The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

17494

CONDITIONAL

Cavan - Cavan County Council

Proposed Development

to construct a new single storey classroom, connection to on site services, and associated works. Significant further information and revised plans have been submitted

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Nov 2017

  2. Further information requested

    18 Jan 2018

  3. Further information received

    19 Apr 2018

  4. Decision: CONDITIONAL

    11 May 2018

  5. Decision due

    16 May 2018

  6. Grant issued

    14 Jun 2018

Application Details

Location
Kill National School , Drumhurt , Kill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council

Timeline

Registration Date
24 November 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 May 2018
Grant Date
14 June 2018
Permission Expires
13 June 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

37m
17286CONDITIONAL27 Jun 2017

new single storey prefabricated classroom, connection to on site services, new carpark and associated works

Kill National School , Drumhurt , Kill

37m
20387CONDITIONAL4 Sept 2020

to continue the use of an existing prefabricated classroom for a further period of time, in connection with Planning Ref 17/286

Kill National School , Drumhurt , Kill

37m
19403CONDITIONAL14 Oct 2019

for new Astro Turf Playing Pitch with new flood lighting, associated perimeter fencing, new footpath and all ancillary works

Drumhurt , Kill , Co. Cavan

37m
21176CONDITIONAL29 Mar 2021

to construct a new single storey classroom, new special educational teacher support room (SEN), relocate toilets, demolition of existing shelters & shed, connection to on site services, and associated works

Kill National School , Drumhurt , Kill

70m
19245CONDITIONAL24 Jun 2019

for development of a formal carpark/set down area, lighting and associated works, all connected to existing services on site

Drumhurt , Kill , Co. Cavan

92m
2660294CONDITIONAL28 May 2026

for (1) car parking and set-down area to facilitate a one-way vehicular access and egress system; (2) erection of a single-storey extension to the front of the building (3) external disabled access ramp (4) internal and external alterations to the existing building; and (5) modification of Condition 2 of Planning Permission Ref. No. 2460237 to permit operational hours from 08:00 to 18:00, together with all ancillary site development works

Drumhurt , Kill Cootehill , Co Cavan.

94m
2460237CONDITIONAL29 May 2024

for 1) Retain change of use from existing dwelling to after school childcare facility, external play area and fencing, 2) Planning permission sought for roof structure above external play area and alterations to site layout to include new path access to existing carpark and all ancillary works

Drumhurt , Kill , Cootehill

355m
17468CONDITIONAL8 Nov 2017

to alter the previously approved application, planning permission reference 16/319. Alterations include; a reduction in overall floor area of the proposed two storey dwelling, elevation changes, alterations to the internal layout, changes to the site layout and all associated site works

Cornamucklagh and Drumhurt , Kill , Co. Cavan

705m
18540REFUSED19 Dec 2018

to demolish existing hay shed building and erect fully serviced 2 storey dwelling with entrance, sewerage treatment facilities and all ancillary works

Drumerkillew , Kill Cootehill , Co. Cavan

1.0km
2560205CONDITIONAL29 Apr 2025

to (1) Construction of underground slurry and soiled water storage tank with slatted and solid passage areas at ground level, (2) Completion of all ancillary site works and associated site structures

Cornabeagh , Kill , Cootehill Co. Cavan

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?