The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

17648

N/A

Clare - Clare County Council

Proposed Development

to RETAIN partially constructed forestry entrance and complete the construction of the entrance to existing forestry along with ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
Lack West Tld , Kilmihil , Co. Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council

Timeline

Registration Date
21 August 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
17909CONDITIONAL24 Nov 2017

to RETAIN partially constructed forestry entrance and complete the construction of the entrance to existing forestry along with ancillary site works

Lack West Townland , Kilmihil , Co. Clare

252m
22685CONDITIONAL28 Jul 2022

to construct a new dwelling house, private garage, site entrance, private on-site wastewater treatment system and all associated site works

Lack West , Kilmihil , Co Clare

425m
21393REFUSED26 Apr 2021

the development will consist of a private dwelling c/w private garage and ancillary site works

Kilrush Road , Kilmihil , Co Clare

431m
2660077N/A17 Feb 2026

the development will consist of: Decommissioning and removal from the site of the existing tanks, sumps, pipework, and equipment and all other associated clearance works; construction of a new (1) above ground inlet works complete with splitter chamber, (2) storm water holding tank complete with storm water overflow discharging to the Kilmihil Stream, (3) aeration tanks, (4) settlement tanks, (5) number of pumping stations, (6) sludge drying reed beds, (7) final effluent pumping station complete with new final effluent rising main and headwall for discharge to the Doonbeg River, (8) welfare building to include a control room, toilet, kitchenette, office and drying room, and (9) all associated works including all associated interconnecting above and below ground pipework, valves, plant and equipment, construction of an internal access road, 2 no. parking spaces, new security fencing of 2.4m high green steel palisade fence, and landscaping. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development

Kilrush Road Lack West and Ahaga , Kilmihil , Co. Clare

450m
21410CONDITIONAL28 Apr 2021

to construct a new dwelling house and private garage along with a new entrance, new sewerage and water facilities along with all necessary ancillary works

Lack West , Kilmihil , Co Clare

526m
2268REFUSED1 Feb 2022

for the development which will consist of a dwelling house, a private garage, connection to the public sewer and ancillary site works

Kilrush Road , Kilmihil , Co Clare

526m
21392REFUSED26 Apr 2021

the development will consist of a dwelling house, c/w private garage and all ancillary site works

Kilrush Road , Kilmihil , Co Clare

556m
17750CONDITIONAL2 Oct 2017

to construct a new dwelling house, private garage, create new entrance and sewerage treatment facilities along with all associated works

Lack West , Kilmihil , Co. Clare

653m
21569CONDITIONAL3 Jun 2021

to construct an extension to the west side of an existing dwelling house and alterations to the front porch including widening the front door and removing side windows, along with ancillary works

Lack West , Kilmihil , Co Clare

719m
22615CONDITIONAL7 Jul 2022

of minor variations to the dwelling as constructed with respect to permission P00/1112, retention of a home workshop and dog kennels for use ancillary to the residential use, and the retention of open agricultural storage sheds

Kilmihil , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?