17/5653
CONDITIONALCork - Cork County Council
Proposed Development
a)Demolition of existing dwelling & b)construction of 2 no. semi-detached dwellings together with associated entrances & site works.
View the full application file on the council's planning portal →Application Timeline
Application received
30 Jun 2017
Decision: CONDITIONAL
24 Jan 2018
Decision due
29 Jan 2018
Grant issued
8 Mar 2018
Application Details
- Location
- No.2 Naomh Aban Terrace Flats, Ballymakeera Macroom Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 30 June 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 January 2018
- Grant Date
- 8 March 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of 4 no. dormer windows to front roof and retention of alteration to front elevation to include part natural stone finish to existing bungalow
Flats Ballymakeera
Construction of 4no. dormer windows to front of roof of existing bungalow
Flats Ballymakeera
Cead pleanála iomlán a lorg chun síneadh dhá urlár a chur leis an scoil, ag cur san áireamh, staighre éalaithe, doras éalaithe, athraithe ingearchló, ag cur fuinneog san áit ina bhfuil an doras éalaithe faoi láthair thuas staighre, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suíomh - Full Planning Permission for a 2 storey extension to the school including emergency stairs and emergency exit, changes to elevations, insertion of window in place of existing emergency exit upstairs, as well as associated site works.
Scoil Abán Naofa Máigh Réidh Flats Baile Mhic Íre, Co. Chorcaí
Cead pleanála iomlán a lorg chun athchóiriú, méadú agus cur leis an bhfoirgneamh atá ann. San áireamh, beidh oifig nua aon úrláir á thógáil ar chúl na scoile, díonta claonta nua in áit díonta léibhéala, an simné á bhaint agus airde de bhuaic díon halla na scoile á árdú. Ina theannta beidh gá ingearchló na scoile a athrú, doras tosaigh nua don halla, cuid de falla teorainn a bhaint, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suiomh. (Full Planning Permission for alterations and extension to existing school building including construction of single storey office to rear of school, new sloping roofs to replace existing level roofs, removal of chimney and raising of the apex of the school hall roof. Works will also necessitate alterations to elevations, new front door for the hall, removal of part of partition wall, as well as all associated site works).
Scoil Abán Máigh Réidh/Flats Baile Mhic íre/Ballymakeera Co. Chorcaí/Co. Cork
Demolition of existing community/school hall and construction of extension to existing national school building comprising of staff rooms, toilets, storage and remedial room and new lobby to include glazed atrium, new attached community school hall and associated site works
Flats Ballymakeera
Demolition of existing petrol station, shed, ancillary structures & 1no. habitable dwelling, construction of new petrol station with a three-storey building comprising of 4no. retail units on the ground floor and 4no. two-bed apartments and storeroom on first floor, 1no. two-bed apartment & 2no. one-bed apartments on second floor to south of the site adjacent to the public road, and construction of a seventy-bed residential nursing home with ancillary facilities to the north (rear) of the site
Flats Ballymakeera Macroom
Demolition of existing petrol station, shed, ancillary structures and 1no. habitable dwelling. Construction of a two-storey petrol station comprising of 2no. retail units on the ground floor & 1no. two-bed apartment, and 2no. one-bed apartments on the first floor. Construction of a sixty-two bed residential nursing home with ancillary facilities, all on the northern side of the public road, and on the southern side of the road, construction of a temporary waste water treatment plant with control house & associated site services/works to service the development
Flats Ballymakeera
(a) Construction of an eighty-five bed residential nursing home with ancillary facilities and associated site works to service the development. (b) Demolition of exiting petrol station, shed and ancillary structures. (c) New entrance/exit and car parking facilities.
The Flats Ballymakeera Co. Cork
Permission for Construction of an eighty-five bed residential nursing home with ancillary facilities and associated site works to service the development. (b) Demolition of exiting petrol station, shed and ancillary structures. (c) New entrance/exit and car parking facilities. Extension of Duration to permission granted under planning Ref. No. 20/4588.
The Flats, Ballymakeera, Co. Cork
Construction of temporary waste water treatment plant together with associated site works & services
Flats Ballymakeera
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?