1751465

REFUSED

Donegal - Donegal County Council

Proposed Development

CHANGE OF HOUSE DESIGN FROM THAT GRANTED PREVIOUSLY UNDER PLANNING REF: 07/20850 AND ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Sept 2017

  2. Decision: REFUSED

    10 Nov 2017

  3. Decision due

    21 Nov 2017

Application Details

Location
MEENYHOOGAN , KILLYBEGS , DONEGAL P.O.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.85 ha
Floor Area
246.9 sq m
Residential Units
1

Timeline

Registration Date
27 September 2017
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
10 November 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
2251377N/A15 Aug 2022

REVISED RIDGE HEIGHT AND FLOOR LEVEL, ALTERNATIVE ELEVATIONAL DETAIL AND FENESTRATION TREATMENT WITH A HIPPED ROOF ON SINGLE STOREY ELEMENT FROM THAT GRANTED UNDER PLANNING REF: 07/20850

MEENYHOOGAN , KILLYBEGS , DONEGAL PO

8m
2350635CONDITIONAL10 May 2023

REVISED RIDGE HEIGHT AND FLOOR LEVEL, ALTERNATIVE ELEVATIONAL DETAIL AND FENESTRATION TREATMENT WITH A HIPPED ROOF ON SINGLE STOREY ELEMENT FROM THAT GRANTED UNDER PLANNING REF: 07/20850

MEENYHOOGAN , KILLYBEGS , DONEGAL PO

9m
1950635N/A3 May 2019

ERECTION OF SHEEPWIRE FENCING AND ASSOCIATED SITE WORKS IN A SPECIAL CONSERVATION AREA. THE APPLICATION INCLUDES A NATURA IMPACT STATEMENT

MEENACURRIN , GLENCOLMCILLE , DONEGAL PO

13m
2250402REFUSED8 Mar 2022

REVISED RIDGE HEIGHT AND FLOOR LEVEL, ALTERNATIVE ELEVATIONAL DETAILS AND FENESTRATION TREATMENT WITH A HIPPED ROOF ON SINGLE STOREY ELEMENT FROM THAT GRANTED UNDER PLANNING REF: 07/20850

MEENYHOOGAN , KILLYBEGS , DONEGAL PO

786m
2461515CONDITIONAL25 Sept 2024

CONSTRUCTION OF A DRY SHEEP SHED AND MACHINERY STORAGE SHED WITH SEEPAGE TANK AND ASSOCIATED SITE WORKS

MEENYHOOGHAN , KILLYBEGS , DONEGAL PO

787m
1751923CONDITIONAL21 Dec 2017

A TEN YEAR DURATION FOR THE UPGRADING OF THE EXISTING WATER TREATMENT PLANT TO AN INCREASED CAPACITY OF 7,400 M3/DAY AS PART OF IMPROVEMENTS TO THE REGIONAL WATER SUPPLY SCHEME. (PREVIOUS PLANNING PERMISSION 17/50164 REFERS) CONSISTING OF (1) CONSTRUCTION OF AN EXTENSION TO THE FILTER GALLERY IN THE EXISTING WATER TREATMENT PLANT BUILDING, (2) CONSTRUCTION OF AN IMPROVED SLUDGE PROCESSING SYSTEM INCLUDING REMOVAL AND REPLACEMENT OF EXISTING TANKS, (3) DEMOLITION OF THE EXISTING SLUDGE PRESS BUILDING AND CONSTRUCTION OF A NEW SLUDGE PRESS BUILDING, (4) CONSTRUCTION OF A NEW BUILDING TO ACCOMMODATE EXISTING AND PROPOSED CHEMICAL STORAGE UNITS, (5) CONSTRUCTION OF NEW WASH-WATER RECOVERY SYSTEM INCLUDING REMOVAL AND REPLACEMENT OF EXISTING TANKS, (6) CONSTRUCTION OF A NEW ESB SUBSTATION, (7) CONSTRUCTION OF NEW UNDERGROUND TREATED WATER CONTACT TANK AND TREATED WATER STORAGE RESERVOIR AND (8) THE PROVISION OF TEMPORARY PROCESS UNITS TO FACILITATE CONSTRUCTION OF THE NEW WORKS, TOGETHER WITH SERVICE CONNECTIONS, IMPROVEMENT TO BOUNDARIES, LANDSCAPING AND ALL ASSOCIATED SITE WORKS

EXISTING KILLYBEGS WATER TREATMENT PLANT , DRUMBARITY TD , KILLYBEGS

787m
1750164CONDITIONAL7 Feb 2017

A TEN YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING KILLYBEGS WATER TREATMENT PLANT. THE DEVELOPMENT WILL CONSIST OF UPGRADING THE EXISTING WATER TREATMENT PLANT TO AN INCREASED CAPACITY OF 11,850 M3/DAY AS PART OF IMPROVEMENTS TO THE REGIONAL WATER SUPPLY SCHEME. THE DEVELOPMENT WILL COMPRISE THE FOLLOWING: CONSTRUCTION OF AN EXTENSION TO THE FILTER GALLERY IN THE EXISTING WATER TREATMENT PLANT BUILDING, CONSTRUCTION OF A NEW BUILDING TO ACCOMMODATE EXISTING AND PROPOSED WATER TREATMENT PROCESSING UNITS, CONSTRUCTION OF AN IMPROVED SLUDGE PROCESSING SYSTEM INCLUDING REMOVAL AND REPLACEMENT OF EXISTING TANKS, DEMOLITION OF THE EXISTING SLUDGE PRESS BUILDING AND CONSTRUCTION OF A NEW SLUDGE PRESS BUILDING, CONSTRUCTION OF A NEW BUILDING TO ACCOMMODATE EXISTING AND PROPOSED CHEMICAL STORAGE UNITS, CONSTRUCTION OF NEW WASH WATER RECOVERY SYSTEM INCLUDING REMOVAL AND REPLACEMENT OF EXISTING TANKS, CONSTRUCTION OF NEW ESB SUBSTATION, CONSTRUCTION OF NEW UNDERGROUND TREATED WATER CONTACT TANK AND TREATED WATER STORAGE RESERVOIR, TOGETHER WITH SERVICE CONNECTIONS, IMPROVEMENT TO BOUNDARIES, LANDSCAPING AND ALL ASSOCIATED SITE WORKS

DRUMBARITY TD , KILLYBEGS , DONEGAL PO

796m
1850640N/A25 Apr 2018

CONSTRUCTION OF A DWELLING HOUSE, PROPRIETARY WASTE WATER TREATMENT SYSTEM & PERCOLATION AREA AND ASSOCIATED SITE WORKS

CROAGHLIN , KILLYBEGS , DONEGAL PO

833m
2151823CONDITIONAL14 Sept 2021

CONSTRUCTION OF A NEW DWELLING HOUSE, PROPRIETARY WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKS

CROAGHLIN , KILLYBEGS , DONEGAL PO

861m
1750377UNCONDITIONAL14 Mar 2017

ERECTION OF A TWO STORIED TYPE DWELLING HOUSE WITH SEPTIC TANK AND PERCOLATION AREA, DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS

CUNLIN , KILLYBEGS , DONEGAL PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?