171165
CONDITIONALLimerick - Limerick County Council
Proposed Development
a three storey over partial basement Student Centre, GIA 3530M2, providing a foyer space, auditorium (200 seat) meeting rooms offices a shop and café, along with site clearance and new landscape, paving, external works including an enclosed bicycle stand. The site is located approx. 130m from Plassey House (a protected structure) and approx. 680m from Plassey Mill, and associated millstreams (a protected structure). The University of Limerick falls within an Architectural Conservation Area
View the full application file on the council's planning portal →Application Timeline
Application received
13 Dec 2017
Further information requested
12 Feb 2018
Further information received
12 Apr 2018
Decision: CONDITIONAL
2 May 2018
Decision due
9 May 2018
Grant issued
6 Jun 2018
Application Details
- Location
- University of Limerick , Sreelane , Plassey Park Road Limerick.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 13 December 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 2 May 2018
- Grant Date
- 6 June 2018
- Permission Expires
- 5 June 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the removal of the existing valley gutters and polycarbonate rooflights, the construction of new valley gutters, rooflights and access hatch together with air handling units and associated ductwork. The site is located approx. 130m from Plassey House (a protected structure) and approx. 650m from Plassey Mill (a protected structure). The University of Limerick falls within an Architectural Conservation Area
Stables Bar Student Centre , University of Limerick , Sreelane Townland Castletroy
installation of 9 no. shrouded antenna, and 3 no. transmission dishes on ballast mounted supporting poles together with 3 equipment cabinets, radio equipment, cabling and associated site works located on the rooftop
Main University Building , University of Limerick , Sreelane Castletroy Limerick.
the construction of an external lift to the south of the Foundation Building, University of Limerick, Sreelane, Castletroy, Co. Limerick. The development will consist of a three storey lift enclosure (16.5m2) between the upper plaza level and lower ground floor terrace level with a glazed link to the first floor level of the Foundation Building. The lift enclosure (13.2m high) will be clad in brickwork, concrete spandrel panels and copper roofing to match the existing building. The site is located circa 155m from Plassey House (protected structure) and circa 542m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within architectural campus falls within an architectural conservation area
University of Limerick , Castletroy , Co. Limerick.
internal alterations comprising, the demolition of internal partitions at basement and ground level, the installation of a lift between basement and ground level, the construction of disabled wheelchair refuge lobbies in the existing basement and ground level toilets and the reconfiguration of the basement level male toilets to provide wheelchair accessible toilets at Plassey House (A protected structure – RPS No. 1601), University of Limerick, Sreelane Townland, Castletroy, Limerick. The University of Limerick falls within an Architectural Conservation Area
Plassey House , Sreelane Castletroy , Co. Limerick
additional car parking, horticultural maintenance area, contemplative garden, site lighting, general landscaping and all associated site works. The site is in an Architectural Conservation Area
Milford Care Centre , Plassey Park Road , Castletroy Co. Limerick
extension of the existing common room mezzanine at the Millstream Building, University of Limerick, Sreelane, Co. Limerick. The development will comprise of a mezzanine extension of 59.5 sq.m and minor elevational modifications. The site is located circa 153 metres from Plassey House(a protected structure) and circa 509 metres from Plassey Mill and Headrace(a protected structure). The University of Limerick campus falls within an Architectural Conservation Area
University of Limerick , Sreelane , Co. Limerick
the construction of a prefabricated unit for 1 no. classroom and 1 no. SET room, to the rear of existing school and all ancillary site works
Milford N.S. , Milford Grange , Castletroy Co. Limerick.
change of use from light industrial to office use
Block 1 International Science Centre , University of Limerick , Castletroy Co. Limerick
subdivision of Office Suite 1 on the Ground Floor of the existing building to form 2 no. independent Office Suites
Block 1 International Science Centre , University of Limerick , Castletroy Co. Limerick
the installation of roof-mounted heat pumps and photovoltaic panels, with ancillary site works. The site is located circa 155m from Plassey House (protected structure) and circa 542m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within an architectural conservation area
International Business Centre , Block 2 University of Limerick , Dromroe Castletroy Co. Limerick
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?