The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

17601082

N/A

Tipperary - Tipperary County Council

Proposed Development

construction of a two storey over basement dwelling, site entrance and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Ballina Road , Garrynatineel , Ballina
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
2 October 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
17601415N/A21 Dec 2017

two storey over basement dwelling, site entrance and all associated site works

Ballina Road , Garrynatineel , Ballina

21m
18600969N/A2 Aug 2018

construction of a new dwelling, site entrance and all associated site works

Ballina Road , Garrynatineel , Ballina

23m
18600887N/A11 Jul 2018

construction of a new dwelling, site entrance and all associated site works

Ballina Road , Garrynatineel , Ballina

35m
18601494N/A19 Dec 2018

construction of a two storey over basement dwelling, site entrance and all associated site works

Ballina Road , Garrynatineel , Ballina

206m
18600346CONDITIONAL21 Mar 2018

(a) design changes to garage from previous planning permission ref.14600209 (not yet constructed), including relocation of position of garage from south boundary to north boundary and (b) all associated site works

Garrynatineel , Ballina , Co. Tipperary

413m
18601156CONDITIONAL24 Sept 2018

remedial works to an existing septic tank system to include installation of new pump chamber and a replacement percolation area

Garrynatineel , Ballina , Co. Tipperary

415m
18601102N/A10 Sept 2018

to undertake remedial works to existing septic tank system to include installation of new pump chamber and a replacement percolation area

Roulagh , Ballina , Co. Tipperary

436m
2460893N/A17 Oct 2024

- A single storey extension to the northern end of the Production/Administration Building - New single storey link corridor between Production/Administration Building and Warehouse - New single storey extension accessed from new Link Corridor - Retention of existing single storey refrigeration building with new connection to new corridor - Relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor - Retention of 2nr. existing containerised refrigeration units to the south-west of unit 2 - New first floor windows to north elevation of Production/Administration Building - All associated ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application

Technopath Manufacturing Ltd , Fort Henry Business Park , Ballina

438m
2560221CONDITIONAL28 Apr 2025

for Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application

Clarisford Park , Moys , Killaloe Co. Clare

442m
18600201CONDITIONAL20 Feb 2018

replacement of a one storey dwelling, shed, septic tank and percolation area with (i) a two storey house with basement, (ii) wastewater treatment system and polishing filter and all associated site works including new boundary treatment and relocation of the existing vehicle entrance

Lake Breeze , Garynatineel , Ballina

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?