The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

09/5338

INCOMPLETED APPLICATION

Cork - Cork County Council

Proposed Development

Construction of 4no. dormer windows to front of roof of existing bungalow

View the full application file on the council's planning portal →

Application Details

Location
Flats Ballymakeera
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
29 April 2009
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
09/5695CONDITIONAL25 May 2009

Construction of 4 no. dormer windows to front roof and retention of alteration to front elevation to include part natural stone finish to existing bungalow

Flats Ballymakeera

39m
14/6162UNCONDITIONAL7 Oct 2014

Demolition of existing petrol station, shed, ancillary structures and 1no. habitable dwelling. Construction of a two-storey petrol station comprising of 2no. retail units on the ground floor & 1no. two-bed apartment, and 2no. one-bed apartments on the first floor. Construction of a sixty-two bed residential nursing home with ancillary facilities, all on the northern side of the public road, and on the southern side of the road, construction of a temporary waste water treatment plant with control house & associated site services/works to service the development, extension of duration to permission granted under Planning Ref. No. 09/6867

Flats Ballymakeera Co.Cork

39m
09/6499WITHDRAWN27 Jul 2009

Construction of temporary waste water treatment plant together with associated site works & services

Flats Ballymakeera

44m
17/5653CONDITIONAL30 Jun 2017

a)Demolition of existing dwelling & b)construction of 2 no. semi-detached dwellings together with associated entrances & site works.

No.2 Naomh Aban Terrace Flats, Ballymakeera Macroom Co.Cork

81m
22/4165CONDITIONAL28 Jan 2022

Cead pleanála iomlán a lorg chun síneadh dhá urlár a chur leis an scoil, ag cur san áireamh, staighre éalaithe, doras éalaithe, athraithe ingearchló, ag cur fuinneog san áit ina bhfuil an doras éalaithe faoi láthair thuas staighre, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suíomh - Full Planning Permission for a 2 storey extension to the school including emergency stairs and emergency exit, changes to elevations, insertion of window in place of existing emergency exit upstairs, as well as associated site works.

Scoil Abán Naofa Máigh Réidh Flats Baile Mhic Íre, Co. Chorcaí

81m
21/5249CONDITIONAL7 May 2021

Cead pleanála iomlán a lorg chun athchóiriú, méadú agus cur leis an bhfoirgneamh atá ann. San áireamh, beidh oifig nua aon úrláir á thógáil ar chúl na scoile, díonta claonta nua in áit díonta léibhéala, an simné á bhaint agus airde de bhuaic díon halla na scoile á árdú. Ina theannta beidh gá ingearchló na scoile a athrú, doras tosaigh nua don halla, cuid de falla teorainn a bhaint, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suiomh. (Full Planning Permission for alterations and extension to existing school building including construction of single storey office to rear of school, new sloping roofs to replace existing level roofs, removal of chimney and raising of the apex of the school hall roof. Works will also necessitate alterations to elevations, new front door for the hall, removal of part of partition wall, as well as all associated site works).

Scoil Abán Máigh Réidh/Flats Baile Mhic íre/Ballymakeera Co. Chorcaí/Co. Cork

86m
08/9616REFUSED7 Nov 2008

Demolition of existing petrol station, shed, ancillary structures & 1no. habitable dwelling, construction of new petrol station with a three-storey building comprising of 4no. retail units on the ground floor and 4no. two-bed apartments and storeroom on first floor, 1no. two-bed apartment & 2no. one-bed apartments on second floor to south of the site adjacent to the public road, and construction of a seventy-bed residential nursing home with ancillary facilities to the north (rear) of the site

Flats Ballymakeera Macroom

87m
09/6867CONDITIONAL31 Aug 2009

Demolition of existing petrol station, shed, ancillary structures and 1no. habitable dwelling. Construction of a two-storey petrol station comprising of 2no. retail units on the ground floor & 1no. two-bed apartment, and 2no. one-bed apartments on the first floor. Construction of a sixty-two bed residential nursing home with ancillary facilities, all on the northern side of the public road, and on the southern side of the road, construction of a temporary waste water treatment plant with control house & associated site services/works to service the development

Flats Ballymakeera

89m
20/4588Conditional Permission23 Mar 2020

(a) Construction of an eighty-five bed residential nursing home with ancillary facilities and associated site works to service the development. (b) Demolition of exiting petrol station, shed and ancillary structures. (c) New entrance/exit and car parking facilities.

The Flats Ballymakeera Co. Cork

89m
26/1911Awaiting Recommendation17 Jul 2026

Permission for Construction of an eighty-five bed residential nursing home with ancillary facilities and associated site works to service the development. (b) Demolition of exiting petrol station, shed and ancillary structures. (c) New entrance/exit and car parking facilities. Extension of Duration to permission granted under planning Ref. No. 20/4588.

The Flats, Ballymakeera, Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?