08/5575
CONDITIONALCork - Cork County Council
Proposed Development
Construction of single storey catalyst technology development laboratory with 3 no. external single storey storage buildings, continuation of existing estate roadway, construction of 2 no. site entrances, surface car parking, underground surface water attenuation tank and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
20 Mar 2008
Decision: CONDITIONAL
3 Feb 2009
Decision due
5 Feb 2009
Grant issued
6 Mar 2009
Application Details
- Location
- Maigh Reidh Flats Ballyvourney
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 20 March 2008
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 February 2009
- Grant Date
- 6 March 2009
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Chun leathnu a dheanamh ar na boithre agus ar na seirbhisi ar eastait tionscail(extension of roads and services within the industrial estate).
Eastait Tionscail Udaras na Gaeltachta Flats Maigh Reidh Baile Bhuirne
Foirgneamh nua storala a thogail chomaith le oibrithe coimhdeach laithreain, ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Folláin Teo. (New storage building with associated site works at site adjacent to the new Folláin Teo Food Processing Factory).
Eastat Gno Baile Mhuirne/Ballyvourney Industrial An Maigh Reidh, Baile Mhuirne/Flats, Ballyvourney Co. Chorcai/Co. Cork
Foirgneamh Nua Storala a thogail chomaith le oibrithe coimhdeach Iaithreain, ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Folláin Teo. (New storage building with associated site works at site adjacent to the new Folláin Teo Food Processing Factory).
Eastat Gno Baile Mhuirne/Ballyvourney Industrial An Maigh Reidh, Baile Mhuirne/Flats, Ballyvourney Co. Chorcai/Co. Cork
Permission for a 201.04KW Solar Photovoltaic (PV) array to be mounted on the roof top of the existing building at Ballyvourney Industrial Estate. The Solar PV array will generate on site green electricity which will be used to help reduce the company’s energy costs.
Ballyvourney Industrial Estate, Flats Ballyvourney Co.Cork
A 201.04kw solar photovoltaic PV array to be mounted on the roof top of the existing food manufacturing building. The solar PV array will generate on site green electricity which will be used to help reduce the company’s energy costs
Ballyvourney Indutrial Estate, Flats Flats, Ballyvourney Co. Cork
A 201.04kw Solar Photovoltaic (PV) array to be mounted on the roof top of the existing food manufacturing building. The Solar PV array will generate on site green electricity which will be used to help reduce the company’s energy costs. The PV modules will cover 1199.06sq.m of the Folláin Teo food manufacturing roof.
Ballyvourney Industrial Estate Ballyvourney, Flats Co. Cork
1) Cead Pleanala a fhail le foirgneamh storala breise le framai cruach iarainn a thogail mar mheadu achair ar an bhFoirgneamh Storala ata togtha cheana fein (faoi Cead Pleanala 18/06386), chomaith le oibrithe coimdeach laithreain ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Follain Teo. 2) Cead Pleanala a fhail le paneil fotavoltach greine a chur ar dhionta an priomh Monarcha Phroiseas Bidh agus an Foirgneamh Storala. [1) Permission for construction of an additional steel framed storage building, thus extending the area of the existing storage building (granted under Planning Ref: No: 18/6386) as well as associated site works on the site close to the new Follain Teo food processing factory. 2) Permission to install a photovoltaic solar panel on the roof of the main food processing factory and the storage building].
Eastat Gno Baile Mhuirne/Ballyvourney Ind Estate An Maigh Reidh/Flats Baile Mhuirne/Ballyvourney Contae Chorcai/County Cork
Le framai cruach iarainn a thogail in aired ar an mba ualaigh ata suite laistiar den Monarcha Phroiseas Bidh le Follain Teo. (faoi Cead Pleanala 13/04748), chomaith le oibrithe coimhdeach laithreain. - To construct a steel framed enclosure over the existing loading bay area to the existing Folláin Teo food process facility (under Planning Permission 13/04748) inclusive of all ancillary site works.
Eastat Gno Baile Mhuirne An Maigh Reidh, Baile Mhuirne Ballyvourney Industrial Estate, Flats Ballyvourney, Co Cork
Construction of commercial/industrial unit incorporating offices, manufacturing area, showrooms and storage areas, provision for parking, landscaping and ancillary site works
Site No.14 Ballyvourney Ind. Estate Flats Ballyvourney
Cead Pleanála chun monarcha próiseas bidh a thógáil, ina mbeidh áiseanna ullmhúcháin bidh, proiseas and pacaistiocht, stór do earraí deanta, seomraí gaileadán agus innealra, oifigí. Gailearaí feachana agus siopa do chuairteoirí, bealach isteach agus amach do fheithiclí, áiseanna pairceáil agus cúrsaiochta, corais draenala searachais agus baistí, comharthaí agus oibreacha coimhdeach laithreain. Permission for construction of a food processing factory which will include food preparation facilities, processing and packaging, a store for finished products, boiler and machinery rooms, offices, a viewing gallery and shop for visitors, entrance and egress for vehicles, parking and circulation facilities, sewage and rainwater drainage systems, signs and all associated site works
Eastat Gno Baile Mhuirne, An Maigh Reidh Baile Mhuirne, Co.Chorcai Ballyvourney Industrial Estate, Flats Ballyvourney, Co.Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?