The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

17703

CONDITIONAL

Mayo - Mayo County Council

Proposed Development

CONSTRUCT A NEW ASTRO TURF (MUGA) ALL-WEATHER PITCH TOGETHER WITH 2 NO. GOALPOSTS. CONSTRUCTION OF 2 NO. 9.00M WIDE X 5.00M HIGH "HURLING WALL" COMPLETE WITH BUTTRESS SUPPORTS AS NECESSARY AND 1.0M HIGH BALL STOP NETTING ABOVE (TOTAL HEIGHT =6.00M) PROVISION OF 2.50M HIGH WIRE MESH SECURITY FENCE INCORPORATING ACCESS GATES WITH 3.5M HIGH BALL STOP NETTING AND ASSOCIATED SUPPORT POLES ABOVE FENCE (TOTAL HEIGHT=6.00M) TO PERIMETER OF PROPOSED NEW ASTRO TURF (MUGA) PITCH. PROVISION OF 4 NO. 12M HIGH OCTAGONAL GALVANISED STEEL FLOODLIGHT COLUMNS, EACH COMPLETE WITH 3 NO. LED FLOODLIGHT LUMINAIRES . ALL THE ABOVE TO INCLUDE ALL ANCILLARY SITE DEVLOPMENT WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Aug 2017

  2. Further information requested

    20 Oct 2017

  3. Further information received

    18 Jun 2018

  4. Decision: CONDITIONAL

    12 Jul 2018

  5. Decision due

    15 Jul 2018

  6. Appeal submitted

    8 Aug 2018

  7. Grant issued

    17 Dec 2018

  8. Appeal decided: MODIFIED

    17 Dec 2018

Application Details

Location
ABBEYHALFQUARTER , BALLINA
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council

Timeline

Registration Date
31 August 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 July 2018
Grant Date
17 December 2018
Permission Expires
16 December 2023

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-302270-18
Decision
MODIFIED
Submitted
8 August 2018
Decided
17 December 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
2660002CONDITIONAL17 Dec 2025

Full planning permission for the following: 1. The demolition of the existing Sean Duffy Community Centre 2. The construction of a new proposed community centre and sports facility ancillary to Ardnaree Sarsfields sport pitch 3. The provision of new carpark, all this together with connection to services and all associated site works

Abbeyhalfquarter , Ballina , Co.Mayo.

194m
201043CONDITIONAL22 Dec 2020

TEMPORARY CHANGING FACILITIES AND ALL ASSOCIATED SITE WORKS

BUNREE ROAD , ABBEYHALFQUARTER , BALLINA

232m
20974CONDITIONAL10 Dec 2020

CONSTRUCTION OF AN EXTENSION TO AN EXISTING INDUSTRIAL UNIT AND FOR RETENTION OF SIGNAGE TO THE FRONT OF THE EXISTING BUILDING

UNIT 4 BUNREE INDUSTRIAL ESTATE , BUNREE ROAD , BALLINA

303m
2660329CONDITIONAL24 Apr 2026

to a) Subdivide the property into 2 separate properties, b) Create a new entrance and c) retain 3 number ancillary buildings on site along with all associated site works

Bunree Industrial Estate , Abbeyhalfquarter , Ballina Co. Mayo

319m
2047CONDITIONAL31 Jan 2020

DEMOLISH SINGLE STOREY ANNEX TO REAR OF EXISTING DWELLING HOUSE, CONSTRUCT NEW TWO STOREY EXTENSION AND CARRY OUT ALTERATIONS AND RENOVATIONS TO EXISTING DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS

15 ARDNAREE , BALLINA , CO. MAYO

355m
2360446CONDITIONAL25 Oct 2023

Full planning permission for a proposed extension to an existing commercial unit, together with connection to existing public services to include all associated site works

Abbeyhalfquarter , Ardnaree , Ballina

363m
17762CONDITIONAL22 Sept 2017

CONSTRUCT 2 INDUSTRIAL UNITS, TOGETHER WITH CONNECTION TO EXISTING PUBLIC SERVICES AND ANCILLARY SITE WORKS

ABBEYHALFQUARTER , ARDNAREE , BALLINA

371m
22833CONDITIONAL21 Sept 2022

DEMOLISH SINGLE STOREY ANNEX TO REAR OF EXISTING DWELLING HOUSE. CONSTRUCT NEW TWO STOREY EXTENSION AND CARRY OUT ALTERATIONS AND RENOVATIONS TO EXISTING DWELLING HOUSE, TOGETHER WITH ALL ASSOCIATED SITE WORKS

28 ABBEY STREET , BALLINA , CO. MAYO

379m
17775CONDITIONAL2 Oct 2017

RETENTION OF EXISTING GARAGE TO REAR OF PROPERTY, INCLUDING ALL OTHER ASSOCIATED WORKS AND SERVICES

4 SHANAGHY HEIGHTS , BALLINA , CO. MAYO

385m
211381CONDITIONAL22 Dec 2021

CHANGE OF USE OF PART OF EXISTING BUILDING TO RETAIL USE. PERMISSION IS ALSO SOUGHT FOR EXTERNAL SIGNAGE TO THE EXISTING FRONT ELEVATION AS SHOWN ON PLANS AND ALL ANCILLARY SITE DEVELOPMENTS

BUNREE INDUSTRIAL ESTATE , ABBEYHALFQUARTER , BALLINA

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?