The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

17133

N/A

Waterford - Waterford City and County Council

Proposed Development

to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials

View the full application file on the council's planning portal →

Application Details

Location
Kereen Lower , Cappoquin , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
27 February 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
17160CONDITIONAL13 Mar 2017

to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials

Kereen Lower , Cappoquin , Co. Waterford

0m
1775N/A6 Feb 2017

to extend the infill part of the Exhausted Quarry with Inert material and an area to recycle construction materials. The activity involved an activity that requires a Waste Facility Permit.

Kereen Lower , Cappoquin , Co. Waterford

0m
22133REFUSED23 Feb 2022

Extension of Duration to Planning File 17/160 to extend the infill part of the exhausted quarry with inert material and an area to recycle construction materials. The activity involves an activity that requires a waste facility permit

Kereen Lower , Cappoquinn , Co. Waterford

81m
22695N/A5 Aug 2022

for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

Kereen Lower , Cappoquin , Co. Waterford

81m
22492N/A8 Jun 2022

PERMISSION for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

Woodstock and Kereen Lower , Cappoquin , Co. Waterford

81m
2460345CONDITIONAL24 Jun 2024

for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.

Woodstock & Kereen Lower , Cappoquin , Co. Waterford

81m
22739REFUSED22 Aug 2022

for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

Woodstock and Kereen Lower , Cappoquin , Co. Waterford

81m
22458N/A27 May 2022

the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application

Woodstock and Kereen Lower , Cappoquin , Co. Waterford

339m
2360610CONDITIONAL14 Dec 2023

for the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works

Woodstock , Cappoquin , Co. Waterford

339m
2560809CONDITIONAL14 Nov 2025

the minor amendments to development permitted under ref. no 23/60610 and comprises the replacement of a detached timber-frame dwelling with a detached block-work dwelling, including ancillary localised site works. The residential development permitted under ref. no. 23/60610 remains otherwise unchanged.

Woodstock , Cappoquin , Co. Waterford

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection