176239

CONDITIONAL

Westmeath - Westmeath County Council

Proposed Development

The development will consist of a ground mounted solar photovoltaic (PV) farm consisting of the following; up to an area of 139,520 m2 of solar panels on ground mounted steel frames within a site area of 46.3 hectares; a fenced electricity substation compound to include 1 no. electricity control building and hardstands for ancillary electrical equipment; 12 no. inverter/transformer stations; underground cable and ducts; internal access tracks and hardstanding areas; boundary security fence; CCTV and all associated site services and works, 2 no. new site access points from the public road, one for construction/decommissioning traffic purposes only, and one for operational traffic. Permission is sought for a period of 10 years

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Aug 2017

  2. Further information requested

    23 Oct 2017

  3. Further information received

    16 Jan 2018

  4. Decision due

    12 Feb 2018

  5. Decision: CONDITIONAL

    12 Feb 2018

  6. Appeal submitted

    9 Mar 2018

  7. Appeal decided: MODIFIED

    15 Feb 2019

Application Details

Location
Clondardis and Slane More townlands , Walshestown , Mullingar
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Westmeath County Council

Timeline

Registration Date
29 August 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 February 2018
Permission Expires
14 February 2024

An Coimisiún Pleanála Appeal

Appeal Reference
ABP 301116-18
Decision
MODIFIED
Submitted
9 March 2018
Decided
15 February 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
206132CONDITIONAL2 Jun 2020

Amendment of the design of the approved development (Westmeath County Council Planning Reg. Ref. 17/6239 & An Bord Pleanala Reg, Ref. PL25M.301116) which comprises consent for the development of a ground mounted solar photvoltaic (PV) farm consisting of the following; up to an area of 139,520 m2 of solar panels on ground mounted steel frames within a site area of 46.3 hectares; a fenced electricity substation compound to include 1 no. electricity control building and hardstands for ancillary electrical equipment; 12 no. inverter/transformer stations; underground cable and ducts; internal access tracks and hardstanding areas; boundary security fence; CCTV and all associated site services and works, 2 no. new site access points from the public road, one for construction / decommissioning traffic purposes only, and one for operational traffic. Amendments proposed are optimised Solar PV Panel configuration located within the same areas of the site as previously permitted with the exception of a reduced buffer distance under the existing 110Kv lines from c.56m to c.46 m to comprise up to 252000 square meters of solar panels to allow for solar panel array height increase from up to 2.8m to 3.2m. Modifications and enlargement to the onsite substation and substation compound. The substation will increase in size from c.55 m2 as permitted to c.150 m2 and the substation compound will increase in size from c.700 m2 as permitted to c.1081 m2. Omission of 2 no. inverter/transformer hard standing areas and minor changes of position of hardstanding from the permitted solar development to allow for a total of 10 hardstanding areas which will provide the base for 20 no. inverter and transformer units housed in sound pression containers, Permission is also sought to amend the life span of the consented development from 25 years to 30 years.

Clondardis & Slanemore , Walshestown , Mullingar

525m
176028CONDITIONAL3 Feb 2017

10 year permission which will consist of a solar farm with an export capacity of 12.458mw comprising photovoltaic panels on ground mounted frames with associated infrastructure including 7 no. invertor cabins, 1 no. control building, 1 no. customer cabin, 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks.

Slanemore , Mullingar , Co Westmeath

578m
2360200CONDITIONAL4 Jul 2023

an amendment planning application previously granted permission under references PL/17/6028 & PL/17/6224 in the townland of Slanemore, Mullingar, Co Westmeath. The proposed amendments to the previously consented solar farm will include the following: • Provision of a new 38kV on-site substation control building & compound • Reconfiguration of consented solar array to optimise layout • Reconfiguration of internal maintenance/access roads • Provision of a new access from the R393 Regional Road • Adjustments to the red line boundary to cater for the new access and access track

Slanemore , Mullingar , Co Westmeath

640m
186215CONDITIONAL11 Jul 2018

5 year permission for the construction of an Energy Storage Facility comprising battery containers and associated infrastructure including combined power conversion systems, grid connection compound, electrical substation, transformers and grid compliance equipment, temporary construction compound, ducting and electrical cabling, fencing, CCTV cameras, landscaping and access tracks.

Slanemore , Mullingar , Co.Westmeath

650m
2360306REFUSED17 Sept 2023

development which will consist of amending the existing granted application (Planning Reference 18/6215) at this site. The amendment application will consist of permission to amend the design of the approved development (Planning Reference 18/6215) which comprises consent for a Battery Storage Facility. Proposed amendments include; (1) re-location of 3No. Battery Containers, 3No. HVAC units and 3No. Combined Power Conversion Systems and Transformers and (2) the project lifetime is proposed to be extended from 5 to 10 years

Townland of Slanemore , Mullingar , Co. Westmeath

664m
2360394CONDITIONAL18 Nov 2023

construction of a dwelling house, detached garage with septic tank & percolation area with all ancillary site works

Slanestown , Walshestown , Mullingar Co. Westmeath.

703m
206287CONDITIONAL19 Oct 2020

Permission to construct one number detached bungalow, one number detached garage, to construct new access lane and new entrance to public road (Access and laneway currently granted permission under planning ref 17/6239 & 20/6132) to install a septic tank and percolation area, to connect to public watermain and all associated site works

Slanemore , Mullingar , Co Westmeath

743m
2360049CONDITIONAL3 Mar 2023

construction of a dwelling house & detached garage with septic tank & percolation area with all ancillary site works

Slanestown Walshestown , Mullingar , Co. Westmeath.

780m
176224CONDITIONAL11 Aug 2017

10 year permission, the development will consist of a proposed 4.392MW extension to a planning approval solar farm (ref 17/6028). The proposed extension will comprise of photovoltaic panels on ground mounted frames with associated infrastructure including 2 no invertor cabins, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks.

Slanemore , Mullingar , Co Westmeath

793m
2560443CONDITIONAL4 Sept 2025

Retention Permission for development. The development will consist of the retention of: • A ground floor window on the north-facing elevation of the existing dwelling. • A single-storey ground floor extension to the west-facing (rear) elevation of the existing dwelling, comprising a Dining room, master bedroom with ensuite and walk-in wardrobe, together with connection to the existing sewerage system and all associated site works. • A partitioned hobby room and toilet area within the existing detached shed, together with connection to the existing sewerage system.

Slanestown Walshestown , Mullingar , Co. Westmeath

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?