17705

N/A

Galway - Galway County Council

Proposed Development

to retain the foundation and to construct some engineering works, and a fully serviced dwelling house, garage and a treatment plant. (Gross floor space for retention: 118 sqm; Gross floor space of proposed works: 190 sqm.)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 May 2017

  2. Application withdrawn

    12 Jul 2017

Application Details

Location
Curraghaun ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.21 ha

Timeline

Registration Date
18 May 2017
Status
WITHDRAWN
Decision
N/A
Withdrawn
12 July 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
171341N/A8 Sept 2017

of the existing dwelling house raft foundation, which is constructed, and the stoned up area to the front of the site. Gross floor space of proposed works House 181sqm, Garage 40sqm.

Curraghaun (ED Addergoole) ,

21m
171722CONDITIONAL30 Nov 2017

for existing dwelling house, raft foundation, which is constructed, and the stoned up area to the front of the site. Full planning sought to complete the construction of the dwelling house. Full planning permission also sought to create a new exit/entry gate, erect a new domestic garage/fuel store, to install a wastewater treatment system, percolation area and all ancillary site works. Gross floor space of proposed works Dwelling 181sqm, Garage 40sqm. Gross floor space of work to be retained 117sqm (Raft).

Curraghaun ,

31m
2360029CONDITIONAL20 Jan 2023

of the existing domestic garage/fuel store/storage shed .Gross floor space of work to be retained 66.50sqm

Curraghaun , Dunmore , Co. Galway

33m
171743CONDITIONAL6 Dec 2017

of the existing dwelling house, raft foundation, which is constructed, and the stoned up area to the front of the site. Full planning permission sought to complete the construction of the dwelling house. full planning permission also sought to create a new exit/entry gate, erect a new domestic garage/fuel store, to install a wastewater treatment system, percolation area and all ancillary site works. Gross floor space of proposed works Dwelling 184sqm, Garage 40sqm. Gross floor space of work to be retained raft 120sqm.

Curraghaun ,

92m
2360526CONDITIONAL18 May 2023

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works. Gross floor area of proposed works: House=255 sqm, Garage=60 sqm

Curraghaun , Dunmore , Co. Galway

208m
2361165CONDITIONAL28 Sept 2023

for the existing cattle holding facilities (area = 177 m2), full planning permission also to install a underground effluent storage tank & all ancillary site works

Curraghaun , Dunmore , Co. Galway

630m
2660964CONDITIONAL12 Jun 2026

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works

Curraghaun , Dunmore , Co. Galway

630m
2660784N/A18 May 2026

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works

Curraghaun , Dunmore , Co. Galway

661m
2561735CONDITIONAL26 Nov 2025

to construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works

Curraghaun , Dunmore , Co. Galway

685m
2460544CONDITIONAL13 May 2024

to carry out the following 1: demolish the existing rear extension. 2: construct a new extension to the rear of the dwelling house. 3: Retain the existing walls /splays as constructed each side of the existing entrance gate and all ancillary site works. Gross floor space of proposed works: 61.00 sqm. Gross floor space of any demolition: 8.00 sqm

Curraghaun , Dunmore , Co. Galway

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.