16/5143

INCOMPLETED APPLICATION

Cork - Cork County Council

Proposed Development

Upgrading the existing wastewater infrastructure to provide a pumping station with septicity dosing kiosk within the boundaries of the existing treatment plant. Treatment will no longer occur on site. Existing redundant treatment equipment will be decommissioned and left in suitable and safe condition.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 May 2016

  2. Decision due

    7 Jul 2016

Application Details

Location
Bandon IDA Laragh Industrail Estate Bandon Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
13 May 2016
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
7 July 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
16/5851CONDITIONAL25 Jul 2016

Upgrading the existing wastewater infrastructure to provide a pumping station with septicity dosing kiosk within the boundaries of the existing treatment plant. Treatment will no longer occur on site. Existing redundant treatment equipment will be decommissioned and left in suitable and safe condition

Bandon IDA Laragh Industrial Estate Laragh, Bandon Co. Cork

68m
10/6062CONDITIONAL17 Aug 2010

Construction of 96sqm extension to proposed new commercial unit (Planning Reg. No. 09/6352) to be utilised as a printing and sign manufacturing facility

Laragh Bandon

68m
09/6352CONDITIONAL15 Jul 2009

Construction of new commercial unit, car park & associated works to be utilised as a printing & sign manufacturing facility

Laragh Bandon

105m
16/4958CONDITIONAL26 Apr 2016

(A) Construction of extension to existing food producing facility, (B) Construction of extensions to existing storage warehouse facilitating the food producing facility, (C) Construction of link extension between food production building and storage warehouse for use as covered loading/off-loading area, (D) To carry out all associated site works, and revised car parking arrangements including 9 no. additional spaces.

Laragh Industial Estate Laragh Bandon Co. Cork

105m
16/4158INCOMPLETED APPLICATION1 Feb 2016

(A) Construction of extensions to existing food producing facility, (B) construction of extensions to existing storage warehouse facilitating the food production facility, (C) to carry out all associated site works

Laragh Industrial Estate Laragh Bandon Co. Cork

105m
22/4039INCOMPLETED APPLICATION14 Jan 2022

(A) Construction of extension to existing food production facility, (B) Construction of extensions to existing storage warehouse facility, (C) Construction of link extension between food warehouse and food production building for use as covered loading/off-loading area, (D) To carry out all associated site works, and revised car parking arrangements. Extension of Duration to Permission granted under Planning Ref. No. 16/4958

Laragh Industrial Estate Laragh Bandon Co Cork

122m
07/6518INCOMPLETED APPLICATION28 Mar 2007

Construction of commercial unit and associated site works

Laragh Industrial Est Laragh Bandon

122m
07/7690CONDITIONAL10 May 2007

Construction of warehouse for storage of double-glazed units and associated site works

Laragh Industrial Estate Laragh Bandon

156m
08/9897INCOMPLETED APPLICATION1 Dec 2008

Change of use of Unit 2 from light industrial to a place of worship/education facility

Laragh Bandon

156m
08/10305INCOMPLETED APPLICATION22 Dec 2008

Change of use of Unit 2 from light industrial to a place of worship/education facility

Laragh Bandon

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection