPLICATIONCork - Cork County Council
Proposed Development
Construction of 51 no. dwellinghouses and installation of Euro-Bio 200 treatment unit and ancillary works
View the full application file on the council's planning portal →Application Details
- Location
- Flats Ballymakeera
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 5 August 2005
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
47 no. dwellinghouses incorporating Euro-bio treatment system, road works and landscaping
Flats Ballymakeera
Creche facility incorporating parking, secure recreational area, solar panels and biomass boiler house
Flats Ballymakeera
To construct 21 number dwelling-houses, consisting of 12 number 3 bedroom townhouses, 9 number 2 bed townhouses houses, (permission for 16 number dwellinghouses was previously granted under planning reference numbers 18/7381 and 18/5158) completion of public open space, extension to existing estate driveway and footpaths, extension of public lighting, foul and surface water sewers, connection to new attenuation system, new temporary construction entrance to the western side of the main estate entrance together with all other ancillary site works.
Cluain Reidh Housing Development Flats Ballymakeera Co. Cork
Construction of 2 no. apartments, 1 no. apartment on ground floor and 1 no. apartment on the first floor in lieu of dwellinghouse permitted under 18/5158 and all associated site works
No. 45 Cluain Reidh Housing Development Flats Ballyvourney, Co.Cork
To replace dwellinghouse number 45 with a ground floor and a first floor two-bedroom duplex separate apartments and to include all necessary site works.
No. 45 Cluain Reidh Housing Development Flats Ballyvourney, Co. Cork
Construction of creche facility incorporating parking, secure recreational area, solar panels and biomass boiler house
Flats Ballymakeera
To construct 25 No. dwellinghouses (16 previously permitted under planning reference number 05/6890), consisting of 16 No. 4 bedroom semi detached houses, 8 No 3 bedroom semi detached houses, 1 No. 4 bedroom detached, public open space, extension to existing estate driveway and footpaths, extension of public lighting, foul and surface water sewers, attenuation system together with permission for 2 No. temporary construction entrances separate to the existing main entrance.
Cluain Reidh Housing Development Flats Ballymakeera Co. Cork
Retention and completion of (a) garden store and (b) conversion of attic to 2 no. bedrooms and retention of changes to windows on north west elevation of dwellinghouse
No.13 Cluain Reidh Flats Ballymakeera Ballyvourney
Is éard atá i gceist san fhorbairt ná; 1.24 Aonaid Chónaithe a thógáil ina n-áirítear: a.8 dteach leathscoite le 3 sheomra codlata b.16 theach leathscoite le 4 sheomra codlata 2. Slí isteach d’fheithiclí agus coisithe a sholáthar, chomh maith le colbha íseal ar bhóthar Chluain Réidh. 3. Oibreacha draenála bréanuisce agus uisce dromchla agus gach a bhaineann leo a sholáthar, réitigh draenála inbhuanaithe agus na hoibreacha láithreáin agus na seirbhísí coimhdeacha go léir a sholáthar. 4. Soláthar spáis oscailte chomhroinnte, spás oscailte priobháideach, an suíomh a thírdhreachtú agus cóireáil teorann, soilsiú poiblí, páirceáil do chónaitheoirí agus cuairteoirí, páirceáil rothair, naisc choisithe, rothair agus feithiclí tríd na fobartha agus gach obair fobartha láithreáin ghaolmhar eile. The development will consist of the following: 1. The construction of 24 no. residential units comprising of: a. 8 no. 3-bed semi-detached houses b. 16 no. 4-bed semi-detached houses 2. Provision of a new vehicle and pedestrian entrance and drop kerb from the Cluain Réidh roadway. 3. Provision of all associated surface water and foul drainage services, sustainable drainage solutions (SuDS), and all associated site works and ancillary services. 4. Provision of communal open space, private open space, site landscaping and boundary treatments, public lighting, resident and visitor car parking, bicycle parking, pedestrian, cycle, and vehicular links throughout the development, and all other associated site development works.
Cluain Réidh Flats Ballymakeery Co. Cork
Residential development - Construct 18 number dwelling-houses, consisting of 6 number 3 bedroom detached houses 12 Number 4 bed semi-detached houses, public open space, extension to existing estate driveway and footpaths, extension of public lighting, foul and surface water sewers, connection to attenuation system which permission has been applied for under planning reference number 18/7008 together with all other site works.
Cluain Reidh Housing Development Flats Ballymakeera Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?