16449
CONDITIONALSligo - Sligo County Council
Proposed Development
development consisting of the construction of 1 no. dwelling house with packaged wastewater treatment system and raised polishing filter including all other ancillary site work and services
View the full application file on the council's planning portal →Application Timeline
Decision: CONDITIONAL
18 Jan 2017
Grant issued
18 Feb 2017
Application received
27 May 2021
Decision due
21 Jul 2021
Application Details
- Location
- Rathlee , Easkey , Co. Sligo
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Sligo County Council
- Site Area
- 0.269 ha
- Floor Area
- 196 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 27 May 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 January 2017
- Grant Date
- 18 February 2017
- Permission Expires
- 14 July 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a dwelling house, domestic garage, new site entrance. and on-site wastewater treatment system together with ancillary site development works
Rathlee , Easkey , Co. Sligo
Planning permission to: (1) Retain location of the dwelling house to that granted under PL00/885, and PL01/1061. (2) Retain conservatory extension to the side of existing dwelling, (3) retain domestic garage, together with the carrying out of all associated ancillary site works
Carrowmacbryan Td , Rathlee , Co. Sligo
alterations and extensions to an existing house, construction of a new garage and installation of a new wastewater treatment system and for all associated site works
Rathlee , Easkey , Co Sligo
Development consisting of (1) Retain fenestration changes and additional windows to side and rear elevations (2) Convert attic to habitable rooms including velux windows, (3) Install septic tank, treatment modules and percolation area (4) all ancillary site works. (Previous application PL05/778 refers)
Rathlee Td , Easkey , Co. Sligo
development will consist of; Alterations to a former single story pitched roof cottage (Floor area:58m2), with a single story, flat roof extension to the rear (Floor area: 70.5m2), to create a new 3 bedroom dwelling. Existing cottage to have blue/black concrete tile/slate roof finish with rough dash plaster wall finish. Flat roof extension to have dark grey roof membrane, nap plaster wall finish with shallow pressed aluminium roof cap. All windows and external doors to be dark grey colour with matching rainwater goods, and all ancillary site works
CarrowmacBrien , Rathlee , Co. Sligo
Development consisting of construction of dwelling house, domestic garage, installation of septic tank system with percolation area and carry out all associated ancillary site works
Carrowmacbryan , Rathlee , Easkey
(1) The construction of a dormer style dwelling house, (2) packaged tertiary treatment system with discharge of treated effluent to an in-situ soil polishing filter via a gravel infiltration layer, (3) carry out all ancillary site works
Carrowmacbryan , Rathlee Easkey , Co. Sligo
construction of a dwelling house, septic tank, percolation area and all associated site works
Carrowmacbryan Td , Easkey , Co. Sligo
Construct new dwelling house, proprietary effluent treatment plant and percolation area, together with all associated site works.
Rathlee , Easky , Co. Sligo
PP - development consisting the following: Construction of a dwelling house, proprietary effluent treatment system and percolation area and carrying out all ancillary site works
Carrowmacbryan Td , Rathlee , Easkey
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?