17303
N/AOffaly - Offaly County Council
Proposed Development
INFILLING OF LANDS WITH MATERIAL CONSISTING OF CLEAN, UNCONTAMINATED SOIL AND STONES AND FOR THE CRUSHING OF CONCRETE ON A SPORADIC BASIS (WHICH IS NOT FOR INFILLING ON THE SITE) PRIOR TO ITS REMOVAL FOR REUSE. PERMISSION IS ALSO SOUGHT FOR ONE TEMPORARY ONSITE PORTABLE TOILET AND ONE TEMPORARY PORTACABIN WHICH WILL SERVE AS AN OFFICE FOR THE DURATION OF THE INFILLING PROCESS. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT. SUBSEQUENT TO PLANNING A WASTE FACILITY PERMIT WILL BE SOUGHT FROM OFFALY COUNTY COUNCIL ENVIRONMENT SECTION FOR THE DURATION OF THE INFILLING PROCESS
View the full application file on the council's planning portal →Application Details
- Location
- BALLYCON , MOUNT LUCAS , CO. OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
Timeline
- Registration Date
- 17 August 2017
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
INFILLING OF LANDS WITH MATERIAL CONSISTING OF CLEAN, UNCONTAMINATED SOIL AND STONES AND FOR THE CRUSHING OF CONCRETE ON A SPORADIC BASIS (WHICH IS NOT FOR INFILLING ON THE SITE) PRIOR TO ITS REMOVAL FOR REUSE. PERMISSION IS ALSO SOUGHT FOR ONE TEMPORARY ONSITE PORTABLE TOILET AND ONE TEMPORARY PORTACABIN WHICH WILL SERVE AS AN OFFICE FOR THE DURATION OF THE INFILLING PROCESS. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT. SUBSEQUENT TO PLANNING A WASTE FACILITY PERMIT WILL BE SOUGHT FROM OFFALY COUNTY COUNCIL ENVIRONMENT SECTION FOR THE DURATION OF THE INFILLING PROCESS
BALLYCON , MOUNT LUCAS , CO. OFFALY
A. a new single-storey extension to the east side of the existing house. B. Retention Permission Sought for the partial conversion of the attic area into a storage area C. All associated Site works
Ballycon , Daingean , CO. OFFALY
A. a new single-storey extension to the east side of the existing house. B. Retention Permission Sought for the partial conversion of the attic area into a storage area C. All associated Site works
Ballycon , Daingean , CO. OFFALY
THE IMPORTATION OF INERT SOIL FOR THE PURPOSES OF INFILLING LAND FOR AGRICULTURAL USE AND ALL ASSOCIATED SITE WORKS
ESKER MORE DAINGEAN CO. OFFALY , AND , BALLYCON DAINGEAN CO. OFFALY
THE IMPORTATION OF INERT SOIL FOR THE PURPOSES OF INFILLING LAND FOR AGRICULTURAL USE AND ALL ASSOCIATED SITE WORKS
ESKERMORE , DAINGEAN , CO. OFFALY
RENOVATION AND EXTENSION OF EXISTING BUNGALOW, UPGRADE EXISTING SEPTIC TANK SYSTEM, DEMOLISH OUTBUILDINGS AND ALL ASSOCIATED WORKS
BALLYCON , MOUNT LUCAS , CO. OFFALY
(A) 1 NO. NEW BUNGALOW TYPE DWELLING HOUSE, (B) 1 NO. NEW DOMESTIC GARAGE, (C) INSTALLATION OF A NEW SEPTIC TANK WITH STANDARD PERCOLATION AREA, (D) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ESKER MORE , DAINGEAN , CO. OFFALY
A Design variation to previous grant of planning permission no. 18/413 for extension and alterations existing dormer Bungalow. New Design Proposal to include for revised alterations to the front façade, revised extension to the rear and revised alterations to the existing dormer accommodation. All other items aspects of planning permission grant. 18/413, such as existing Domestic Use Shed, existing Wastewater Treatment System, Percolation area and all other associated site works remain unchanged
Ballycon , Daingean , CO. OFFALY
ALTERATIONS TO EXISTING DWELLING INCLUDING CHANGES TO THE FRONT FACADE AND ALSO NEW EXTENSION TO THE REAR OF THE EXISTING DWELLING, WITH ALL ANCILLARY SITE WORKS
BALLYCON , DAINGEAN , CO. OFFALY
THE CONSTRUCTION OF A TWO STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS
BALLYCON , DAINGEAN , CO OFFALY
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?