The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

17521

REFUSED

Cavan - Cavan County Council

Proposed Development

to construct new entrance walls, piers, and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Dec 2017

  2. Decision: REFUSED

    9 Feb 2018

  3. Decision due

    15 Feb 2018

Application Details

Location
Fortland , Mountnugent , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
13 December 2017
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
9 February 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
17361CONDITIONAL18 Aug 2017

to decommission and relocate the existing septic tank as constructed under PL64/7401 and permission to construct a new sewage treatment plant and percolation area within the boundary of my existing site and attached ancillary site works

Fortland , Mountnugent , Co. Cavan

1m
21682CONDITIONAL10 Nov 2021

for alterations & dormer extension to side elevation of the existing dwelling to include entrance hall, utility room, toilet, kitchen, pantry, dining, living area and at first floor, a bedroom, dressing and bathroom

Fortland , Mountnugent , Co Cavan

486m
2660212CONDITIONAL28 Apr 2026

to construct a two-storey dwelling, a single storey detached domestic garage and install propriety sewage treatment unit and percolation area, together with all associated site works, at Fortland, Mount Nugent, Co. Cavan, on behalf of Orna Cassells. A Natura Impact Statement will be submitted to the Planning authority with the application

Fortland , Mountnugent , County Cavan

557m
22523CONDITIONAL21 Dec 2022

erect prefabricated machinery storage shed and associated site works

Crover , Mountnugent , Co Cavan

652m
2320CONDITIONAL24 Jan 2023

for the erection of a single storey extension to the rear of existing hotel to include store room, office and new toilets and all associated site works

Crover House Hotel , Crover , Mountnugent

689m
2660375N/A1 Jul 2026

for (a) The removal of existing 2 storey log cabin (b) construction of a new replacement 2 storey cabin utilizing the same footprint and constructed on the existing concrete slab and foundations (c) Decommissioning of existing septic tank system, installation of a pumping chamber and connection to existing sewage treatment system serving the hotel (d) together with all associated site works

Crover , Mountnugent , Co. Cavan

777m
21664CONDITIONAL3 Nov 2021

to construct a dwelling house and domestic garage, waste water treatment system and percolation area, entrance and ancillary site services and development works

Fortland , Kilnaleck , Co Cavan

855m
2660327N/A10 Jun 2026

for RETENTION Permission of (1) construction of two storey extension to rear of existing two storey dwelling and elevation alterations to works to the rear of the existing two storey dwelling (2) all associated site development works

Turin , Mountnugent , Co. Cavan

864m
17338CONDITIONAL26 Jul 2017

for (a) the removal of an existing porch to the south elevation (b) the construction of a two storey extension to "Lake View" bar on the south elevation (c) the construction of a single storey extension to the Main Entrance on south elevation (d) alteration to existing carpark layout with all associated site works

Crover House Hotel , Crover , Mountnugent

868m
17551CONDITIONAL22 Dec 2017

to retain and complete single storey kitchen extension to the rear of hotel together with all associated site works

Crover House Hotel , Mountnugent , Co. Cavan

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?