175823
UNCONDITIONALCork - Cork City Council
Proposed Development
Dwellinghouse and all associated site works - Extension of Duration of Permission granted under Planning Reg. No. 12/4994
View the full application file on the council's planning portal →Application Timeline
Application received
17 Jul 2017
Decision: UNCONDITIONAL
1 Sept 2017
Decision due
11 Sept 2017
Application Details
- Location
- Kilnamucky , Tower , Blarney
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 17 July 2017
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision Date
- 1 September 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the construction of a single-storey residential dwelling and all associated site development works including the construction of a wastewater treatment system at St. Ann's Hill, Kilnamucky (townland), Tower, Blarney, Cork. The proposed development will be accessed via a new private entrance to the west of the site. The proposed development is within the curtilage of Protected Structure St. Ann's Hydropathic Establishment Ref. No. PS1168.
St. Anns Hill , Kilnamucky (Townland) , Tower Blarney
Permission for the construction of a single storey residential dwelling, adjusted site boundaries and waste water treatment unit and all associated site works ( Previously permitted under Planning reference 23/42079) at St. Anns Hill, Kilnamucky (townland), Tower, Blarney, Cork. The proposed development will be accessed via a new private entrance to the west of the site. The proposed development is within the curtilage of Protected Structure St. Ann's Hydropathic Establishment Ref. No. PS1168.
Saint Anns Hill , Kilnamucky (townland) , Tower Blarney
Permission for the construction of a single storey dwelling and all associated development site works at St. Ann's Hill, Kilnamucky, Tower, Blarney, Cork. The proposed development will be accessed via an existing private laneway.
St. Anns Hill , Kilnamucky , Tower
Demolition of the existing shed and to construct 2 no. dwellings for short term/holiday letting, including proprietary treatment unit and polishing filter for each dwelling and associated site works
Kilnamucky , Tower , Blarney
Permission for development at this site at Saint Ann's Hill, Kilnamucky (Townland), Tower, Blarney, Cork, which will consist of design changes to the residential dwelling permitted under application register reference 2342080 to comprise changes to floorplans and elevations, new attic space, an increase in floor area and all other associated site works. Servicing and access arrangements will remain as permitted. The proposed development is within the curtilage of Protected Structure St. Ann's Hydropathic Establishment Ref. No. PS1168.
Saint Anns Hill , Kilnamucky (townland) , Tower Blarney
Permission for the construction of a single-storey residential dwelling and all associated site development works including the construction of a wastewater treatment system at St. Ann's Hill, Kilnamucky (Townland), Tower, Blarney, Cork. The proposed development will be accessed via a new private entrance on St. Ann's Hill to the northeast of the site. The proposed development is within the curtilage of Protected Structure St. Ann's Hydropathic Establishment Ref. No. PS1168.
St. Anns Hill , Kilnamucky (Townland) , Tower
Construct a residential development of 7 no. detached 2-storey dwelling houses and all ancillary site development works. Access to the proposed development works. Access to the proposed development will be via an entrance from R617
Kilnamucky , Tower , Co. Cork
Permission for the construction of 5 no. dwelling houses on lands associated with the former St. Ann's Hydropathic Establishment, St. Ann's Hill, Kilnamucky, Tower, Blarney, Cork. The development will consist of the construction of 4 no. 4 bedroom detached dwelling houses and 1 no. 5 bedroom detached dwelling house. The proposed development is a change of plan from that originally permitted under Cork County Council Planning Reference 18/7111 and is located within the curtilage of lands associated with the former St. Ann's Hydropathic Establishment (St. Ann's Hydro) which is a Protected Structure RPS ref. no: PS1168. The development will result in the construction of an additional dwelling house. Access to the proposed development will be provided via the permitted access off the R617 road and internal road network. The development will also include all ancillary works necessary to facilitate the development. The
Lands asssociated with the , Former St. Anns Hydropathic Establishment , St. Anns Hill Kilnamucky
The construction of a nursing home and residential development 29 no. detached houses and all ancillary site works on the site of the former St. Ann’s Hydropathic Establishment. The proposed development makes provision for the partial demolition, conservation, refurbishment, alteration and change of use of the remains of the former St. Ann’s Hydropathic Establishment which is a Protected Structure (RPS 00815) to facilitate its integration into the proposed 2-storey nursing home which will provide for 120 no. bed spaces and ancillary offices, meeting rooms, staff facilities, kitchen/restaurant, nurse stations, morgue, laundry facilities, communal lounge and the refurbishment of the former belfry tower structure. The proposed development will also include 29 no. detached houses consisting of 26 no. single storey 3-bedroom detached houses and 3 no. 2-storey, 4-bedroom detached houses. Access to the proposed development will be via a new entrance and access road from the R617 and ancillary site works will include provision of surface parking associated with the proposed nursing home, pedestrian walkways and landscaping.
Site of the former St. Ann's Hydropathic Est. , St. Ann's Hill , Kilnamucky
Construction of a nursing home, 29 no. detached houses and all ancillary site works on the site of the former St. Ann’s Hydropathic Establishment. The proposed development makes provision for the partial demolition, conservation, refurbishment, alteration and change of use of the remains of the former St. Ann’s Hydropathic Establishment which is a Protected Structure (RPS 00815) to facilitate its integration into the proposed 2-storey nursing home which will provide for 120 no. bed spaces and ancillary offices, meeting rooms, staff facilities, kitchen/restaurant, nurse stations, morgue, laundry facilities, communal lounge and the refurbishment of the former belfry tower structure. The proposed development will also include 29 no. detached houses consisting houses consisting of 26 no. single storey 3-bedroom detached houses and 3 no. 2-storey, 4- bedroom detached houses. Access to the proposed development will be via a new entrance and access road from the R617 and ancillary site works will include provision of surface parking associated with the proposed nursing home, pedestrian walkways and landscaping.
St. Ann's Hill , Kilnamucky , Tower Blarney
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?