17601412
CONDITIONALTipperary - Tipperary County Council
Proposed Development
(1) construct a single storey extension to rear of existing dwelling house, (2) erect pergola/carport to side of dwellinghouse, (3) carry out internal modifications, (4) carry out revised elevational treatment to sides and rear including all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
21 Dec 2017
Decision due
23 Feb 2018
Decision: CONDITIONAL
23 Feb 2018
Grant issued
30 Mar 2018
Application Details
- Location
- No 22 Lakelands , Cullenagh , Ballina
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.185 ha
Timeline
- Registration Date
- 21 December 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 February 2018
- Grant Date
- 30 March 2018
- Permission Expires
- 29 March 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
2 no. semi-detached dwellings, a 2-bedroom and a 3-bedroom over two storey, together with hard and soft landscaping including driveways and boundary fencing and all associated site works
Lakelands Cullenagh , Ballina , Co. Tipperary
demolition of the existing garage, the contruction of a new single storey pitched roof extension to the North side of the existing dwelling, the construction of a Garage to the South Eastern corner of the site, a new dormer window at roof level, internal alterations to the floor layouts and associated fenestration and door reconfigurations, all along with associated landscaping, ancillary and site works
Lakeview , Cullenagh , Ballina
demolition of the existing garage, the construction of a new single storey pitched roof extension to the north of the existing dwelling, the construction of a garage to the south-eastern corner of the site, a new dormer window at roof level, internal alterations to the floor layouts and associated fenestration and door reconfigurations, all along with associated landscaping, ancillary and site works
Lakeview , Cullenagh , Ballina Co. Tipperary
to erect extensions comprising entrance hall and sunroom to house and to erect a garden shed, replace existing patio door with window on front elevation and install a new driveway and parking area at the front of the house and all associated site works
9 Lakeview , Cullenagh , Ballina
to erect extensions comprising entrance hall and sunroom to house and to erect a garden shed, replace existing patio door with window on front elevation and install a new driveway and parking area at the front of the house and all associated site works
9 Lakeview , Cullenagh , Ballina
2 no. semi-detached dwellings and all necessary ancillary site development works, including entrances and connections to public water main and sewers
Lakelands , Cullenagh , Ballina Co. Tipperary
construct a single storey extension to the side of existing dwelling, consisting of a garage, bathroom and utility, together with elevational changes to the existing house and ancillary site works
17 Fernhill , Cullenagh , Ballina
the erection of a 2 storey house, (partially concealed in a steeply sloping site), all boundary treatment to match the adjoining properties, connection to the water and sewerage services, entrance and driveway and all associated site works, on and under land
No. 13 Lakeview , Cullenagh , Ballina
the construction of a 2 storey detached dwelling, boundary walls, entrance gates and associated site works which was previously granted planning permission under Planning Authority References 16601053
13 Lakeview , Cullenegh , Ballina
development at c. 0.07 Ha site as follows: the construction of a basement (65 sq m) in use as a home gym/storage; the construction of an incomplete garage (39 sq m) that is partially at basement level and partially at street level (to the north-west), which includes 2 No. retaining walls (a maximum of c. 3.3 metres above finished lower ground level); the construction of a retaining wall to the rear (north-west) of the site (c. 3 metres above finished lower ground level); and the construction of the dwelling with a lower height than the permitted dwelling originally granted under TCC Reg. Ref. 51/22930 (the maximum roof height permitted was +59.53 and the dwelling was constructed with a maximum roof height of +57.58) and PERMISSION for the completion of the partially constructed garage (provision of wall, roof and shutter); the provision of a landscaped deck garden at ground floor level (partially above the garage); the construction of a glass balustrade and planting on the retaining wall to the rear (north-west); the construction of an access landing area at the first floor level to allow access to the existing doorway to the south-west; the provision of access stairs and decks; ancillary landscaping (including grass, hedging and planting); site boundary works including timber fencing to match existing, and provision of gates and walls to enclose the site; and all site development works above and below ground
No. 19 Lakeview , Cullenagh , Ballina Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?