10/4954
INCOMPLETED APPLICATIONCork - Cork County Council
Proposed Development
Revision of planning granted under planning ref.no. 07/4170 to include change of size & location of digester tanks, modifications to the overground & underground tanks' locations & their sizes, modification to the fibre store size & location, modification to the size & location of the geomembrane lined manure storage basins, and construction of a reception building with plant rooms, weighbridge & associated site works to produce renewable energy & fertiliser
View the full application file on the council's planning portal →Application Details
- Location
- Derrynanool Mitchelstown
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 April 2010
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1no. primary, 1no. secondary digestor, 1no. pasteurisation tank, a reception building with plant rooms & tanks, 2no. geomembrane lined manure storage basins, a fibre store, a weighbridge, entrance & associated site works to produce renewable energy & fertiliser
Derrynanool Mitchelstown
Revision of the type and location of 2 no. mixing tanks, 4 no. overground storage tanks, a primary digester with gas purification system, integrated gas storage system on a secondary digester, entrance, machine shed, fibre store, 2 no. geomembrane lined manure storage basins and associated works to process pig manure and other organic material to produce renewable energy and fertilizer
Derrynanool Mitchelstown
Change of type and location of tanks, engineered storage basin and shed for previously permitted (03/1854) Biogas plant for processing of pig manure and other organic material to produce renewable energy and fertilizer
Derrynanool Mitchelstown
Shed,3 overground storage tanks,engineered storage basin & assoc. works incorporating a digestor to process pig manure & organic material
DERRYNANOOL, DERRYNANOOL,
Permission to install a 100% renewable energy ground mounted solar array consisting of 1390 no. solar PV panels (750kWp) and all associated site works.
Derrynanool, Mitchelstown, Co. Cork
Permission to install a 100% renewable energy ground mounted solar array consisting of 1261 no. solar PV panels (750kWp) and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.
Derrynanool, Mitchelstown, Co.Cork
Permission to install a 100% renewable energy ground mounted solar array consisting of 1261 no. Solar PV panels (750kWp) and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.
Derrynanool, Mitchelstown, Co.Cork
Construction of roof over existing loading ramp, operations room, a boot changing room, bio-security boundary wall and new staff car park with entrance.
Derrynanool Mitchelstown
Construction of a roof over the existing loading ramp, weighbridge and wheel wash operations room, a boot changing room, bio-security boundary wall and new staff car park with entrance
Derrynanool Mitchelstown
Construction of weighbridge and wheel wash facility with pump room, roof over the existing loading ramp, a boot changing room, bio security boundary wall, and new staff car park with entrance
Derrynanool Mitchelstown
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.