17601082
N/ATipperary - Tipperary County Council
Proposed Development
construction of a two storey over basement dwelling, site entrance and all associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Ballina Road , Garrynatineel , Ballina
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 2 October 2017
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
two storey over basement dwelling, site entrance and all associated site works
Ballina Road , Garrynatineel , Ballina
construction of a new dwelling, site entrance and all associated site works
Ballina Road , Garrynatineel , Ballina
construction of a new dwelling, site entrance and all associated site works
Ballina Road , Garrynatineel , Ballina
construction of a two storey over basement dwelling, site entrance and all associated site works
Ballina Road , Garrynatineel , Ballina
(a) design changes to garage from previous planning permission ref.14600209 (not yet constructed), including relocation of position of garage from south boundary to north boundary and (b) all associated site works
Garrynatineel , Ballina , Co. Tipperary
remedial works to an existing septic tank system to include installation of new pump chamber and a replacement percolation area
Garrynatineel , Ballina , Co. Tipperary
to undertake remedial works to existing septic tank system to include installation of new pump chamber and a replacement percolation area
Roulagh , Ballina , Co. Tipperary
- A single storey extension to the northern end of the Production/Administration Building - New single storey link corridor between Production/Administration Building and Warehouse - New single storey extension accessed from new Link Corridor - Retention of existing single storey refrigeration building with new connection to new corridor - Relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor - Retention of 2nr. existing containerised refrigeration units to the south-west of unit 2 - New first floor windows to north elevation of Production/Administration Building - All associated ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application
Technopath Manufacturing Ltd , Fort Henry Business Park , Ballina
for Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
Clarisford Park , Moys , Killaloe Co. Clare
replacement of a one storey dwelling, shed, septic tank and percolation area with (i) a two storey house with basement, (ii) wastewater treatment system and polishing filter and all associated site works including new boundary treatment and relocation of the existing vehicle entrance
Lake Breeze , Garynatineel , Ballina
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?