The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

1751844

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF (A) A FRONT PORCH EXTENSION, (B) A REAR EXTENSION TO PROVIDE BEDROOM AND BATHROOM ACCOMMODATION AND (C) THE INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND SAND POLISHING FILTER TO DWELLING

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Dec 2017

  2. Decision: CONDITIONAL

    25 Jan 2018

  3. Decision due

    7 Feb 2018

  4. Grant issued

    27 Feb 2018

Application Details

Location
CRAGHY , DUNGLOE , LETTERKENNY P.O.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
2.82 ha

Timeline

Registration Date
5 December 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 January 2018
Grant Date
27 February 2018
Permission Expires
26 February 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

363m
2660425CONDITIONAL16 Mar 2026

REFURBISHMENT, CONSTRUCTION OF EXTENSION AND ALTERATIONS TO EXISTING DWELLING INCLUDING ALL ASSOCIATED SITE WORKS

CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO

601m
1850129N/A1 Feb 2018

ERECTION OF A DWELLING HOUSE WITH TREATMENT PLANT AND POLISHING UNIT INCLUDING ALL ASSOCIATED SITE WORKS

CROAGHNASHALLOG , DUNGLOE , LETTERKENNY P.O.

602m
1850205CONDITIONAL13 Feb 2018

ERECTION OF A DWELLING HOUSE WITH TREATMENT PLANT AND POLISHING UNIT INCLUDING ALL ASSOCIATED SITE WORKS

CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO

626m
2350056CONDITIONAL25 Jan 2023

CONSTRUCTION OF A SHED AND A GARDEN ROOM INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

CRAGHY , DUNGLOE , LETTERKENNY PO

694m
2151708CONDITIONAL26 Aug 2021

ENTRANCE & DRIVEWAY SERVING EXISTING DWELLING

CROAGHNASHALLOG , DUNGLOE , CO DONEGAL

1.0km
2561652N/A24 Sept 2025

10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACKS, AND ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)

CROAGHNASHALLOG , DONEGAL PO , CO. DONEGAL

1.1km
2350815N/A8 Jun 2023

ERECTION OF A DWELLING HOUSE WITH TREATMENT SYSTEM AND SOIL POLISHING UNIT INCLUDING ALL ASSOCIATED SITE WORKS

CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO

1.1km
2660660N/A16 Apr 2026

10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

CROAGHNASHALLOG , DUNGLE , LETTERKENNY PO

1.1km
2660692N/A21 Apr 2026

10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO

1.2km
2051332CONDITIONAL21 Sept 2020

ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND WORKS TO CONNECT THE EXISTING DWELLING HOUSE GRANTED UNDER PLANNING REF NO. 92/927 TO THIS PROPOSED WASTEWATER TREATMENT SYSTEM

DUNGLOW , DUNGLOE , LETTERKENNY PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?