The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

17600441

N/A

Tipperary - Tipperary County Council

Proposed Development

dwellinghouse, garage, waste water treatment system, entrance, driveway along with all ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
Kilmore , Capparoe , Nenagh
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
28 April 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
17601441CONDITIONAL22 Dec 2017

dwellinghouse, garage, waste water treatment system, entrance, driveway along with all ancillary site works (Outline Planning Permission Ref No 17600614)

Kilmore , Capparoe , Nenagh

2m
17600614CONDITIONAL30 May 2017

dwellinghouse, garage, waste water treatment system, entrance, driveway along with all ancillary site works

Kilmore , Capparoe , Nenagh

156m
2360424N/A18 Jun 2023

construction of dwelling house, garage, waste water treatment system and entrance along with all ancillary site works

Lisbrien , Capparoe , Nenagh Co Tipperary

165m
2260238CONDITIONAL20 May 2022

a dwelling house, garage, waste water treatment system and entrance along with all ancillary site works

Lisbrien , Capparoe , Nenagh Co Tipperary

165m
2360435CONDITIONAL20 Jun 2023

the construction of a dwelling house, garage, waste water treatment system & entrance along with all ancillary site works

Lisbrien , Capparoe , Nenagh Co. Tipperary

373m
19600111CONDITIONAL12 Feb 2019

a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins, 4 no. inverter units, underground cable ducts, hard standing area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated site works

Lisbrien , Nenagh , Co. Tipperary

373m
25206REFUSED8 Oct 2025

19600111 a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins, 4 no. inverter units, underground cable ducts, hard standing area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated site works

Lisbrien , Nenagh , Co. Tipperary

547m
2660606CONDITIONAL22 Jun 2026

change of house design to that granted under planning ref: 2260722 including: a) Internal modifications and upgrades to the existing dwelling house (Protected Structure S243) and creation of openings to the new extension b) Single storey and part two-storey rear extension to the existing dwelling house c) Removal of existing derelict out-house and formation of new domestic garage d) Wastewater treatment system and all associated site works

Lisbrien , Lissenhall , Nenagh Co. Tipperary

547m
2260722CONDITIONAL19 Dec 2022

a) Two new rooflights one in each gable roof hip; b) Single storey extension to the rear : Kitchen, dining, living area, WC, utility, en-suite & service store; c) Patio area to the rear and side; d) Removal of derelict outhouse & formation of a new side parking area; e) Wastewater Treatment system; f) Internal modifications to create 2 No. en-suite shower rooms at first floor and ground floor openings to the rear extension

Lisbrien , Lissenhall , Nenagh

576m
17600175N/A23 Feb 2017

dwelling house, domestic garage, entrance, wastewater treatment system and all associated site works

Barravie , Cappamore , Nenagh

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?