1751624

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

THE DEVELOPMENT OF AN ALL WEATHER SURFACE PITCH. PROPOSED WORKS INCLUDE ASSOCIATED LIGHTING, PERIMETER FENCING, UNDERGROUND DRAINAGE AND ALL SITE DEVELOPMENT AND ANCILLARY WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Oct 2017

  2. Decision: CONDITIONAL

    8 Dec 2017

  3. Decision due

    19 Dec 2017

  4. Grant issued

    22 Jan 2018

Application Details

Location
DRUMBOE LOWER , BALLYBOFEY , LIFFORD P.O.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
2.372 ha

Timeline

Registration Date
25 October 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 December 2017
Grant Date
22 January 2018
Permission Expires
21 January 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
2250598CONDITIONAL7 Apr 2022

(1) DEMOLITION OF PART OF EXISTING BUILDINGS AND EXISTING PREFABRICATED STRUCTURES TOTALLING 3,510 SQ METRES, THE REFURBISHMENT OF EXISTING RETAINED BUILDING OF 3464 SQ METRES (2) CONSTRUCTION OF A NEW EXTENSION BLOCK OF 7024 SQ METRES CONSISTING OF A NEW MAIN ENTRANCE; 8 NO. GENERAL CLASSROOMS, 18 NO. SPECIALIST CLASSROOMS AND ASSOCIATED PREPARATION AREAS; GENERAL PURPOSE ROOM AND ANCILLARIES; MULTI-USE (PE) HALL AND ANCILLARY SPACES, SPECIAL NEEDS EDUCATION SUITE, LIBRARY, STAFF ROOM; ADMINISTRATIVE SPACES; TOILETS; STORES; PLANT ROOMS; CIRCULATION; EXTERNAL STORE AND COVERED YARD. THE DEVELOPMENT WILL ALSO INCLUDE ALL ASSOCIATED SITE WORKS; REALIGNMENT AND RESURFACING OF EXISITNG DRIVEWAY SET DOWN AND STAFF/VISITOR PARKING AREAS, NEW ACCESS ROAD, NEW COURTYARDS AND PEDESTRIAN PATHS, PROVISION OF BUS TURNING BAY; NEW EXTERNAL PLAY AREAS; NEW HARD AND SOFT LANDSCAPING; NEW SITE BOUNDARIES FENCING AND GATES; UPGRADING AND REROUTING OF OVERHEAD AND UNDERGROUND SERVICES CONNECTED TO PUBLIC NETWORKS, STORM ATTENUATION AND RAIN HARVESTING, NEW PUBLIC LIGHTING AND SIGNAGE (3) ERECTION OF TEMPORARY CLASSROOM ACCOMMODATION OF 130 SQ METRES TO BE LOCATED ON SITE FOR THE DURATION OF WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

ST COLUMBAS COLLEGE , DRUMBOE AVENUE , LIFFORD PO

45m
2460474CONDITIONAL8 Apr 2024

PROVISION OF FLOOD LIGHTING TO THE EXISTING GRASS SPORTS PITCH WHICH WILL INCLUDE THE ERECTION OF 6 NO. 12M HIGH LIGHTING POLES WITH ASSOCIATED POWER DISTRIBUTION DUCTING, SWITCHGEAR AND SITE WORKS

ST COLUMBA'S COLLEGE , DRUMBOE AVENUE , STRANORLAR

106m
1951015CONDITIONAL1 Jul 2019

CONSTRUCTION OF A DETATCHED DOMESTIC GARAGE WITH CAR PORT AND ASSOCIATED SITE DEVELOPMENT WORKS

MAIN STREET , STRANORLAR , LIFFORD PO

125m
2560917CONDITIONAL4 Jun 2025

CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO EXISTING PUBLIC SEWER, DOMESTIC GARAGE WITH INTEGRATED HOME OFFICE AND GYM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

MAIN STREET , STRANORLAR , LIFFORD PO

131m
2050839CONDITIONAL29 Jun 2020

(1) DEMOLITION OF EXISTING DETACHED STORE AND OUTBUILDINGS (2) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE, CONNECTION TO PUBLIC MAIN SEWER (3) CLOSE EXISTING VEHICULAR ENTRANCE AND PROVIDE A REPLACEMENT/RELOCATED ENTRANCE TO THE NORTH WESTERN SIDE OF THE PROPERTY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE PROPOSAL WILL REQUIRE THE CARRYING OUT OF WORKS TO A PROTECTED STRUCTURE; RPS REG NUMBER 40838025

DRUMBOE AVENUE , STRANORLAR , LIFFORD PO

131m
2050800N/A19 Jun 2020

(1) DEMOLITION OF EXISTING DETACHED STORE AND OUTBUILDINGS (2) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE, CONNECTION TO PUBLIC MAIN SEWER (3) CLOSE EXISTING VEHICULAR ENTRANCE AND PROVIDE A REPLACEMENT/RELOCATED ENTRANCE TO THE NORTH WESTERN SIDE OF THE PROPERTY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

DRUMBOE AVENUE , STRANORLAR , LIFFORD PO

132m
1750560REFUSED13 Apr 2017

(A) DECOMMISSIONING AND REMOVAL OF THE EXISTING SEPTIC TANK SERVING EXISTING DWELLING AND A NEW CONNECTION FROM THE EXISTING DWELLING INTO EXISTING PUBLIC FOUL SEWER (B) CONSTRUCTION OF A NEW DETACHED DWELLING WITH CONNECTION INTO EXISTING PUBLIC FOUL SEWER AND ALL ASSOCIATED SITE WORKS

DRUMBOE AVENUE , STRANORLAR , LIFFORD PO

137m
1851890CONDITIONAL14 Dec 2018

DOMESTIC USE OF THE EXISTING GARAGE, SHED AND OUTHOUSE LOCATED TO THE REAR

STONEYLEA , DRUMBOE AVENUE , STRANORLAR

160m
2051636CONDITIONAL3 Nov 2020

(1) UPSIZING OF APPROXIMATELY 130M OF 225MM SEWERS TO 300MM MINIMUM DIAMETER FROM MEETINGHOUSE LANE TO CHAPEL STREET, STRANORLAR (2) UPSIZING OF APPROXIMATELY 60M OF 225MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL STREET, STRANORLAR (3) UPSIZING OF APPROXIMATELY 55M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL CLOSE, STRANORLAR (4) UPSIZING OF APPROXIMATELY 195M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER FROM CHAPEL CLOSE TO MAIN STREET, STRANORLAR (5) UPSIZING OF APPROXIMATELY 405M OF 225/300MM SEWER TO 525MM MINIMUM DIAMETER IN MAIN ST AND WATER LANE, STRANORLAR (6) CONSTRUCTION OF NEW STORM OVERFLOW CHAMBER AT BALLYBOFEY BRIDGE INCLUDING APPROXIMATELY 8M OF 525MM MINIMUM DIAMETER OVERFLOW TO THE RIVER FINN (7) DECOMMISSIONING OF THE FOLLOWING STORM OVERFLOWS: MAIN STREET CSO AND CHAPEL CLOSE CSO (8) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

STRANORLAR , LIFFORD PO , CO DONEGAL

160m
2051275N/A11 Sept 2020

(1) UPSIZING OF APPROXIMATELY 130M OF 225MM SEWERS TO 300MM MINIMUM DIAMETER FROM MEETINGHOUSE LANE TO CHAPEL STREET, STRANORLAR (2) UPSIZING OF APPROXIMATELY 60M OF 225MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL STREET, STRANORLAR (3) UPSIZING OF APPROXIMATELY 55M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER IN CHAPEL CLOSE, STRANORLAR (4) UPSIZING OF APPROXIMATELY 195M OF 225/300MM SEWER TO 375MM MINIMUM DIAMETER FROM CHAPEL CLOSE TO MAIN STREET, STRANORLAR (5) UPSIZING OF APPROXIMATELY 405M OF 225/300MM SEWER TO 525MM MINIMUM DIAMETER IN MAIN ST AND WATER LANE, STRANORLAR (6) CONSTRUCTION OF NEW STORM OVERFLOW CHAMBER AT BALLYBOFEY BRIDGE INCLUDING APPROXIMATELY 8M OF 525MM MINIMUM DIAMETER OVERFLOW TO THE RIVER FINN (7) DECOMMISSIONING OF THE FOLLOWING STORM OVERFLOWS: MAIN STREET CSO AND CHAPEL CLOSE CSO (8) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

STRANORLAR , CO DONEGAL