The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

171158

N/A

Kildare - Kildare County Council

Proposed Development

the building of a single-storey conservatory dining room extension to the side of the house, convert a study to a kitchen and convert the kitchen to a toilet suitable for a disabled person and provide disabled access, all on the ground floor. Subdivide and convert one bedroom to an ensuite and dressing room and convert a second bedroom to a bathroom all on the first floor with associated drainage. Rewire the house, provide central heating and a photovoltaic array to save energy, remove two WCs no longer required and redecorate the house, a Protected Structure,

View the full application file on the council's planning portal →

Application Details

Location
Ballindoolin House , Ballindoolin Townland , Carbury
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Floor Area
21.3 sq m
Residential Units
1

Timeline

Registration Date
17 October 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

42m
171211CONDITIONAL31 Oct 2017

the building of a single-storey conservatory dining room extension to the side of the house, convert a study to a kitchen and convert the kitchen to a toilet suitable for a disabled person and provide disabled access, all on the ground floor. Subdivide and convert one bedroom to an ensuite and dressing room and convert a second bedroom to a bathroom all on the first floor with associated drainage. Rewire the house, provide central heating and a photovoltaic array to save energy, remove two WCs no longer required and redecorate the house, a Protected Structure,

Ballindoolin House , Ballindoolin Townland , Carbury

102m
2660202REFUSED26 Feb 2026

the construction of a wedding village consisting of 30 single storey detached pod style accommodation rooms for wedding guests, construction of 2 No. single storey detached pod style "getting ready rooms" (his and hers), construction and seasonal erection of an off-site prefabricated marquee style structure to be used as a wedding venue destination adjacent to the existing commercial element of Ballindoolin House, access road from car park to wedding village, connection to existing secondary effluent treatment system on site with an upgraded system and percolation area and all associated site works. Ballindoolin House is a protected structure (Ref B02-08 in the Kildare County development Plan 2023-2029.)

Ballindoolin House , Ballindoolin , Edenderry

145m
2660101N/A6 Feb 2026

For the construction of a wedding village consisting of 30 single storey detached pod style accommodation rooms for wedding guests, construction of 2 no. Single storey detached pod style “getting ready rooms” (his and hers), construction and seasonal erection of an off-site prefabricated marquee style structure to be used as a wedding venue destination adjacent to the existing commercial element of ballindoolin house, connection to existing secondary effluent treatment system on site and all associated site works. Ballindoolin house is a protected structure (ref b02-08 in the kildare county development plan 2023-2029)

Ballindoolin House , Ballindoolin , Edenderry

149m
2660172N/A23 Feb 2026

Of a wedding village consisting of 30 single storey detached pod style accommodation rooms for wedding guests, construction of 2 no. Single storey detached pod style “getting ready rooms” (his and hers), construction and seasonal erection of an off-site prefabricated marquee style structure to be used as a wedding venue destination adjacent to the existing commercial element of Ballindoolin House, access road from car park to wedding village, connection to existing secondary effluent treatment system on site and all associated site works. Ballindoolin house is a protected structure (ref B02-08 in the Kildare County Development Plan 2023-2029)

Ballindoolin House , Ballindoolin , Edenderry

559m
2560942N/A19 Aug 2025

for (a) construction of single story house (b)construction of Garage with domestic storage area and (c) installation of approved waste water treatment and all associated and development works

Ballindoolin , Edenderry , Co Kildare

568m
2560949REFUSED21 Aug 2025

for (a)construction of single story house (b)construction of Garage with domestic storage area and (c) installation of approved waste water treatment and all associated and development works

Ballindoolin , Edenderry , Co Kildare

609m
2560262CONDITIONAL13 Mar 2025

for a single storey extension to the rear of an existing dwelling and all associated site works. Revised by Significant Further Information which consists of: Permission is sought for the installation of a new wastewater treatment system and all associated site works

Ballindoolin , Edenderry , Co Kildare

800m
2360400CONDITIONAL22 Nov 2023

for change of house type from that previously granted planning permission under file ref no: 21/1408. There are no modifications to the garage for domestic use, wastewater treatment system, percolation area and entrance drive way as granted under the parent permission file ref 21/1408.

Carrick , Edenderry , Co. Kildare

825m
211408CONDITIONAL30 Sept 2021

for (A) erection of a two storey type house (B) garage / fuel store for domestic use (C) the installation of a proprietary waste water treatment system with polishing filter percolation area and (D) upgrade of existing recessed agricultural entrance to a double recessed vehicular entrance and access driveway and all associated site works

Carrick , Edenderry , Co. Kildare.

883m
2460047REFUSED26 Jan 2024

for retention of (a) Existing single-storey timber clad, chalet type dwelling; (b) Existing shed for domestic use; (c) Existing Oakstown BAF P4 wastewater treatment system and sand polishing filter and all associated site works

Ballindoolin , Edenderry , Co. Kildare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?