The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

17600689

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

construction of a two storey extension to the rear of existing dwelling with alterations to the existing roof and wall elevations, minor internal alterations to existing and alteration to existing entrance all with associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jun 2017

  2. Further information requested

    9 Aug 2017

  3. Further information received

    2 Oct 2017

  4. Decision: CONDITIONAL

    19 Oct 2017

  5. Decision due

    29 Oct 2017

  6. Grant issued

    23 Nov 2017

Application Details

Location
8 Marlfield Cottages , Marlfield , Clonmel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
19 June 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 October 2017
Grant Date
23 November 2017
Permission Expires
22 November 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

45m
20158CONDITIONAL21 Feb 2020

construction of a single-storey link and storey-and-a-half extension ancillary family accommodation and all associated works

5 The Cottages , Marlfield Road , Clonmel

84m
21987CONDITIONAL8 Jul 2021

alterations to existing dwelling housing including partial demolition for replacement, three additional front windows, roof finish replacement, 5 sqm rear extension and of associated site works

4 The Cottages , Marlfield Road , Clonmel

260m
2660122CONDITIONAL16 Feb 2026

single storey extension to the side (South) of dwelling, conversion of attic to storage areas, with associated rooflights and minor alterations to rear (East) and side (South) elevations

Marlfield , Clonmel , Co.Tipperary

265m
2560585CONDITIONAL20 Jun 2025

the changes to previously approved permission (Ref no. 2260698) comprising of alterations to houses No. 1 and No. 2 including increase of floor area and changes to elevations

Inishlounaght , Marlfield , Clonmel Co. Tipperary

347m
2260698CONDITIONAL14 Dec 2022

construction of 49 no. residential units, new vehicular and pedestrian entrance, together with all roads, footpaths, underground services, connection to public services, surface water detention basin, car-parking, pedestrian and cycle connection to Mountain View estate, public open space, public lighting and associated site boundary and site development works

Inishlounaght , Marlfield Clonmel , Co. Tipperary

398m
19600953N/A28 Aug 2019

construction of a domestic garage to the side of existing dwelling house with dropped kerb to existing public footpath, separate access and access drive, all associated site works

36 Gort Na Manach , Cahir Road , Clonmel

399m
19600097CONDITIONAL7 Feb 2019

completion of infrastructural work commenced under previous Permissions Nos. 05/43 and 07/107 and to construct 22 no. two-storey houses complete with external works and site development works, on their site. The development will include 10 no. detached 4-bedroom houses; 8 no. semi-detached 4-bedroom houses and 4 no. semi-detached 3-bedroom houses and will represent completion of the final phase of Gort na Manach

Gort na Manach , Cahir Road Inishlounaght , Clonmel

402m
17601211REFUSED3 Nov 2017

to alter the layout and proposed house types on part of the site and to incorporate the total number of houses from 72 to 74, existing planning permission ref. no. 05/43. The proposed changes are to the Cul-de-Sac at the southern end of the site and will include the following: omit 9 No. Houses Nos. 53 - 60 inclusive and No. 72 (4 No. 3 bedroom single storey houses Type 53b) and 5 no. 4 bedroom dromer type house Type 54Dr/54DRH) Re Number Houses Nos. 61-71 inclusive as Nos 62-72, Add back 11 No. Houses to be numbered 53 - 61 inclusive and Nos. 73-74 (4 No 2 storey Semi Detached 3 Bedroom House Type 3TA1 / 3TA1H) 5 No. 2 storey detached 4 bedroom house type 54C1 / 54C1H, 2 no. 2 storey detached 5 bedroom House Type 55C1/55C1H) Changes to external works and to site development works will also be included under clause B 42 (1A)(a)(V)

Gort na Managh , Abbey Farm , Cahir Road

404m
2660539N/A3 Jun 2026

the construction of a residential housing estate. The development will consist of the construction of a 55-unit residential estate, comprising: 10 no. semi-detached 4-bedroom 2-storey houses; 32 no. semi-detached 3-bedroom 2-storey houses; 1 no. detached 2-bedroom single-storey house; 2 no. 2- storey terraced blocks containing 4 No. 2-bedroom mid terrace townhouses and 4 no. end of terrace 3-bedroom townhouses; and 1 no. 2-storey maisonette apartment block containing 4 no. 2-bedroom apartments. Other works as part of the development will include: (a) connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097, and (b) the adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout

Gort Na Manach Abbey Farm , Cahir Road Inishlounaght T/D , Clonmel

405m
19601066CONDITIONAL25 Sept 2019

construction of a domestic garage to the side of existing dwelling house with dropped kerb to existing public footpath, separate access and access drive, all associated site works

36 Gort Na Manach , Cahir Road , Clonmel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?