1750678
CONDITIONALDonegal - Donegal County Council
Proposed Development
CHANGE OF USE FROM SHOP TO DWELLING HOUSE INCLUDING AMENDMENTS TO ELEVATIONS AND CONNECTION TO PUBLIC MAIN SERVICES
View the full application file on the council's planning portal →Application Timeline
Application received
3 May 2017
Decision: CONDITIONAL
21 Dec 2017
Decision due
5 Jan 2018
Grant issued
5 Feb 2018
Application Details
- Location
- CHAPEL STREET , STRANORLAR , LIFFORD PO
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Donegal County Council
- Site Area
- 0.2 ha
- Floor Area
- 70 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 3 May 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 December 2017
- Grant Date
- 5 February 2018
- Permission Expires
- 4 February 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF 2 NO. DWELLINGS AND CONNECTION TO EXISTING SERVICES
MAIN STREET , STRANORLAR , LIFFORD P.O.
CHANGE OF USE FROM A DWELLING HOUSE TO 2 NO. APARTMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS
CHAPEL STREET , STRANORLAR , LIFFORD PO
(1) UPSIZING OF APPROXIMATELY 130M OF 225MM SEWERS TO 300MM MINIMUM DIAMETER FROM MEETINGHOUSE LANE TO CHAPEL STREET, STRANORLAR (2) UPSIZING OF APPROXIMATELY 60M OF 225MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL STREET, STRANORLAR (3) UPSIZING OF APPROXIMATELY 55M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL CLOSE, STRANORLAR (4) UPSIZING OF APPROXIMATELY 195M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER FROM CHAPEL CLOSE TO MAIN STREET, STRANORLAR (5) UPSIZING OF APPROXIMATELY 405M OF 225/300MM SEWER TO 525MM MINIMUM DIAMETER IN MAIN ST AND WATER LANE, STRANORLAR (6) CONSTRUCTION OF NEW STORM OVERFLOW CHAMBER AT BALLYBOFEY BRIDGE INCLUDING APPROXIMATELY 8M OF 525MM MINIMUM DIAMETER OVERFLOW TO THE RIVER FINN (7) DECOMMISSIONING OF THE FOLLOWING STORM OVERFLOWS: MAIN STREET CSO AND CHAPEL CLOSE CSO (8) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
STRANORLAR , CO DONEGAL
RETENTION, ALTERATIONS AND COMPLETION OF EXISTING DETACHED DOMESTIC GARAGE AND STORE INCLUDING ANCILLARY SITE DEVELOPMENT WORKS
350 MEETING HOUSE STREET , STRANORLAR , LIFFORD PO
(1) UPSIZING OF APPROXIMATELY 130M OF 225MM SEWERS TO 300MM MINIMUM DIAMETER FROM MEETINGHOUSE LANE TO CHAPEL STREET, STRANORLAR (2) UPSIZING OF APPROXIMATELY 60M OF 225MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL STREET, STRANORLAR (3) UPSIZING OF APPROXIMATELY 55M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL CLOSE, STRANORLAR (4) UPSIZING OF APPROXIMATELY 195M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER FROM CHAPEL CLOSE TO MAIN STREET, STRANORLAR (5) UPSIZING OF APPROXIMATELY 405M OF 225/300MM SEWER TO 525MM MINIMUM DIAMETER IN MAIN ST AND WATER LANE, STRANORLAR (6) CONSTRUCTION OF NEW STORM OVERFLOW CHAMBER AT BALLYBOFEY BRIDGE INCLUDING APPROXIMATELY 8M OF 525MM MINIMUM DIAMETER OVERFLOW TO THE RIVER FINN (7) DECOMMISSIONING OF THE FOLLOWING STORM OVERFLOWS: MAIN STREET CSO AND CHAPEL CLOSE CSO (8) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
STRANORLAR , LIFFORD PO , CO DONEGAL
CHANGE OF USE FROM PERMITTED FIRST FLOOR OFFICE SPACE OVER EXISTING SHOP TO A 2 BEDROOM SELF CONTAINED APARTMENT, WORKS INCLUDES CONSTRUCTION OF A NEW ENCLOSED EXTERNAL STAIRWELL TO SERVICE THE PROPOSED APARTMENT AND ASSOCIATED SITE DEVELOPMENT WORKS
MEETINGHOUSE STREET AND POUND STREET , STRANORLAR , LIFFORD PO
DEMOLITION OF SINGLE STOREY EXTENSION TO THE SIDE ELEVATION AND CONSTRUCTION OF A 2 STOREY EXTENSION TO THE SIDE AND 2 NO. SINGLE STOREY EXTENSIONS TO THE FRONT AND REAR ELEVATIONS OF EXISTING DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS
NO. 9 ARD MCCOOL , STRANORLAR , CO. DONEGAL
CHANGE OF USE FROM CLASS 3 (LIGHT INDUSTRIAL) TO CLASS 1 (RETAIL) FOR AN EXISTING BUILDING
MEETING HOUSE STREET , STRANORLAR , CO. DONEGAL
CHANGE OF USE FROM THAT PERMITTED UNDER PLANNING REF:15/51229; FROM APPROVED RETAIL UNIT/OPTICIANS TO PROPOSED USE AS A CHEMIST SHOP
POUND STREET , STRANORLAR , LIFFORD PO
CONSTRUCTION OF EXTENSION TO THE EASTERN SIDE OF EXISTING SUPERMARKET BUILDING TO PROVIDE AN INDEPENDENT RETAIL UNIT FOR USE AS AN OPTICIANS (CLASS 8-HEALTH / MEDICAL USE). WORKS SHALL INCLUDE PART DEMOLITION OF EXISTING LOW LEVEL BLOCK WALL, SIGNAGE TO EXTERNAL ELEVATIONS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
POUND STREET , STRANOLAR , CO DONEGAL
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?