17223
CONDITIONALLeitrim - Leitrim County Council
Proposed Development
Upgrade the existing waste water treatment facility to an on-site waste water treatment facility which complies with the current EPA COP and all ancillary works
View the full application file on the council's planning portal →Application Timeline
Application received
28 Nov 2017
Decision: CONDITIONAL
29 Jan 2018
Decision due
31 Jan 2018
Grant issued
5 Mar 2018
Application Details
- Location
- Gortnasillagh West , Drumkeerin , Co. Leitrim
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Leitrim County Council
Timeline
- Registration Date
- 28 November 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 January 2018
- Grant Date
- 5 March 2018
- Permission Expires
- 4 March 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ten year planning permission with a 40-year operational life (from the date of commissioning of the development). (ii) Construction of 4 No. wind turbines with an overall ground to blade tip height ranging from 149.85m to 150m inclusive. The wind turbines will have a rotor diameter ranging from 115.7m to 117m inclusive and a hub height ranging from 91.5m to 92m inclusive. (iii) Construction of permanent turbine hardstands and turbine foundations. (iv) Construction of a bottomless bridge culvert across a minor stream on site (EPA River Segment Code: 26_4053). (v) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. (vi) Installation of one (40-year life cycle) meteorological mast with a height of 50m and a 4m lightning pole on top. (vii) Construction of new internal site access tracks and upgrade of a section of existing internal Site track, to include all associated drainage. (viii) Improvement of existing site entrance with access via the L4282. (ix) Development of an internal site drainage network and sediment control systems. (x) Construction of 1 no. permanent 20kV electrical substation. (xi) All associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation. (xii) All works associated with the connection of the wind farm to the national electricity grid, which will be via 20kV underground and partially overhead cable connection approximately 6.4km in length to the existing ESB Corderry 110kV Substation in the townlands of Letter, Greaghnadarragh, Stangaun, Corralustia, Turpaun, Gortnasillagh West, Lugmeeltan, Leckaun, Lisgavneen, Treannadullagh, Drumcashlagh and Corderry. (xiii) Ancillary forestry felling to facilitate construction of the development. (xiv) All associated site development works including berms, landscaping, and soil excavation. (xv) Installation of battery arrays located within container units (2 no. units) and associated electrical plant for grid stabilisation adjacent to the substation building. (xvi) Development of one on-site borrow pit.
Letter Boleybaun Stangaun Greaghnadarragh Corralustia Turpaun Gortnasillagh West Lugmeeltan Leckaun Lisgavneen Treannadullagh Drumcashlagh and Corderry , Drumkeeran , County Leitrim
(a) retention of the existing two storey type domestic dwelling with living accommodation in roof space, (b) retention of an existing agricultural fodder storage shed, (c) retention of attached domestic garage, (d)retention of the existing wing walls and piers at site entrance and (e) amend site boundaries which were granted under parent application no 07/1051, and all ancillary works
Derrinurn , Drumkeeran , Co. Leitrim
(a) retain the existing single storey domestic dwelling, (b) upgrade the existing waste water treatment system to current EPA code of practice and all ancillary works
Drumcashlagh , Drumkeeran , Co Leitrim
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?