Proposed Development
to RETAIN the changes to the original cottage and for PERMISSION to alter the fenestration to the first floor windows
View the full application file on the council's planning portal →Application Timeline
Application received
6 Jul 2017
Decision: CONDITIONAL
22 Aug 2017
Decision due
30 Aug 2017
Grant issued
22 Sept 2017
Application Details
- Location
- Fahanlunaghtamor , Fahamor , Miltown Malbay
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 6 July 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 August 2017
- Grant Date
- 22 September 2017
- Permission Expires
- 21 September 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to restore existing dwelling and construct a new single storey extension to the rear, to install a waste water treatment system, construct a driveway and all ancillary works
Fahanlunaghtamore , Miltown Malbay , Co. Clare
to build a machinery shed and yard
Island Baun , Lahinch , Co. Clare
to construct a dwelling house, entrance, driveway, wastewater treatment system and all associated site works
Knockacarn , Miltown Malbay , Co. Clare
to demolish existing shed and construct new cattle holding shed, construct extension to slatted cattle holding shed, consisting of calving shed, provide for storm water control from public road and within farm yard and ancillary works
Lackamore , Lahinch , Co. Clare
to RETAIN the bathroom extension to the rear of the dwelling house
Knockatullaghaun , Miltown Malbay , Co. Clare
to renovate and extend existing dwelling house, upgrade wastewater treatment system, upgrade existing entrance and all associated site works
Lackamore , Lahinch , Co. Clare
to construct an extension to the existing house and associated site works.
Knockacarron , Miltown Malbay , Co Clare
to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
Clooneyogan South , Moy , Lahinch Co Clare
for development to construct a single storey dwelling, semi-detached garage and new entrance to include indigenous landscaping, wastewater treatment system and polishing filter, connect to group water scheme and all associated site works
Knockacarron , Miltown Malbay , Co. Clare
for a ten-year planning PERMISSION for the construction of a renewable energy development at this site, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Tooreen, Silverhill, Doonsallagh East and Knockalassa, Co. Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: 1. 8 No. wind turbines with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum; 2. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning; 3. A Meteorological Mast with a height of 30 metres; 4. All associated underground electrical cabling (33kV) connecting the proposed turbines via Ring Main Unit (RMU) to the 110kV substation in the townland of Knockalassa; 5. Permanent extension to the 110kV substation at Knockalassa comprising extension to the existing substation compound, provision of a new control building with welfare facilities and all associated electrical plant and equipment for an additional 110kV bay and security fencing; 6. Upgrade of access junctions; 7. Upgrade of existing tracks/roads and provision of new site access roads and hardstand areas; 8. 2 no. borrow pits; 9. 2 no. temporary construction compounds; 10. Site Drainage; 11. Forestry Felling; 12. Operational stage site signage; and 13. All associated site development ancillary works and apparatus. The Proposed Development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten-year planning permission. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
Glendine North Fahanlunaghta More Curraghodea , Letterkelly Cloghaun More Tooreen Silverhill , Doonsallagh East and Knockalassa Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?