The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

06/9630

CONDITIONAL

Cork - Cork County Council

Proposed Development

Construction of loose cattle shed, milking parlour, soiled water tank, concrete apron, overground slurry storage tank and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Aug 2006

  2. Decision due

    5 Dec 2006

  3. Decision: CONDITIONAL

    5 Dec 2006

  4. Grant issued

    10 Jan 2007

Application Details

Location
Mishells Bandon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
10 August 2006
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 December 2006
Grant Date
10 January 2007

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

90m
16/5713CONDITIONAL11 Jul 2016

Construction of a new detached dwelling house, detached garage and the installation of a waste water treatment plant and all associated site works.

Mishells Bandon Co. Cork

136m
05/9772CONDITIONAL23 Dec 2005

Construction of extensions to dwelling

Mishells Bandon

137m
04/9481REFUSED21 Dec 2004

Dwellinghouse and installation of domestic waste water treatment unit

Mishells Bandon

146m
07/9590WITHDRAWN13 Jul 2007

Dwellinghouse

Mishells Bandon

200m
05/6099CONDITIONAL24 Aug 2005

Retention of conservatory and first floor extension to dwellinghouse

Mishells Bandon

246m
03/2548CONDITIONAL28 May 2003

Dwellinghouse with access roadway

MISHELLS, MISHELLS,

280m
25/6845Awaiting F.I. Response17 Dec 2025

The provision of a Battery Energy Storage System (BESS), compound and cable route on a site of c. 4.61ha. The BESS compound will accommodate self-contained Lithium Iron Phosphate batteries within 32 no. BESS units, 8 no. MV Switchgear units, and a 38kV substation including a control room of 126m2. A cable route of c. 2km is proposed to run south from the compound to the L2033 and east along the L2033 to the nearby Bandon 110kV Substation. The proposed development includes for all associated development, site levelling, boundary treatments, security fencing, site access works, ducting and cabling and all ancillary works.

Mishells, Bandon, Co. Cork

325m
07/9114CONDITIONAL28 Jun 2007

Construction of livestock housing with 2 no. slatted tanks and associated works

Mishells Bandon

343m
22/5234CONDITIONAL30 May 2022

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co Cork

366m
22/4890INCOMPLETED APPLICATION20 Apr 2022

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning Reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?