The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

17229

N/A

Offaly - Offaly County Council

Proposed Development

CONSTRUCTION OF (I) CUBICLE HOUSE WITH SLATTED TANKS (II) CRUSH/HANDLING YARD (III) DAIRY WASH TANK AND ALL ASSOCIATED SITE WORKS.

View the full application file on the council's planning portal →

Application Details

Location
LISMONEY , KINNITTY , BIRR
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council

Timeline

Registration Date
28 June 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
17254CONDITIONAL14 Jul 2017

CONSTRUCTION OF (i) CUBICLE HOUSE WITH SLATTED TANKS (ii) CRUSH/HANDLING YARD (iii) DAIRY WASH TANK AND ALL ASSOCIATED SITE WORKS

LISMONEY , KINNITTY BIRR , CO. OFFALY

314m
19587CONDITIONAL10 Dec 2019

THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING AND DOMESTIC GARAGE, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS, INCLUDING THE UPGRADE OF AN EXISTING AGRICULTURAL TRACK AND A PROPOSED SITE ENTRANCE

LISMONEY , KINNITTY BIRR , CO OFFALY

611m
2053CONDITIONAL24 Feb 2020

CONSTRUCTION OF A 30M HIGH MULTI-USER LATTICE TELECOMMUNICATIONS STRUCTURE, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4M HIGH PALISADE FENCE COMPOUND INCLUDING NEW ACCESS TRACK TOGETHER WITH ASSOCIATED GROUND EQUIPMENT AND ASSOCIATED SITE WORKS

KINNITY GAA CLUB , CASTLETOWN AND GLINSK TD , KINNITY CO OFFALY

800m
2660398N/A24 Jul 2026

change of house design from that granted permission under planning file ref. 25/60199, with all associated site works

Castletown , Kinnity , Birr Co.Offaly

800m
2660428N/A14 Aug 2026

change of house design from that granted permission under planning file ref. 25/60199, with all associated site works

Castletown , Kinnity , Birr Co.Offaly

800m
2560199CONDITIONAL26 May 2025

the construction of a new extension to the rear and side of the existing house, the refurbishment of the existing house including internal and external alterations, the removal of the existing front porch, the construction of a separate garage, and all associated site development works.

Castletown , Kinnity , Birr Co Offaly

857m
19474CONDITIONAL3 Oct 2019

DEVELOPMENT THAT WILL CONSIST OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT CONSISTS OF WORK TO A PROTECTED STRUCTURE

KINNITTY CASTLE HOTEL , CASTLETOWN KINNITTY , BIRR CO. OFFALY

860m
19459N/A20 Sept 2019

DEVELOPMENT CONSISTING OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE.

KINNITY CASTLE HOTEL , CASTLETOWN KINNITY , BIRR CO OFFALY

907m
21348N/A8 Jun 2021

CONVERSION OF EXISTING OUTBUILDING TO PROPOSED DWELLING, WITH CONNECTIONS TO EXISTING WATER SUPPLY AND SEPTIC TANK WITH ANCILLARY WORKS APPLICABLE THERETO

LISMOONEY , KINNITTY BIRR , CO. OFFALY

1.1km
17493REFUSED18 Dec 2017

CONSTRUCTION OF PETROL FILLING STATION, CANOPY, SHOP, ACCESS ROAD AND ALL ANCILLARY SERVICES

LISMONEY , KINNITTY , CO OFFALY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?