1750281
CONDITIONALDonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
28 Feb 2017
Decision: CONDITIONAL
21 Apr 2017
Decision due
24 Apr 2017
Grant issued
29 May 2017
Application Details
- Location
- BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.884 ha
- Floor Area
- 230.04 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 28 February 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 April 2017
- Grant Date
- 29 May 2017
- Permission Expires
- 28 May 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
DOMESTIC GARAGE AND 1 WINDOW AT FIRST FLOOR LEVEL ON THE NORTH-EAST GABLE OF THE DWELLING HOUSE
BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
DOMESTIC GARAGE AND 1 WINDOW AT FIRST FLOOR LEVEL ON THE NORTH-EAST GABLE OF THE DWELLING HOUSE
BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
SITE EXCAVATION AND LEVELLING WORKS TO THE REAR OF DWELLING HOUSE AND PLANNING PERMISSION FOR THE CONSTRUCTION OF A DETACHED GARAGE AND STORE AND ASSOCIATED SITE WORKS
BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS AND SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION
KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL
A PERIOD OF 10 YEARS FOR PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION
KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL
(1) COMPLETION OF 10 NO. SEMI-DETACHED DWELLING HOUSES INCLUDING AMENDMENTS TO THE FRONT ELEVATION AND CONSTRUCTION OF A REAR EXTENSION TO EACH DWELLING HOUSE DESIGN (2) UPGRADING OF EXISTING ON-SITE TREATMENT SYSTEM (3) COMPLETION OF SERVICE ROAD, FOOTPATHS AND ASSOCIATED SITE DEVELOPMENT WORKS
BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
DEVELOPMENT PREVIOUSLY APPROVED UNDER PLANNING REFERENCE NUMBERS 03/1080, 08/20133 AND 10/20376 (1) COMPLETION OF (A) 10 NO SEMI-DETACHED DWELLING HOUSES INCLUDING AMENDMENTS TO THE FRONT ELEVATION AND CONSTRUCTION OF A REAR EXTENSION TO EACH DWELLING HOUSE DESIGN (B) SERVICE ROAD, FOOTPATHS AND ASSOCIATED SITE DEVELOPMENT WORKS (2) UPGRADING OF EXISTING ON-SITE TREATMENT SYSTEM
BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
(1) RETENTION OF (A) 2NO. DOMESTIC GARAGES ADJACENT TO THE SOUTHWEST CORNER OF EXISTING DWELLING AND (B) STONEER CLADDING TO THE NORTHEAST ELEVATION OF EXISTING DWELLING, (2) CONSTRUCTION OF AN EXTENSION TO THE SOUTHWEST ELEVATION OF EXISTING DWELLING, (3) ALTERATION OF EXISTING DWELLING TO THE NORTHEAST ELEVATION AND (4) ALL ASSOCIATED SITEWORKS AND CONNECTION TO ALL EXISTING SERVICES
BALLYLOUGHAN , BRUCKLESS , CO. DONEGAL
(1) POST OFFICE AND MINOR EXTENSIONS TO THE DEVELOPMENT AND (2) MINOR ELEVATIONAL CHANGES FROM PREVIOUS PLANNING REF. NO. 97/2708, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS AND PERMISSION FOR CHANGE OF USE FROM SUPERMARKET TO SUPERMARKET WITH ANCILLARY OFF SALES
SPAR - BRUCKLESS , BRUCKLESS , DUNKINEELY DONEGAL PO
(1) POST OFFICE AND MINOR EXTENSIONS TO THE DEVELOPMENT AND (2) MINOR ELEVATIONAL CHANGES FROM PREVIOUS PLANNING REF. NO. 97/2709, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS AND PERMISSION FOR CHANGE OF USE FROM SUPERMARKET TO SUPERMARKET WITH ANCILLARY OFF SALES
SPAR - BRUCKLESS , BRUCKLESS , DUNKINEELY DONEGAL PO
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?