1737541
CONDITIONALCork - Cork City Council
Proposed Development
Permission is sought for a new pumping station and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
18 Aug 2017
Decision: CONDITIONAL
13 Dec 2017
Decision due
14 Dec 2017
Grant issued
24 Jan 2018
Application Details
- Location
- Harbour View Road , Cork City
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
- Site Area
- 0.1477 ha
Timeline
- Registration Date
- 18 August 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 December 2017
- Grant Date
- 24 January 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the demolition of an existing rear single-storey extension, removal of 2 no. existing sheds at the rear, construction of a rear two-storey extension including rooflights, a single-storey front extension, new windows to the southwest elevation, and all associated site development works.
No.1 Ardcullen Close , Hollyhill , Cork
permission for 1) the erection of two roof mounted insulated chimneys 2)two diesel storage tanks each with a capacity of 10000 litres 3)two water storage tanks each with the capacity of 10000 litres 4) one bund area consisting of a total capacity of 11000 litres. additionally permission is sought for the retention of 1) external plant room 2) a low height wall with fencing a service footpath and electrical and data groundworks on the northwest elevation 3) roof mounted solar panels on the southeast elevation 4) four roof mounted air inlet vents and minor alterations to the fenestration on the northeast elevation
Unit 8 , Hollyhill Industrial Estate , Hollyhill
Permission is sought for the erection of 1. Lean-to and Roof Mounted Solar Panels to the South East Elevation of Existing Unit and associated service gantry. 2. New deck with perimeter railing to accommodate Geodome satellite receivers to Existing Roof of Existing Unit and associated site works.
Unit 8 , Hollyhill Industrial Estate , Hollyhill
Permission for the construction of an equipment storage building and all ancillary site development works.
Hollyhill Industrial Estate , Hollyhill , Cork
Retention permission for development of this site at: 113 Ardcullen, Hollyhill, Co.Cork, T23H96V. The development consists of : Permission for the retention of (1) A single storey portico with lean-to roof to front of existing dwelling, and (2) A decorative stone cladding finish to front elevation at ground floor level to existing dwelling.
113 Ardcullen , Hollyhill , Co.Cork
Permission for the demolition of part of an existing warehousing building and the construction of a new extension to the warehousing building including a cantilever canopy, waste enclosure with a roof level generator within a plant enclosure and all associated site development works at the Hollymount Industrial Estate, Hollyhill, Cork. The proposed use of new extension includes warehouse space and a central food processing unit with staff facilities and office space at mezzanine level. The proposed site development works include the construction of a new substation building, new vehicular gate providing access to all both occupiers of the site and a new pedestrian access from Harbour View Road. The development comprises of an activity which requires a Waste Permit under the Waste Management Act 1996 (as amended).
Hollymount Industrial Estate , Hollyhill , Cork
Permission for the construction of 2 no. plant buildings, 2 no. oil tanks and all associated site development works at Hollyhill Industrial Estate, Tadhg Barry Road, Hollyhill, Cork. The proposed plant buildings will be located within the existing service yard and will accommodate back-up generators, a medium voltage switchroom and a control room.
Hollyhill Industrial Estate , Tadhg Barry Road , Hollyhill
Permission for alterations within the existing lower service yard consisting of the construction of a 110.5m2 single storey extension with a rooftop plant enclosure to an existing production building and all ancillary site development works.
Hollyhill Industrial Estate , Tadgh Barry Road , Holyhill
Permission for the construction of a new substation building within the existing car park to cater for additional electric car charging points at the Hollyhill Industrial Estate
Hollyhill Industrial Estate , Tadhg Barry Road , Hollyhill
Permission for modifications to the elevation of an existing building and all ancillary site development works at Hollyhill Industrial Estate, Tadhg Barry Road, Holyhill, Cork. The proposed modifications consist of upgrades to the elevation of an existing office building including the addition of new windows at ground and first floor levels facing into the existing service yard. Permission is also sought for the retention of modifications to two loading bays including a ground floor extension and associated modifications to the elevations.
Hollyhill Industrial Estate , Tadhg Barry Road , Holyhill
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?