1744
CONDITIONALKildare - Kildare County Council
Proposed Development
continuation of business use of existing mezzanine floors and warehouse space as Research, Development, Engineering and Design. This would involve the removal of Condition No. 2 of Planning Register Reference 07/769. A new window on the first floor rear elevation and all associated siteworks
View the full application file on the council's planning portal →Application Timeline
Application received
19 Jan 2017
Further information requested
13 Mar 2017
Further information received
15 Mar 2017
Decision: CONDITIONAL
23 Mar 2017
Decision due
11 Apr 2017
Grant issued
4 May 2017
Application Details
- Location
- Unit D3 M7 Business Park , Newhall , Naas
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.048 ha
Timeline
- Registration Date
- 19 January 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 March 2017
- Grant Date
- 4 May 2017
- Permission Expires
- 3 May 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for change of use from educational to manufacturing and warehousing which was previously granted under planning number 00/768, including internal alterations
Unit C1 , M7 Business Park , Newhall Naas
(a) change of use at ground floor from 435m2 Warehousing to Light Industrial use (b) change of use at ground floor from 34m2 warehousing to office (c) addition of 32.5m2 office space on first floor (d) addition of 6 new windows on the north east façade and all associated site works
Unit F1 , M7 Business Park , Newhall
retention of floor space and associated alterations created by the addition of a mezzanine within previously approached warehouse
Unit A5 , M7 Business Park Newhall , Naas
the construction of 266sqm extension, with a ground floor of 206sqm and a mezzanine of 60sqm, connection to existing services and all associated site works to the side of our existing industrial unit at M7 Business Park. The structure will be constructed in a three bay portal framed, metal cladding to match the existing unit
Unit Q2 Nugent Manufacturing , M7 Business Park , Newhall
for the retention of the first-floor mezzanine and associated internal alterations and associated site works. Retention of 7 No. windows to the south-west elevation. Planning permission is sought for 2 No. windows to the south-west elevation & 2 No. windows on the south-east elevation with internal alterations and associated site works
Unit B5 , M7 Business Park , Co. Kildare
for the first-floor mezzanine and associated internal alterations and associated site works. Retention of 7 No. windows to the south-west elevation. Planning permission is sought for 2 No. windows to the south-west elevation & 2 No. windows on the south-east elevation with internal alterations and associated site works
Unit B5 M7 Business Park , Newhall , Naas
retention permission is sought for a 106sqm first floor mezzanine storage area within an existing industrial unit and all associated site works
Unit J6 M7 Business Park , Newhall , Naas
an existing 25 metre high telecommunications support structure together with associated ground equipment cabinets within a fenced compound
M7 Business Park , Newhall (Ed Ladytown) Td. , Naas
The development consists of retention permission for a change of use of 194m2 existing warehouse to light industrial with ancillary offices; retention permission for 83m2 of light industrial at first floor and planning permission for the use of 439m2 first floor mezzanine for light industrial and ancillary offices; and retention for existing sign 8m2 to front elevation and 8m2 of additional signage to the front of the building together with associated site works
Unit TM7 Business Park , Newhall , Naas
Entrance Works Piers & Wing Walls with Surfacing of land & Planning Permission for New Storage Shed & Front Boundary Wall with railing and all associated site works
Newhall Ladytown , Naas , Co. Kildare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?