Construction of single storey softwood storage building for storage of softwood timber in stacks in a controlled environment, construction of new parking facility for 400 no. car parking spaces, 6 no. bus parking spaces, personnel access tunnel to existing plant with necessary drainage, hydrocarbon interceptors, footpaths, weather canopy's and lighting standards
View the full application file on the council's planning portal →Application Timeline
Application received
19 Dec 2008
Decision due
21 Feb 2009
Decision: CONDITIONAL
14 Dec 2009
Application Details
- Location
- Munster Joinery Lacka Cross Lackanastooka Ballydesmond
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 19 December 2008
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 December 2009
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of parking facility providing 400 no. car parking spaces, 6 no. bus parking spaces, personnel access tunnel to existing plant, drainage, hydrocarbon interceptors, footpaths, weather canopy's and lighting standards
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Construction of 285sqm new timber storage building to to store timber for further processing
Lacka Cross Lackanastooka Ballydesmond
Construction of parking facility providing 400 no. car parking spaces and 6 no. bus parking spaces, personnel access tunnel to existing plant, drainage, hydrocarbon interceptors, footpaths, weather carnopys and lighting standards
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
The relocation of an existing site entrance gate to provide improved sightlines and the removal off site of approximately 4,600m3 of material to level an existing land area to facilitate future works and all associated site & ancillary works.
Lacka Cross Lackanastooka Ballydesmond Co.Cork
The development will consist of a 0.28ha Fire Water Retention Pond. The pond will have a storage capacity of 4400m³. This project will form part of the works for the existing IPPC Licence governing the facility. A Natura Impact Statement has been submitted with the application.
Lacka Cross Lackanastooka Ballydesmond
A 0.28ha Fire Water Retention Pond. The pond will have a storage capacity of 4400 metres cubed.
Lacka Cross Lackanastooka Ballydesmond Co.Cork
A 0.28ha fire water retention pond and all ancillary site works. The pond will have a storage capacity of 4400metres cubed.
Lacka Cross Lackanastooka Ballydesmond
The construction of a 172-space car park facility, complete with a storm water attenuation tank, oil interceptor, access footpath, lamp posts and landscaping works (8763 sq.m total) at the Gairdini facility. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.
Lackanastooka Ballydesmond Co. Cork
Construction of single storey building to house equipment for treatment of water based waste paints for the purpose of reducing wastes exported from the site
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Construction of single storey building with bunding to house equipment for treatment of water based waste paints
Lacka Cross Lackanastooka Ballydesmond