The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

1750281

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Feb 2017

  2. Decision: CONDITIONAL

    21 Apr 2017

  3. Decision due

    24 Apr 2017

  4. Grant issued

    29 May 2017

Application Details

Location
BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.884 ha
Floor Area
230.04 sq m
Residential Units
1

Timeline

Registration Date
28 February 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 April 2017
Grant Date
29 May 2017
Permission Expires
28 May 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

417m
1851322N/A23 Aug 2018

DOMESTIC GARAGE AND 1 WINDOW AT FIRST FLOOR LEVEL ON THE NORTH-EAST GABLE OF THE DWELLING HOUSE

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

418m
1851606CONDITIONAL18 Oct 2018

DOMESTIC GARAGE AND 1 WINDOW AT FIRST FLOOR LEVEL ON THE NORTH-EAST GABLE OF THE DWELLING HOUSE

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

469m
1750818CONDITIONAL26 May 2017

SITE EXCAVATION AND LEVELLING WORKS TO THE REAR OF DWELLING HOUSE AND PLANNING PERMISSION FOR THE CONSTRUCTION OF A DETACHED GARAGE AND STORE AND ASSOCIATED SITE WORKS

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

602m
2661202N/A30 Jun 2026

PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS AND SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION

KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL

670m
2661265N/A8 Jul 2026

A PERIOD OF 10 YEARS FOR PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION

KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL

676m
2251466N/A31 Aug 2022

(1) COMPLETION OF 10 NO. SEMI-DETACHED DWELLING HOUSES INCLUDING AMENDMENTS TO THE FRONT ELEVATION AND CONSTRUCTION OF A REAR EXTENSION TO EACH DWELLING HOUSE DESIGN (2) UPGRADING OF EXISTING ON-SITE TREATMENT SYSTEM (3) COMPLETION OF SERVICE ROAD, FOOTPATHS AND ASSOCIATED SITE DEVELOPMENT WORKS

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

676m
2251678N/A5 Oct 2022

DEVELOPMENT PREVIOUSLY APPROVED UNDER PLANNING REFERENCE NUMBERS 03/1080, 08/20133 AND 10/20376 (1) COMPLETION OF (A) 10 NO SEMI-DETACHED DWELLING HOUSES INCLUDING AMENDMENTS TO THE FRONT ELEVATION AND CONSTRUCTION OF A REAR EXTENSION TO EACH DWELLING HOUSE DESIGN (B) SERVICE ROAD, FOOTPATHS AND ASSOCIATED SITE DEVELOPMENT WORKS (2) UPGRADING OF EXISTING ON-SITE TREATMENT SYSTEM

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

754m
2660524CONDITIONAL30 Mar 2026

(1) RETENTION OF (A) 2NO. DOMESTIC GARAGES ADJACENT TO THE SOUTHWEST CORNER OF EXISTING DWELLING AND (B) STONEER CLADDING TO THE NORTHEAST ELEVATION OF EXISTING DWELLING, (2) CONSTRUCTION OF AN EXTENSION TO THE SOUTHWEST ELEVATION OF EXISTING DWELLING, (3) ALTERATION OF EXISTING DWELLING TO THE NORTHEAST ELEVATION AND (4) ALL ASSOCIATED SITEWORKS AND CONNECTION TO ALL EXISTING SERVICES

BALLYLOUGHAN , BRUCKLESS , CO. DONEGAL

768m
2462135CONDITIONAL19 Dec 2024

(1) POST OFFICE AND MINOR EXTENSIONS TO THE DEVELOPMENT AND (2) MINOR ELEVATIONAL CHANGES FROM PREVIOUS PLANNING REF. NO. 97/2708, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS AND PERMISSION FOR CHANGE OF USE FROM SUPERMARKET TO SUPERMARKET WITH ANCILLARY OFF SALES

SPAR - BRUCKLESS , BRUCKLESS , DUNKINEELY DONEGAL PO

768m
2462002N/A5 Dec 2024

(1) POST OFFICE AND MINOR EXTENSIONS TO THE DEVELOPMENT AND (2) MINOR ELEVATIONAL CHANGES FROM PREVIOUS PLANNING REF. NO. 97/2709, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS AND PERMISSION FOR CHANGE OF USE FROM SUPERMARKET TO SUPERMARKET WITH ANCILLARY OFF SALES

SPAR - BRUCKLESS , BRUCKLESS , DUNKINEELY DONEGAL PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?