The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

1751026

REFUSED

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A DWELLING HOUSE WITH TREATMENT SYSTEM AND POLISHING FILTER

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jun 2017

  2. Decision: REFUSED

    11 Aug 2017

  3. Decision due

    24 Aug 2017

Application Details

Location
MAGHERACLOGHER , BUNBEG , LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.069 ha
Floor Area
153 sq m
Residential Units
1

Timeline

Registration Date
30 June 2017
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
11 August 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

162m
2251696N/A10 Oct 2022

CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND INSTALLATION OF A WASTE WATER TREATEMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

162m
2251906CONDITIONAL25 Nov 2022

CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND INSTALLATION OF A WASTE WATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

199m
1750904CONDITIONAL6 Jun 2017

CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE AND TREATMENT SYSTEM WITH POLISHING FILTER

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

202m
2151174CONDITIONAL15 Jun 2021

CHANGE OF HOUSE DESIGN FROM THAT PREVIOUSLY APPROVED UNDER PLANNING REF 17/50904

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

213m
2460991CONDITIONAL1 Jul 2024

CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS

MAGHERACLOGHER , BUNBEG , CO. DONEGAL

233m
1851063UNCONDITIONAL6 Jul 2018

CHANGE OF USE FOR PART OF THE EXISTING BUILDING TO A RESTAURANT AND GUEST HOUSE FACILITY, (2) EXTENSION TO EXISTING BUILDING FOR RESTAURANT USE ON GROUND FLOOR (3) 2 NEW FIRE EXITS FROM THE FIRST FLOOR AND (4) CONNECTION TO A NEW SEPTIC TANK AND SAND FILTER AREA WITH THE DECOMMISSIONING OF THE EXISTING TREATMENT SYSTEMS & ASSOCIATED SITE DEVELOPMENT WORKS

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

239m
2151694N/A25 Aug 2021

CONSTRUCTION OF 44 NO NEW BEDROOMS, RENOVATION OF EXISTING 36 NO HOTEL BEDROOMS, RENOVATION OF EXISTING BAR AND RESTAURANT, FIRST FLOOR APARTMENT OVER NEW GROUND FLOOR CAFE, DEMOLITION AND RECONSTRUCTION OF PART OF BUILDING TO REMOVE EXISTING NITECLUB, TOILET BLOCK TO FACILITATE NEW HOTEL ROOMS AND GYM. ANCILLARY CAR PARKING (94 SPACES) AND COACH SET DOWN FOR PATRONS OF THE HOTEL. ALL ASSOCAITED SITE DEVELOPMENT AND ENGINEERING WORKS INCLUDING A NEW WASTEWATER TREATMENT PLANT TO FACILITATE THE DEVELOPMENT.

SEAVIEW HOTEL , MACHAIRE CHLOCHAIR , AN BUN BEAG

241m
2151800CONDITIONAL9 Sept 2021

CONSTRUCTION OF 44 NO. NEW HOTEL BEDROOMS AND GYM WITHIN A NEW 3 STOREY BLOCK, THE CHANGE OF USE OF EXISTING STORAGE AREA AT GROUND FLOOR LEVEL IN THE EXISTING 3 STOREY BLOCK TO THE REAR OF THE SITE TO PROVIDE OF 8 NO. ADDITIONAL BEDROOMS AT GROUND FLOOR LEVEL (52 NO. NEW BEDROOMS OVERALL), THE EXISTING 28 NO. HOTEL BEDROOMS ARE TO BE RENOVATED CREATING A TOTAL OF 80 NO. BEDROOMS. IT IS PROPOSED TO PROVIDE 2 NO. 2 STOREY EXTENSIONS TO THE FRONT OF THE STREET FACADE (WEST ELEVATION FRONTING THE R257) OF THE EXISTING HOTEL BAR AND RESTAURANT TO PROVIDE A CAFE AND ADDITIONAL RESTAURANT AREA AT GROUND FLOOR LEVEL AND THE CONSTRUCTION OF 2 NO. FIRST FLOOR APARTMENTS. IT IS ALSO PROPOSED TO CARRY OUT INTERNAL ALTERATIONS TO THE RESTAURANT, RECEPTION AREA, NEW TOILETS AND PLANT ROOMS AND DEMOLITION OF PART OF THE BUILDING TO REMOVE THE EXISTING NIGHTCLUB AND TOILET BLOCK TO FACILITATE THE NEW HOTEL ROOMS AND GYM. ANCILLARY CAR PARKING (94 CAR SPACES) AND COACH SET DOWN FOR PATRONS OF THE HOTEL, AND ALL ASSOCIATED SITE DEVELOPMENT AND ENGINEERING WORKS INCLUDING A NEW WASTEWATER TREATMENT PLANT NECESSARY TO FACILITATE THE DEVELOPMENT.

SEAVIEW HOTEL , MACHAIRE CHLOCHAIR , AN BUN BEAG

254m
2250957N/A3 Jun 2022

CONSTRUCTION OF AN EXTENSION TO THE REAR OF THE EXISTING RESTAURANT FOR A STORE AND AN EXTENDED KITCHEN AREA

MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO

255m
2251110CONDITIONAL29 Jun 2022

CONSTRUCTION OF AN EXTENSION TO THE REAR OF THE EXISTING RESTAURANT FOR A STORE AND AN EXTENDED KITCHEN AREA

MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?