The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

17158

CONDITIONAL

Kildare - Kildare County Council

Proposed Development

change of use to previously granted planning permission (P.A. Ref. No. 10/906 and ABP Ref. No. PL 09.239119) to areas as follows: (1) Retail unit change of use to Residents’ Reception. (2) Students’ Social Room change of use to Residents’ Administration Office and associated supporting accommodation; all located at ground floor of Courtyard 01 Building of Student Housing Complex

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Feb 2017

  2. Decision due

    12 Apr 2017

  3. Decision: CONDITIONAL

    12 Apr 2017

  4. Grant issued

    17 May 2017

Application Details

Location
North Campus of the National University of Ireland Maynooth , Maynooth , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.133 ha

Timeline

Registration Date
16 February 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 April 2017
Grant Date
17 May 2017
Permission Expires
16 October 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

13m
1783N/A27 Jan 2017

change of use to previously granted planning permission (P.A Ref No: 10/906 & ABP Ref. No: PL 09.239119) to areas as follows: 1. Retail Unit change of use to Residents Reception 2. Students Social Room change of use to Residents Administration Office and associated supporting accommodation: all located at ground floor of Courtyard 01 Building of Student Housing Complex at North Campus

National University of Ireland Maynooth , Maynooth , Co. Kildare

66m
22413CONDITIONAL11 Apr 2022

development on the North Campus, Maynooth University, Maynooth, Co Kildare. The development will consist of the provision of an outdoor gym facility and sports area along with all associated site development works

North Campus , Maynooth University , Maynooth

96m
17566CONDITIONAL18 May 2017

the installation of a new flood lighting system to existing rugby and soccer pitches including all associated site and ancillary works

Maynooth University North Campus , Maynooth , Co. Kildare

125m
23598CONDITIONAL1 Jun 2023

the installation of a new compound to include three standby generators with a capacity of 1500KVA each, fuel storage tank and electrical installations, protective bund along with all associated site development works to include protective perimeter fencing to compound

The North Campus , Maynooth University , Maynooth

158m
17561CONDITIONAL17 May 2017

the construction of an extension to North East of the Electronic Engineering Building to provide accommodation for a national facility for radio science and 5 G wireless testing and research. The extension is to be comprised of; a testing chamber with associated measurement control room, service corridors, entrance lobby and connection to the existing Electronic Engineering Building including all associated site and ancillary works

Maynooth University North Campus , Maynooth , Co. Kildare

177m
2360246CONDITIONAL26 Sept 2023

to erect an 18m high monopole telecommunication structure, carrying antennas, dishes and associated telecommunications equipment including a ground based equipment cabinet surrounded by a protective cage. The adjoining existing 16 metre high floodlight structure will be removed, and the floodlights will be relocated to the proposed telecommunications monopole

Maynooth GAA Club , Moyglare Road , Maynooth Co. Kildare

209m
22796CONDITIONAL30 Jun 2022

development on the north campus, Maynooth University. The development will consist of the installation of 8 No. stand alone modular study pod units along with all associated site development works

North Campus Maynooth University , Maynooth , Co. Kildare.

213m
2460904CONDITIONAL13 Sept 2024

for development at this c. 0.38ha site, on lands located at the Pheonix Sports and Restaurant Building. The proposed development is comprised of the partial demolition of c. 350 sqm of the south-eastern section of the existing sports building. (The Phoenix Sports Centre and Restaurant Building). This is to facilitate the construction of a new 3 no. storey sports science extension (c. 3,427sqm), comprised of lobby and reception areas; general gym; sports hall; research and teaching labs; administrative offices and associated teaching, student, and staff facilities. The development also includes removal of an existing cycle storage area and the provision of a new covered bike storage, all site development works hard and soft landscaping; plant; public lighting; signage; piped infrastructure and ducting; boundary treatments; SUDs; changes in level and all associated site development, clearance and excavation works above and below ground

The Pheonix Sports and Restaurant Building , Maynooth University , Maynooth

240m
21537CONDITIONAL22 Apr 2021

the construction of a single storey shed in the rear garden of the house. All associated site works and all ancillary minor works

84 Moyglare Abbey , Maynooth , Co. Kildare

247m
21453N/A7 Apr 2021

the construction of a single storey shed in the rear garden of thehouse, All associated site works and all ancillary minor works

84 Moyglare Abbey , Maynooth , Co.Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?