16/5713
CONDITIONALCork - Cork County Council
Proposed Development
Construction of a new detached dwelling house, detached garage and the installation of a waste water treatment plant and all associated site works.
View the full application file on the council's planning portal →Application Timeline
Application received
11 Jul 2016
Decision: CONDITIONAL
14 Nov 2016
Decision due
23 Nov 2016
Grant issued
21 Dec 2016
Application Details
- Location
- Mishells Bandon Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 July 2016
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 November 2016
- Grant Date
- 21 December 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of extensions to dwelling
Mishells Bandon
Construction of loose cattle shed, milking parlour, soiled water tank, concrete apron, overground slurry storage tank and associated site works
Mishells Bandon
Dwellinghouse and installation of domestic waste water treatment unit
Mishells Bandon
Retention of conservatory and first floor extension to dwellinghouse
Mishells Bandon
Dwellinghouse
Mishells Bandon
Dwellinghouse with access roadway
MISHELLS, MISHELLS,
The provision of a Battery Energy Storage System (BESS), compound and cable route on a site of c. 4.61ha. The BESS compound will accommodate self-contained Lithium Iron Phosphate batteries within 32 no. BESS units, 8 no. MV Switchgear units, and a 38kV substation including a control room of 126m2. A cable route of c. 2km is proposed to run south from the compound to the L2033 and east along the L2033 to the nearby Bandon 110kV Substation. The proposed development includes for all associated development, site levelling, boundary treatments, security fencing, site access works, ducting and cabling and all ancillary works.
Mishells, Bandon, Co. Cork
Construction of livestock housing with 2 no. slatted tanks and associated works
Mishells Bandon
2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.
Finnis Mishells Bandon Co Cork
2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning Reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.
Finnis Mishells Bandon Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?