16/4846

INCOMPLETED APPLICATION

Cork - Cork County Council

Proposed Development

Construction of an industrial building and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Apr 2016

  2. Decision due

    13 Jun 2016

Application Details

Location
Knockgriffin Midleton Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
18 April 2016
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
13 June 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
16/5071CONDITIONAL5 May 2016

Construction of a structural steel fabrication workshop and all associated site works

Knockgriffin Midleton Co. Cork

58m
09/7270CONDITIONAL7 Oct 2009

Demolition of existing dwellinghouse and construction of: a materials recovery and transfer facility comprising of a steel framed building to be used for handling and sorting waste materials, bins recycling area for public use, secure compound, 2 no. buildings for office use, toilet and canteen, fencing and security lighting, class 1 oil interceptor, silt trap and waste water holding tank, drainage, entrance gates and related boundary walls, signage, landscaping, acces road and associated site works

Knockgriffin Midleton

81m
03/1723REFUSED14 Apr 2003

Installation of effluent treatment unit and retention of intensification of use of knackery

KNOCKGRIFFIN, KNOCKGRIFFIN,

85m
21/4546WITHDRAWN4 Mar 2021

Permission for Retention of existing machinery storage shed as constructed and to construct a new machinery storage shed and all associated site works.

Knockgriffin Midleton Co. Cork

85m
21/5576CONDITIONAL8 Jun 2021

Permission for (1) Retention of existing machinery storage shed as constructed and (2) to construct a new machinery storage shed and all associated external waste management activities.

Knockgriffin Midleton Co. Cork

88m
17/6191CONDITIONAL23 Aug 2017

Construction of a new ESB substation on concrete plinth at front of commercial warehouse and all associated ancillary works

Unit 2 Owenacurra Business Park Knockgriffin Midleton Co. Cork

88m
05/8989INCOMPLETED APPLICATION5 Dec 2005

Extension to existing workshop

Knockgriffin Ind. Est Midleton

88m
06/4150CONDITIONAL17 Jan 2006

Extension to light engineering workshop for use as light engineering workshop and store

Knockgriffin Ind. Est Knockgriffin Midleton

89m
21/6482INCOMPLETED APPLICATION9 Sept 2021

Permission for retention of the sub-division of a warehouse from 1 number unit to 3 number units each with independent access, retention of a first floor storage area and associated internal stairs in unit 1, retention of external building elevations consisting of; 1 number double door and first floor level window on the south elevation, 1 number window on the west elevation located at ground floor level, 1 number roller shutter door and 2 number single doors on the east elevation, and all associated works.

Unit 4 Owenacurra Business Park Knockgriffin Midleton Co. Cork

89m
21/6681CONDITIONAL1 Oct 2021

Permission for retention of the sub-division of a warehouse from 1 number unit to 3 number units each with independent access, retention of a first floor storage area and associated internal stairs in unit 1, retention of external building elevations consisting of; 1 number double door and first floor level window on the south elevation, 1 number window on the west elevation located at ground floor level, 1 number roller shutter door and 2 number single doors on the east elevation, and all associated works.

Unit 4 Owenacurra Business Park Knockgriffin Midleton Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.