17211

CONDITIONAL

Kerry - Kerry County Council

Proposed Development

RETAIN DOMESTIC GARAGE AS CONSTRUCTED

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Mar 2017

  2. Decision: CONDITIONAL

    4 May 2017

  3. Decision due

    8 May 2017

  4. Grant issued

    8 Jun 2017

Application Details

Location
LISSAVANE EAST , LISTRY , CO KERRY
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kerry County Council
Site Area
0.23 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
14 March 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 May 2017
Grant Date
8 June 2017
Permission Expires
7 June 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18602CONDITIONAL19 Jun 2018

CONSTRUCT AN EXTENSION TO EXISTING DWELLING HOUSE AND ALL ANCILLARY SITE SERVICES

LISSAVANE EAST , LISTRY , KILLARNEY

295m
231167CONDITIONAL12 Dec 2023

CONSTRUCT A TWO STOREY DWELLING HOUSE, SERVICED BY EFFLUENT TREATMENT SYSTEM AND SAND POLISHING FILTER TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS

LISSAVANE EAST , MILLTOWN , KILLARNEY

485m
20720CONDITIONAL12 Aug 2020

CONSTRUCT A NEW DWELLING HOUSE WITH CONNECTION TO WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE SERVICES

LISSAVANE EAST , LISTRY , KILLARNEY

562m
18803CONDITIONAL15 Aug 2018

DEMOLISH PART OF EXISTING DWELLING HOUSE AND FOR PERMISSION TO CONSTRUCT EXTENSIONS AND RENOVATIONS TO EXISTING DWELLING HOUSE AND TO INSTALL A NEW WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE SERVICES

LISSAVANE WEST , LISTRY , KILLARNEY CO. KERRY

677m
21303CONDITIONAL23 Mar 2021

RETAIN REAR EXTENSION, CARPORT AND 2 NO. OUTBUILDINGS AND TO RETAIN DWELLING HOUSE AS CONSTRUCTED WITHIN THE REVISED SITE BOUNDARIES

LISTRY CROSS , FAHA , KILLARNEY

732m
17730CONDITIONAL26 Jul 2017

CONSTRUCT A DWELLING HOUSE SERVED BY AN EFFLUENT TREATMENT TANK AND SAND POLISHING FILTER

KNOCKREAGH , MILLTOWN

831m
19553CONDITIONAL28 May 2019

(1) CONSTRUCT 3 NR DWELLING HOUSES C/W TREATMENT UNITS AND POLISHING FILTERS AND (2) PERMISSION TO CONSTRUCT ACCESS ROAD AND SERVICES

LISTRY , CO KERRY

839m
221130CONDITIONAL1 Nov 2022

CONSTRUCT 3 NR DWELLING HOUSES C/W TREATMENT UNITS AND POLISHING FILTERS, ALL IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED (PLANNING REF 19/553)

LISTRY , CO KERRY

972m
2560856CONDITIONAL22 Sept 2025

REDIII: A 10 year planning permission for a solar farm, 38kV substation and underground cabling grid connection, and energy storage compound with a total area of circa 57 hectares. The proposed development will consist of a solar farm comprising of c.230,000 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 14 no. single storey electrical transformer stations. The energy storage compound will consist of 36 no. containerised energy storage modules and associated plant and equipment, 9 no. transformers and 2 no. auxiliary transformers, 2 no. spare parts containers and 1. no. office unit. Planning permission is also sought for 1 no. 38kV substation and associated electrical compound, including single storey control building, line bay, transformer and accompanying apparatus, and associated grid connection between the proposed substation and Oughtragh 110kV substation comprising 38kV underground electricity cabling of c.3.87km in length to be provided in an excavated trench on private lands and the L11003, L8003 and L80030 public roads, and all associated site development and reinstatement works. The project will also include 33kV underground interconnector electrical cabling within the development site and within the L11003 public road, temporary construction compounds, security fencing, CCTV, access tracks, landscaping (including hedgerow removal and planting), drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 6 no. entrances from the L11003 and L80030, with 1 no. of these entrances used for the temporary construction phase only. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Ballyoughtragh South Commons , Farranmanagh Knocknaman and Lisheennashingane (Townlands) , Milltown County Kerry

1.1km
2465CONDITIONAL15 Feb 2024

(A) CONSTRUCT A NEW DWELLING HOUSE (B) CONSTRUCT A NEW WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE SERVICES

KNOCKEEN , LISTRY , BEAUFORT

Planning a project of your own?