171090

CONDITIONAL

Galway - Galway County Council

Proposed Development

to construct a dwelling house, detached garage, treatment plant and percolation area and all associated works. Gross floor space of proposed works 181sqm.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jul 2017

  2. Further information requested

    13 Sept 2017

  3. Further information received

    25 Oct 2017

  4. Decision: CONDITIONAL

    23 Nov 2017

  5. Decision due

    13 Dec 2017

  6. Grant issued

    8 Jan 2018

Application Details

Location
Rinneen ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.3 ha
Floor Area
181 sq m
Residential Units
1

Timeline

Registration Date
21 July 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 November 2017
Grant Date
8 January 2018
Permission Expires
7 January 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

350m
2661324N/A30 Jul 2026

of house, garage and all associated site services on revised site boundaries to previously approved planning permission ref: 04/3597. Amendments also include: Minor elevational changes to existing house; Roof windows & extensions to rear elevation; Tennis court located to the rear of the property

Rinneen , Gort , Co. Galway

385m
2561873N/A16 Dec 2025

of a domestic shed and horse stables and to construct a dung stead and soiled water storage tank

Rinneen , Gort , Co Galway

498m
171463N/A9 Oct 2017

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works. Gross floor space of proposed works Dwelling 182sqm, Garage 42sqm.

Lavally ,

498m
171600CONDITIONAL9 Nov 2017

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works. Gross floor space of proposed works, dwelling 182sqm, garage 42sqm.

Lavally ,

770m
171024CONDITIONAL11 Jul 2017

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works. Gross floor space of proposed works 205sqm (house) and garage 59sqm.

Lavally ,

819m
191812REFUSED21 Nov 2019

for development of a Biogas Plant on a 10.01 hectare (ha) site located in the townlands of Ballynamantan, Kinincha and Glenbrack. The Biogas plant will utilise anaerobic digestion technology to produce renewable energy and organic fertiliser. The plant will consist of; (i) Two storey office building (509 sq. m floor area) with connection to public sewer; (ii) single store electrical substation building (14.43 sq. m. floor area) and associated bunded transformer; (iii) 13.4m high feedstock reception building (3,806 sq. m floor area) incorporating; airlock lobby, feedstock reception area, processing and mixing areas, pasteurisation vessels and ancillary heating technology, wash down area, feedstock quarantine area, storage areas, workshop area, hygiene facilities, digestate separation area and process wastewater tanks; (iv) bunded tank farm (14,805 sq. m) containing; 2 no. pump house buildings (216 sq. m) and delivery pipework serving feedstock reception building, 8 no. digester vessels (each of c.15m in height and c.5, 120m3 in capacity) and 4 no. storage vessels (each of c.15m in height and c.5,120m3) fitted with gas collection roofs/domes, stairwell towers and gantries, bunded digestate dispatch bays; (v) biogas purification plant on raised concrete apron (vi) Carbon dioxide processing building (10.44m in height, 138 sq. m floor area) containing treatment plant and 4 no. outdoor storage tanks and dispatch area; (vii) Odour control system comprising air scrubber units, carbon adsorption bed and associated stack of up to 23m in height; (viii) energy centre, containing combined heat and power (CHP) plant and 2 no. standby boilers with exhaust stacks (16.4m in height); (ix) Biogas ground flare stack (c. 8m in height) and gas booster station; (x) weighbridge with secure lift barrier and all ancillary development. The development includes for construction of a new entrance to the site from N18/458 with associated signage and an access road (area of 1.734ha) from the new entrance to the Biogas plant. Permission is being sought for 10 years and is a development that is for the purpose of an activity requiring an Industrial Emissions Licence from the EPA. An EIAR and NIS has been prepared and accompanies this planning application. Gross floor space of proposed works: 4163.5 sqm

Glenbrack ,

839m
20291N/A6 Mar 2020

for change of site boundaries and relocation of entrance, dwelling house, garage and weatewater treatement system all previously approved under planning reg. ref. no. 17/1860. Gross floor space of proposed works: 205.00 sqm (house), 60.00 sqm (garage)

Lavally ,

839m
201841CONDITIONAL4 Dec 2020

and complete dwelling house, garage, wastewater treatment system and relocated entrance, all on revised site boundaries, from that previously approved under planning reg. ref. no. 17/1860. Gross floor space of proposed works; 194sqm & 60sqm

Lavally ,

843m
171860CONDITIONAL21 Dec 2017

to construct a dwellinghouse, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works (gross floor space 194 sqm dwelling; 60sqm garage)

Levally ,

844m
171518N/A20 Oct 2017

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works. Gross floor space of proposed works Dwelling 205sqm, Garage 60sqm.

Lavally ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?