17545
CONDITIONALMayo - Mayo County Council
Proposed Development
CONSTRUCT TO THE NORTH WEST OF THE SITE, CLASSROOM 78SQM, CLASSROOM STORE 8.55SQM, CLEANERS STORE , RESOURCE ROOM 12SQM, WITHDRAWAL ROOM 12.98SQM, 2 TOILETS TO THE REAR OF EXISTING CLASS ROOM. LINK CORRIDOR ALONG WITH INTERNAL CHANGES TO PROVIDE ACCESS TO PROPOSED AREA BEING EXTENDED ALONG WITH ANY OTHER ANCILLARY SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
11 Jul 2017
Further information requested
31 Aug 2017
Further information received
26 Oct 2017
Decision: CONDITIONAL
20 Nov 2017
Decision due
22 Nov 2017
Grant issued
2 Jan 2018
Application Details
- Location
- BEHY MORE , BALLINA
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
Timeline
- Registration Date
- 11 July 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 20 November 2017
- Grant Date
- 2 January 2018
- Permission Expires
- 1 January 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
PHASE 1. GROUND FLOOR CLASSROOM 78SQM, CLASSROOM STORE 10.1 SQM, CLEANERS STORE 6.27 SQM, COMMS ROOM 4.4 SQM ACCESS HALLWAY 31.32 SQM WITH HOLLOWCORE CEILING SLAB AND WEATHERED WITH BUTYAL RUBBER TYPE CONSTRUCTION ALONG WITH CHANGES TO EXISTING STAIRWELL, EXITS, INSTALLATION OF PASSENGER LIFT AND INSTALLATION OF NEW CORNER WINDOW TO EXISTING CLASS ROOM NO. 4 ALONG WTIH INTERNAL CHANGES TO PROVIDE ACCESS TO THE PROPOSED AREA BEING EXTENDED AND ANY OTHER ANCILLARY SITE WORKS. PHASE NO. 2 FIRST FLOOR LEVEL. REMOVE PHASE ONE BUTYL MEMBRANE AND CONSTRUCT FIRST FLOOR CLASSROOM 78 SQM, CLASSROOM STORE 12.83 SQM, STORE ROOM 7.48S QM, RESOURCE ROOM 16.98 SQM, TOILET 3.3 SQM, ACCESS HALLWAY 27.08 SQM ALONG WITH ASSOCIATED WORKS
BEHY MORE , BALLINA , CO. MAYO
Construction of a Biodiversity Walkway with Accompanying Carpark along with all other Ancillary Site Works.
Quignashee , Ballina , Co. Mayo
The existing circuit is located in the townlands of Gorteen, Ardoughan, Kilemoremoy, Belleek, Ballina, Quignalecka, Quignashee, Ballyholan, Behy More, Corimla South, Carrownlabaun, Bunnyconnellan West, Rathreedaun, Drumsheen and Bunnyconnellan East, Co. Mayo. The proposed development will consist of: (i) The replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection. (ii) The replacement of 20 no. of the 63 no. existing Intermediate Polesets (IMPs) with similar polesets. Any replacement polesets will be constructed at, or immediately adjacent to the existing structures that they will replace, will be along the same alignment as the existing line, with a height difference of between 1-2 metres, with the exception of IMP52 where the height difference will be 4 metres. (iii) The relocation of IMP49 on the Behy Road (townland of Ballyholan), to be replaced with 2 no. new polesets (IMP49 and IMP49A) to the east and west of the existing poleset, along the route of the existing line. (iv) The replacement of 3 of the 13 no. existing steel towers (angle masts) with similar structures. (v) The carrying out of civil works for tower foundation strengthening at 3 no. locations and monopole-foundation strengthening at 1 no. location and bar member replacement works at 3 no. locations. (vi) The replacement of hardware and fittings at all locations. (vii) The replacement of crossarms at 20 no. locations. (viii) All associated works within the existing Glenree and Moy substations to accommodate the uprated 110kV overhead line. (ix) Other temporary associated and ancillary development works required for the purpose of the uprate, including construction compounds, the installation of silt traps, silt fences, access tracks, ground protection mats and temporary watercourse crossings. (x) All associated site development works above and below the ground to gain access to the existing structures including vegetation clearance, remedial works on concrete shear blocks, replacement of individual tower members and bolts, replacement of hardware and insulators, replacement of dampers, installation of line identification and danger notices and anti-climbing guards, the provision of temporary access routes and other ancillary works necessary to facilitate the proposed development. The planning application is accompanied by a Natura Impact Statement.
Townlands of Gorteen Ardoughan Kilemoremoy Belleek Ballina Quignalecka Quignashee Ballyholan Behy More Corimla South Carrownlabaun Bunnyconnellan West Rathreedaun Drumsheen and Bunnyconnellan East Co. Mayo , County , Mayo
RENOVATION & EXTENSION OF EXISTING DWELLING HOUSE WITH SIGNIFICANT ALTERATIONS TO ALL ELEVATIONS, CONSTRUCTION OF SINGLE STOREY EXTENSIONS, TO THE WEST, NORTH AND SOUTH ELEVATIONS OF THE EXISTING DWELLING AND PROPOSED EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA DN ALL ASSOCIATED SITE WORKS.
QUIGNASHEE , BEHY , BALLINA
CONSTRUCT DWELLING HOUSE WITH DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS
CORIMLA SOUTH , BALLINA
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS
BEHY MORE , BALLINA
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS
BEHY MORE , BALLINA
RETENTION FOR CHANGE OF POSITION OF DWELLING AND DOMESTIC GARAGE AND AMENDMENT TO SITE BOUNDARIES.
BALLYHOLAN , BALLINA
RETENTION FOR CHANGE OF POSITION OF DWELLING AND DOMESTIC GARAGE AND AMENDMENT TO SITE BOUNDARIES.
BALLYHOLAN , BALLINA
FILLING OF LAND WITH INERT SOIL AND SUBSOIL, APPROXIMATE AREA OF 12000SQM TO AN AVERAGE DEPTH OF 1.2M. LEVEL AND RESEED THE SITE ON COMPLETION OF THE FILL. CARRY OUT ALL ANCILLARY SITE WORKS.
BALLYHOLAN , BALLINA
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?