176613
N/ACork - Cork City Council
Proposed Development
Retention of 6 no. 9 meter high floodlights which light an existing sand based playing area, 5 no. existing storage containers, the existing club shop and an existing Porta Cabin which currently functions as a driving test centre.
View the full application file on the council's planning portal →Application Timeline
Application received
6 Oct 2017
Decision due
30 Nov 2017
Application Details
- Location
- Tanner Park , Coolroe , Ballincollig
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 6 October 2017
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
- Decision Due
- 30 November 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The installation of floodlighting consisting of the replacement of the existing floodlighting serving 2 no. secondary pitches with of 9 no. 21 metre high floodlighting masts and 6 no. 21 metre high floodlighting masts to serve the main pitch.
Tanner Park , Coolroe , Ballincollig
Permission for temporary construction of a single storey prefab educational extension (containing 2 no. classrooms and ancillary rooms) and all associated site works and permission for retention for temporary construction of a single storey prefab educational building (containing 3 no. classrooms with administration and ancillary rooms).
Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe
Permission for temporary construction of a prefab educational modular building extension (containing 2 no. classrooms and ancillary rooms) over existing ground floor prefab educational modular building (creating a first floor), with a prefab modular two-storey stair core extension to side and all associated site works.
Gaelscoil and Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe
Permission for retention for temporary construction of a single and two-storey prefab educational building (containing 9 no. classrooms with administration and ancillary spaces), 2 no. bicycle shelters and all associated site works.
Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe
Permission for temporary construction of a single storey prefab educational extension (containing 2 no. classrooms and ancillary rooms) and all associated site works.
Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe
Temporary construction of a single storey prefab educational building (containing 3no. classrooms with administration and ancillary rooms) and all associated site works including hardcore surfacing (938sq.m) of an existing sand based training pitch to front of proposed building, and retention of existing tarmac playing surface (300sq.m) and perimeter fencing to side of proposed building.
Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe
Temporary construction of a single storey prefab educational building (containing 3no. classrooms with administration and ancillary rooms) and all associated site works including hardcore surfacing (938sq.m) of an existing sand based training pitch to front of proposed building, and retention of existing tarmac playing surface (300sq.m) and perimeter fencing to side of proposed building.
Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe
Temporary construction of a single storey prefab educational building (containing 3no. classrooms with administration and ancillary rooms) and all associated site works including hardcore surfacing (938sq.m) of an existing sand based training pitch to front of proposed building, and retention of existing tarmac playing surface (300sq.m) and perimeter fencing to side of proposed building.
Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe
Retention of (a) 6 no. 9 meter high floodlights which light an existing sand based playing area, (b) 5 no. existing storage containers, (c) the existing club shop with associated timber fencing, (d) an existing Porta Cabin which currently functions as a driving test centre with associated timber fencing; (e) timber fencing and decking serving the existing club house.
Tanner Park , Coolroe , Ballincolllig
Retention of (a) an existing sand based playing pitch with ancillary fencing and 6 no. 9 metre high floodlights; (b) 5 no. existing storage containers, (c) the existing club shop with associated timber fencing, (d) an existing Porta Cabin which currently functions as a driving test centre with associated timber fencing; (e) timber fencing and decking serving the existing club house; (f) the existing changing room building with ancillary access ramp and railings (change of plan from permitted under application reference 03/1903).
Tanner Park , Coolroe , Ballincollig
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?